How to schedule
Inspections are requested through the building department below.
- Address
- 504 San Juan Avenue, P.O. Box 417, Saguache, CO 81149
- Phone
- 719-655-2232
- Office hours
- Monday through Friday, 8:00 a.m. to 4:30 p.m., per the Town Hall page as preserved by the Wayback Machine (townofsaguache.org/town-hall-546.htm, captured 2025-12-10). NOTE: as of this review's live-site check (2026-07-06), the Town's website has been migrated/rebuilt on Netlify and no longer publishes this page or most of its prior content (see sources note below); hours/contact are carried forward from the last-known-good archived capture, cross-verified independently against ColoradoEnergy.org's own listed Town Clerk contact (matches exactly: 504 San Juan Ave, Saguache, CO 81149, 719-655-2232).
- Website
- Official site
Published scheduling rules
- The core electrical-connection work is handled entirely by the State of Colorado (DORA State Electrical Board), not the Town — apply and schedule inspections directly with the State. (EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit))
- Electrical work is handled entirely by the State of Colorado (DORA State Electrical Board), not the Town — apply and schedule inspections directly with the State. (Solar PV Permit (Town Building Permit, Statewide Fee Cap))
Inspection sequence
Applies to: EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit)
- 1
Town Hall Review (Clerk / Deputy Clerk)
Same generalist review process as the Town's general Building Permit — no dedicated Building Official or technical plan-review process is documented for the Town
- 2
State of Colorado Electrical Inspection(s)
Scheduled directly with the Colorado State Electrical Board (DORA), not through the Town — this is the substantive inspection for the EV charger's electrical connection
Applies to: Historic Preservation Alteration Certificate (Historic District / Landmark, IN ADDITION to Building Permit)
- 1
Historic Preservation Commission Review
7-member Commission (at least 3 with professional background in history/architecture/planning/archeology/related fields, at least 3 Town residents, 1 Town Trustee) reviews the application against the Secretary of the Interior's Standards and Town-specific compatibility criteria (design, finish, material, scale, mass, height)
- 2
Town Board of Trustees Final Action
Per Ord. 2025-1, the Commission now recommends (rather than directly issues, as under the superseded 2010-4 version) and the Town Board takes final action on landmark/district alteration certificate applications
Applies to: Solar PV Permit (Town Building Permit, Statewide Fee Cap)
- 1
Town Hall Review (Clerk / Deputy Clerk)
Same generalist review process as the Town's general Building Permit — no dedicated Building Official or technical plan-review process is documented for the Town
- 2
State of Colorado Electrical Inspection(s)
Scheduled directly with the Colorado State Electrical Board (DORA), not through the Town
Final inspection only: Building Permit
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Saguache building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Saguache building permits
Get alerts for Saguache
We'll email you when Saguache's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.