Skip to main content
PermitBase

Sign Permit in Center, Colorado

RESEARCHED 2026-08-13: the Town of Center's Zoning Code (Chapter 44 of the Town's own Code of Ordinances, codified through Ordinance No. 571, enacted April 23, 2024, republished May 5, 2025 — read in full live via the Municode Library's browser-rendered version at library.municode.com/co/center, since a static curl/WebFetch of both the Town's centerco.gov domain and the vanity center.municipalcodeonline.com domain only returns an unrendered Municode Angular shell that misroutes to an unrelated default state page) DOES define the term 'Sign' and two subtypes ('Sign, Advertising' and 'Sign, Animated') in its Article 44-XI Definitions (Sec. 44-221) — but, after reading all eleven articles of Chapter 44 in full, no dedicated Sign Regulations article, dimensional/height/illumination standard, or standalone sign-permit fee exists anywhere in the Zoning Code, and Chapter 10 (Buildings and Building Regulations, including the Town's adopted International Building Code) contains no sign-specific provision either. This is a genuinely confirmed partial gap, not an unexamined assumption: a sign meets the Zoning Code's own definition of 'Structure' (Sec. 44-221: 'Anything constructed, the use of which requires permanent location on the ground or attachment to something having a permanent location on the ground'), and Sec. 44-211(a) requires a Building Permit application for the erection of any 'structure,' so a sign is legally captured by the Town's general Building Permit requirement — it is simply not treated as its own permit type or fee line anywhere in the Town's Building Permit Application / Fee Schedule document (which lists only New Construction, Addition(s), Mobile Home, Fence-New/Replace, Deck or Patio, Reroof, Shed, Siding or Stucco, New Water/Gas/Sewer Tap, and an open 'Other' line — no 'Sign' checkbox).

Reviewed 2026-08-13 · Source

When you need this permit

  • No dedicated sign ordinance, dimensional/height/illumination standard, or sign-specific fee is published anywhere in the Town of Center's Zoning Code (Chapter 44, all 11 articles read in full live via Municode 2026-08-13) or its Building Code (Chapter 10) — confirmed by a full-text read of both chapters
  • A sign meets the Zoning Code's own definition of 'Structure' (Sec. 44-221) and 'Sign' is itself a defined term (Sec. 44-221: 'any object or device or part thereof situated outdoors which is used to advertise, identify, display, direct, or attract attention to an object, business, person, institution, organization, product, service, event, or location'), so erecting a sign requires a Building Permit under Sec. 44-211(a) the same as any other structure
  • File on the Town's combined Building Permit Application, checking 'Other' under Project Information/Type (no dedicated 'Sign' checkbox exists on the form) and describing the sign scope
  • If the sign's status as a 'sign' under the Zoning Code definition is unclear, Sec. 44-221 states the Town Administrator (or authorized representative) shall make that determination
  • Colorado 811 utility locate notification (72 hours' minimum notice) applies if the sign installation involves any digging, per the Town's standard building-permit requirements
  • Confirm with Public Works (719-754-3497) before designing or installing any sign, since no published size, height, setback, or illumination standard exists in the Town's own code to self-certify against

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (structure, via 'Other' line, if a fee applies to a given sign)Town of Center Building Permit Application / Fee Schedule document (revised 09/2025) has no 'Sign' line item; billed under the general schedule since a sign would be filed under 'Other.' Confirm with Public Works whether a small sign is instead treated as fee-exempt in practice, since the fee schedule's square-footage basis does not map cleanly onto most sign installations.
$0.10 per sq. ft. of floor space/area affected, $50.00 minimum (residential); $0.20 per sq. ft., $50.00 minimum (commercial) — the Town's general new-construction/remodeling fee structure, since no sign-specific fee line exists
Application Fee (all permit types)Charged whether the permit is approved or denied, per the Town's June 23, 2026 Public Works Department notice; applies to a sign filing the same as any other permit type
$50.00 flat, non-refundable

Review timeline

Plan reviewCenter’s published plan-review target
1–2 business days

How long did your Sign Permit permit actually take in Center?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    No itemized inspection sequence specific to signs is published; a general final inspection would apply as with other minor structures

