EV Charger / EVSE Permit in Center, Colorado
Center has no separate EV-charger permit. Installing charging equipment — for example a dedicated 240V Level 2 circuit — is electrical work, and all electrical work in Center is permitted and inspected by the State of Colorado Division of Professions and Occupations (DORA/DPO) Electrical Board. The Town runs no local certified electrical inspection program, and its own Building Permit Application/Fee Schedule directs applicants to the state program for any electrical scope, including an EV charger circuit. Under the state electrical fee schedule (set by CRS 12-23-117(3), effective statewide April 1, 2016), an EV charger circuit outside living area is priced under Chart B, Commercial and Other Installations, on the total contract cost of labor and materials: $100 base for a contract cost up to $2,000, plus $10 for each additional $1,000, rounded up. Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective August 7, 2024) sets a December 31, 2025 deadline for standardized EV-charging land-use permitting, but only for municipalities of 10,000 or more. Center's population was 1,929 at the 2020 Census, so the Town is not required to adopt a separate EV-charging land-use process.
Verified 2026-07-20 · Source
When you need this permit
- EV charger circuit installation is electrical work; apply directly with the Colorado DORA/DPO Electrical Board (1-855-454-0700 or dpo.colorado.gov/Electrical), not the Town of Center
- Electrical contractors are explicitly excluded from the Town's local Contractor's Registration requirement under Ordinance 339 Section One's definition of 'Contractor'
- Electricians must hold the applicable Colorado state electrical license
- Center's population is far below the 10,000-resident threshold that would trigger HB24-1173's mandatory local EV-charging permitting-process compliance deadline for municipalities
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Colorado DORA/DPO Electrical Board statewide fee schedule (CRS 12-23-117(3), effective statewide April 1, 2016) — governs Center directly, since all electrical permitting and inspection in the Town… Show full citationHide
Colorado DORA/DPO Electrical Board statewide fee schedule (CRS 12-23-117(3), effective statewide April 1, 2016) — governs Center directly, since all electrical permitting and inspection in the Town is administered by the State rather than a local program. An EV charger circuit is a non-living-area installation billed on Chart B (total contract cost of labor plus materials), not the living-area-based Chart A. The $100-per-$2,000 line used here is the statewide figure, not a Center-specific one.Review timeline
Inspection process
- 1
State Electrical Inspection
Performed under the Colorado DORA/DPO Electrical Board's own inspection program for the EV charger circuit, not by Town of Center staff
See the full Center inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply for an EV charger circuit on the Town of Center's own Building Permit Application -- electrical work in Center is issued and inspected entirely by the State of Colorado DORA/DPO Electrical Board, a completely separate process from the Town's building permit.
- Center's population is small enough that it is not subject to Colorado's HB24-1173 EV-charging permitting compliance deadline, which applies to larger municipalities such as Castle Pines, Castle Rock and Centennial. Expect the Town's standard electrical permit process rather than a dedicated EV-charger track.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Center building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Center's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Center yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Center lands. Privacy.
Other permits in Center
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Center project checklist
Describe your project once and get every permit, document, and fee it triggers in Center — in one checklist. Free, for any city and any number of projects.
Get started →