Change of Use / Change of Occupancy Permit — Center, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://library.municode.com/co/center/codes/code_of_ordinances?nodeId=CH44ZO_ART44-XADEN
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Center, Colorado
RESEARCHED 2026-08-13: the Town of Center has a real, directly codified change-of-use requirement. Town of Center Municipal Code Sec. 44-211(a) (Article 44-X, Administration and Enforcement, of Chapter 44 Zoning — read in full live via Municode, current through Ord. No. 571, enacted 4-23-2024, republished 5-5-2025) states that 'every application for a Building Permit for construction, moving, alteration, or changes in the type of use or type of occupancy shall be accompanied by' a written statement and scaled plans showing (among other things) 'the existing and intended use of the plot and all structures upon it.' This directly requires a Building Permit for a change in the type of use or occupancy, independent of whether any physical construction accompanies the change — it is a genuinely codified legal requirement, not merely an inference from the general building-permit process. Unlike Burlington, CO (a peer town in this corpus whose combined form has an explicit 'Part B: Change of Use' field implementing an equally explicit statutory certificate-of-zoning-compliance requirement), Center's own combined Building Permit Application has no dedicated 'Change of Use' checkbox among its listed project types (New Construction, Addition(s), Mobile Home, Fence-New/Replace, Deck or Patio, Reroof, Shed, Siding or Stucco, New Water/Gas/Sewer Tap, Other) — a pure change of use would be filed under 'Other,' even though the underlying legal obligation is directly codified in Sec. 44-211(a) itself, not merely implied by the form's structure.
Verified 2026-08-13 · Source
When you need this permit
- A Building Permit is required for 'changes in the type of use or type of occupancy' of any building or structure, per Town of Center Municipal Code Sec. 44-211(a) — this applies independent of whether physical construction accompanies the use change
- The application must be accompanied by a written statement and scaled plans/plots showing: the shape/location/dimensions of the lot, the shape/size/location of buildings and structures on the plot, 'the existing and intended use of the plot and all structures upon it,' and any other information needed to determine Zoning Code compliance (Sec. 44-211(a)(1)-(4))
- Applications are required in duplicate form (Sec. 44-211(a))
- File on the Town's combined Building Permit Application, checking 'Other' under Project Information/Type and describing the existing and proposed use, since no dedicated 'Change of Use' checkbox exists on the Town's form
- Issuance of the permit is approved by the Town Administrator when Zoning Code conditions are met (Sec. 44-210(f), 44-211(c)); if disapproved, the cause must be stated in writing (Sec. 44-211(d))
- Issuance of a Building Permit does not waive any other Zoning Code provision or Town ordinance (Sec. 44-211(b))
- If the change of use also involves construction, moving, or alteration, this entry's requirements apply alongside (not instead of) this file's residential-addition-remodel or commercial-tenant-improvement entries
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
If construction accompanies the change of use, the general Final Inspection documented in this file's residential-building-permit and commercial-tenant-improvement entries applies; no separate inspection sequence for a pure use-change (no construction) is published
See the full Center inspection guide — scheduling & re-inspection fees →
Tips
- Center's change-of-use requirement is genuinely codified (Sec. 44-211(a)) and not merely a line item on the intake form — a change in the type of use or occupancy requires a Building Permit even if no construction is planned, so do not assume a pure use-change (e.g., converting a retail space to an office) is exempt just because nothing physical is being built.
- Unlike Burlington, CO (a peer town in this corpus with an explicit 'Part B: Change of Use' field on its own combined form), Center's Building Permit Application has no dedicated Change of Use checkbox — use 'Other' and describe the existing and proposed use explicitly, since the Town's own ordinance (Sec. 44-211(a)) specifically asks for 'the existing and intended use of the plot and all structures upon it.'
- If your change of use is accompanied by construction, remodeling, or a tenant improvement, see this file's residential-addition-remodel or commercial-tenant-improvement entries, which document the same underlying Building Permit process for the construction-specific requirements.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Center building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Center
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Colorado →