See the full Center inspection guide — scheduling & re-inspection fees →

Tips

  • Center's Zoning Code defines 'Sign' and two narrow subtypes ('Sign, Advertising' and 'Sign, Animated') but stops there — there is no dimensional standard (height, area, setback) or illumination rule anywhere in the Code, unlike many peer jurisdictions with a full sign article. Do not assume any particular size or placement rule applies; confirm directly with Public Works before finalizing a sign design.
  • Because a sign is legally a 'structure' under Sec. 44-221, skipping the Building Permit process is not a safe assumption just because there is no dedicated 'Sign' line on the intake form — file under 'Other' and expect the general structure-based fee schedule to apply unless Public Works waives it.
  • The definitions list's abrupt jump from 'Sign, Animated' directly to 'Special Review Use' (skipping typical intermediate terms like 'Sign, Freestanding' or 'Sign Area' that a fuller sign code would define) suggests this section may be an incomplete or templated carryover rather than a deliberately narrow local choice — treat the absence of dimensional standards as a genuine gap to confirm with the Town, not a deliberate 'no rules apply' finding.

Frequently asked questions

Center requires a sign permit for: No dedicated sign ordinance, dimensional/height/illumination standard, or sign-specific fee is published anywhere in the Town of Center's Zoning Code (Chapter 44, all 11 articles read in full live via Municode 2026-08-13) or its Building Code (Chapter 10) — confirmed by a full-text read of both chapters; A sign meets the Zoning Code's own definition of 'Structure' (Sec. 44-221) and 'Sign' is itself a defined term (Sec. 44-221: 'any object or device or part thereof situated outdoors which is used to advertise, identify, display, direct, or attract attention to an object, business, person, institution, organization, product, service, event, or location'), so erecting a sign requires a Building Permit under Sec. 44-211(a) the same as any other structure; File on the Town's combined Building Permit Application, checking 'Other' under Project Information/Type (no dedicated 'Sign' checkbox exists on the form) and describing the sign scope; If the sign's status as a 'sign' under the Zoning Code definition is unclear, Sec. 44-221 states the Town Administrator (or authorized representative) shall make that determination; Colorado 811 utility locate notification (72 hours' minimum notice) applies if the sign installation involves any digging, per the Town's standard building-permit requirements; Confirm with Public Works (719-754-3497) before designing or installing any sign, since no published size, height, setback, or illumination standard exists in the Town's own code to self-certify against. If your project isn't listed, confirm with Town of Center Public Works Department at (719) 754-3497 before starting work.

In Center, the published Building Permit Fee (structure, via 'Other' line, if a fee applies to a given sign) is: $0.10 per sq. ft. of floor space/area affected, $50.00 minimum (residential); $0.20 per sq. ft., $50.00 minimum (commercial) — the Town's general new-construction/remodeling fee structure, since no sign-specific fee line exists. Additional published fees: Application Fee (all permit types) — $50.00 flat, non-refundable. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Center's published plan-review target for a sign permit is 1–2 business days.

You'll need: Building Permit Application (combined form). See the required-documents checklist on this page for details on each.

Center requires 1 inspection(s) for a sign permit, in order: Final Inspection. Schedule each through Town of Center Public Works Department ((719) 754-3497).

Apply through Town of Center Public Works Department at 294 S. Worth Street, Center, CO 81125. Phone: (719) 754-3497, email: cwebb@centerco.gov. Office hours: Monday-Thursday 7:00 AM - 5:00 PM; Friday 8:00 AM - 1:00 PM; Saturday-Sunday Closed. Fax (719) 754-3379.. Official information: https://www.centerco.gov/documents.

There is no standalone sign ordinance or sign-specific permit application. A sign meets the Zoning Code's own definition of a 'structure' (Sec. 44-221), so erecting one requires a Building Permit under Sec. 44-211(a), filed on the Town's combined Building Permit Application under the 'Other' project type.

None are published. The Town's Zoning Code (Chapter 44) was read in full and contains no sign dimensional, height, setback, or illumination standard, despite defining the term 'Sign.' Confirm directly with the Public Works Department (719-754-3497) before designing a sign.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Center building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.