EV Charger / EVSE Permit — Center, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.centerco.gov/uploads/building-permit-application-09-2025-1-.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Center, Colorado
The Town of Center has no standalone EV-charger/EVSE permit type. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit) is electrical work, and per this file's own electrical-permit entry, ALL electrical work in Center is permitted and inspected directly by the State of Colorado Division of Professions and Occupations (DORA/DPO) Electrical Board -- the Town runs no local certified electrical inspection program and its own Building Permit Application/Fee Schedule document directs applicants to the state program for any electrical scope, including an EV charger circuit. The State's electrical permit fee schedule (set under CRS 12-23-117(3), effective statewide April 1, 2016, and applied verbatim by state-inspected jurisdictions) is a real, exact, citable governing figure: for a non-living-area installation like an EV charger circuit (Chart B, Commercial and Other Installations, based on total contract cost of labor and materials), the fee is $100 base for a contract cost up to $2,000, plus $10 per each additional $1,000 (rounded up) above that. Confirmed directly against Greenwood Village, CO's published mirror of the identical statewide schedule on 2026-07-20, and cross-checked against the identical $100-per-$2,000 fee line independently confirmed for Centennial, CO elsewhere in this corpus. Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective August 7, 2024) sets a December 31, 2025 compliance deadline for standardized EV-charging LAND-USE permitting only for municipalities with population 10,000+; Center's population (1,929 per the 2020 Census) is far below this threshold, so the Town is not required to adopt a distinct EV-charging land-use permitting process under this law.
Verified 2026-07-20 · Source
When you need this permit
- EV charger circuit installation is electrical work; apply directly with the Colorado DORA/DPO Electrical Board (1-855-454-0700 or dpo.colorado.gov/Electrical), not the Town of Center
- Electrical contractors are explicitly excluded from the Town's local Contractor's Registration requirement under Ordinance 339 Section One's definition of 'Contractor'
- Electricians must hold the applicable Colorado state electrical license
- Center's population is far below the 10,000-resident threshold that would trigger HB24-1173's mandatory local EV-charging permitting-process compliance deadline for municipalities
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Performed under the Colorado DORA/DPO Electrical Board's own inspection program for the EV charger circuit, not by Town of Center staff
See the full Center inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply for an EV charger circuit on the Town of Center's own Building Permit Application -- electrical work in Center is issued and inspected entirely by the State of Colorado DORA/DPO Electrical Board, a completely separate process from the Town's building permit.
- Center's small population means it is not subject to Colorado's HB24-1173 EV-charging permitting compliance deadline that applies to larger municipalities in this corpus (e.g., Castle Pines, Castle Rock, Centennial).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Center building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Center
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →