EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) — Saguache, Colorado · Requirements sheet
Verified 2026-07-23 · Source: https://www.townofsaguache.org/uploads/building_permit_package.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) in Saguache, Colorado
The Town of Saguache has no dedicated EV charger/EVSE permit type, no adopted model building or electrical code, and no dedicated Building Department — a residential or commercial EV charging station installation within Town limits is still subject to the Town's general Building Permit requirement (per the Town's own 'Licenses and Permits' page and the downloadable 'Application for Building Site Permit'), administered by the Town Clerk/Deputy Clerk, with the electrical-connection scope handled entirely by the State of Colorado (DORA State Electrical Board), not the Town. Colorado's HB24-1173 (EV Charging System Permits, effective for permitting requirements by 12/31/2025) applies only to counties with population 20,000+ and municipalities with population 10,000+ — Saguache (population 539) is well under both thresholds and is not subject to that law's streamlined-permitting/model-code/3-business-day-decision requirements.
Verified 2026-07-23 · Source
When you need this permit
- Contact the Town Clerk or Deputy Clerk at Saguache Town Hall (504 San Juan Avenue, P.O. Box 417, Saguache, CO 81149; 719-655-2232) — the Town's Application for Building Site Permit form has no dedicated 'EV Charger' or 'EVSE' checkbox among its project-type options (New Construction, Addition, Bridges/Walkways/Driveways, Roof Replacement, Fence or Deck, Demolition, Mobile Home, Single/Multi Unit Residence, Lot Level Change, Commercial); confirm with the Town Clerk which category applies to an EV charger installation
- No adopted model building or electrical code (IBC/IRC/NEC) governs technical plan review, per ColoradoEnergy.org's independently-verified 'No Building Codes' finding for the Town and this file's direct reading of Municipal Code Chapter 18 (which contains no code adoption)
- Electrical-connection work (the core scope of an EV charger install) is NOT administered by the Town — apply directly to the Colorado State Electrical Board (DORA, Division of Professions and Occupations), consistent with the general Colorado pattern of small statutory towns without their own trade-permitting programs
- Colorado HB24-1173 (EV Charging System Permits) requires counties with population 20,000+ and municipalities with population 10,000+ to adopt a streamlined EV-charger permitting process (state model code, local objective standards with a 3-business-day decision window, or a formally-adopted ordinance continuing existing process) by December 31, 2025 — Saguache's population (539) is far below the 10,000-person municipal threshold, so the Town has no obligation under this law and none was found to have been voluntarily adopted
- No SolarAPP+ (gosolarapp.org) participation was found for the Town of Saguache — SolarAPP+ covers solar/storage permitting, not EV chargers specifically, and no evidence of any Saguache-specific automated permitting platform exists
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Town Hall Review (Clerk / Deputy Clerk)
Same generalist review process as the Town's general Building Permit — no dedicated Building Official or technical plan-review process is documented for the Town
- 2
State of Colorado Electrical Inspection(s)
Scheduled directly with the Colorado State Electrical Board (DORA), not through the Town — this is the substantive inspection for the EV charger's electrical connection
Tips
- There is no dedicated EV charger permit or checkbox in Saguache — use the Town's general 'Application for Building Site Permit' and confirm with the Town Clerk (719-655-2232) which project-type box to check.
- The core electrical-connection work is handled entirely by the State of Colorado (DORA State Electrical Board), not the Town — apply and schedule inspections directly with the State.
- Because Saguache's population (539) is far below HB24-1173's 10,000-person threshold for municipalities, don't expect a streamlined/model-code EV-charger permitting process or a guaranteed 3-business-day decision the way a larger Colorado city might offer.
- No fee amount is published for the Town's portion of this permit anywhere on its site or archives — budget for an unknown/likely modest Town fee plus the separate State electrical permit fee, and confirm current amounts directly with the Town Clerk and DORA before installing.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Saguache building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Saguache
EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) in other cities
Look up this fee in a different city →