Codes adopted

2024 International Building Code (IBC) — adopted by Ordinance 1620 (Series of 2025), effective September 12, 2025, per the Town Council second-reading staff memorandum (September 9, 2025) and the live Building Codes webpage2024 International Residential Code (IRC)2024 International Existing Building Code (IEBC)2024 International Mechanical Code (IMC)2024 International Fuel Gas Code (IFGC)2024 International Plumbing Code (IPC)2024 International Fire Code (IFC) — enforced jointly with the Telluride Fire Protection District per Resolution No. 2019-032024 International Energy Conservation Code (IECC)2024 International Property Maintenance Code (IPMC)2024 International Swimming Pool and Spa Code (ISPSC)2024 International Code Council Performance Code for Buildings and Facilities2023 National Electrical Code (NEC)2023 Colorado Model Electric Ready and Solar Ready CodePrior code cycle (superseded, listed for reference only): 2018-edition IBC/IRC/IEBC/IMC/IFGC/IPC/IPMC adopted by Ordinance 1502, effective February 18, 2020All codes locally amended via Telluride Municipal Code Chapter 15 (Building Regulations), Articles 1-13; amendment structure verified directly against both the archived 2018-cycle amendment ordinance (Ordinance 1502 full text) and the current 2024-cycle Town Council staff memorandum/ordinance text (Ordinance 1620) for this file — the two were cross-checked against each other since the live telluride.municipal.codes site blocked automated fetches during this research session (see tipsAndGotchas for the chase trail).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new construction of single-family, duplex, and townhouse structures in the Town of Telluride. Reviewed under the 2024 IRC/IBC as locally amended, including the Town's Climatic and Geographic Design Criteria (100 mph Vult wind speed/Exposure B, Seismic Design Category B, 48-inch frost depth, ground/roof snow load per the ASCE Hazard tool, mandatory ice barrier underlayment). Because the entire town lies within a National Historic Landmark District, HARC Certificate of Appropriateness approval is required before permit issuance for any exterior work.

Verified 2026-07-13 · Source

Requirements

  • Plans must comply with the 2024 IRC/IBC as adopted (Ordinance 1620, effective 9/12/2025) and the Town's Climatic and Geographic Design Criteria: 100 mph Vult wind speed/Exposure B, Seismic Design Category B, 48-inch minimum frost depth, ice barrier underlayment required, ground/roof snow load determined per the ASCE Hazard tool (or the Structural Engineer Association of Colorado's 'Snow Load Design Data for Colorado', whichever is most restrictive)
  • Roof design must comply with snow-shed mitigation requirements (IBC 903.5/IRC R318.2.1) so ice/snow does not shed onto occupied areas, egress doors, walkways, or utility meters
  • HARC Certificate of Appropriateness required before building permit issuance for any exterior design elements, since Telluride's core is a National Historic Landmark District
  • Construction Mitigation Plan (CMP) required and must be approved by the Building Department (referred to Planning and Public Works) prior to permit issuance for any project disturbing 500+ sq ft of property or involving demolition/renovation of 500+ sq ft within a 12-month period
  • All contractors must hold a current Town of Telluride business license (Municipal Code Chapter 6)
  • Applications submitted via the Town's SmartGov online portal (paper applications no longer accepted)
  • Permit becomes invalid if work is not commenced within 180 days of issuance, or suspended/abandoned for 180 days after commencement

Required documents

  • RequiredBuilding Permit Application (SmartGov)Submitted through the Town of Telluride SmartGov online portal (twn-telluride-co.smartgovcommunity.com)
  • RequiredHARC Certificate of AppropriatenessRequired before building permit issuance for any project with exterior elements
  • RequiredConstruction Mitigation PlanRequired for projects disturbing 500+ sq ft or involving 500+ sq ft of demolition/renovation within 12 months
  • RequiredCertificate of High Altitude FormTown of Telluride form (DocumentCenter/View/141)

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$51.50Table 1-A, Building Permit Fee Schedule effective 1/1/2023
Building Permit Fee — valuation $501.00 to $2,000.00$51.50 for the first $500 plus $3.35 for each additional $100 or fraction thereof, to and including $2,000.00
Building Permit Fee — valuation $2,001.00 to $25,000.00$101.75 for the first $2,000 plus $16.25 for each additional $1,000 or fraction thereof, to and including $25,000.00
Building Permit Fee — valuation $25,001.00 to $50,000.00$475.50 for the first $25,000 plus $11.75 for each additional $1,000 or fraction thereof, to and including $50,000.00
Building Permit Fee — valuation $50,001.00 to $100,000.00$769.25 for the first $50,000 plus $8.10 for each additional $1,000 or fraction thereof, to and including $100,000.00
Building Permit Fee — valuation $100,001.00 to $500,000.00$1,174.25 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000.00
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,774.25 for the first $500,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $1,000,000.00
Building Permit Fee — valuation $1,000,001.00 and up$6,574.25 for the first $1,000,000 plus $4.20 for each additional $1,000 or fraction thereof
Plan Check Fee65% of Building Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%
Green Building Fee (TEMP)20% of the Building Permit FeeCan alternately be mitigated on-site or off-site with an eligible renewable energy system, per Ordinance 1372
Building License FeeConstruction cost x 0.007Exempt for single-family, duplex, and triplex units in the residential zone, and deed-restricted long-term housing units in any zone (Municipal Code Ch. 6, Sec. 6-1-20(5))

Residential Addition / Interior Remodel Permit

Verified

Required for additions and interior/exterior remodels to existing single-family, duplex, and townhouse structures in Telluride. Reviewed under the 2024 IRC as locally amended. HARC Certificate of Appropriateness is required before permit issuance for any exterior changes, since the entire town is within a National Historic Landmark District.

Verified 2026-07-13 · Source

Requirements

  • Reviewed under the 2024 IRC as amended by Ordinance 1620
  • HARC Certificate of Appropriateness required before permit issuance for any exterior alteration
  • Construction Mitigation Plan required if the project disturbs 500+ sq ft of property, or involves 500+ sq ft of renovation (interior and/or exterior) within a 12-month period, cumulative across projects on the same property
  • Automatic sprinkler systems are NOT required for additions/alterations of less than 750 sq ft of area of work to an existing townhouse, one-, or two-family dwelling that does not already have a sprinkler system (IRC R309.1/R309.2 local amendment)
  • All contractors must hold a current Town of Telluride business license
  • Permit becomes invalid if work is not commenced within 180 days of issuance, or suspended/abandoned for 180 days after commencement

Required documents

  • RequiredBuilding Permit Application (SmartGov)Submitted via the Town of Telluride SmartGov online portal
  • RequiredHARC Certificate of AppropriatenessRequired prior to permit issuance for any exterior changes
  • OptionalConstruction Mitigation PlanRequired if project scope meets the 500 sq ft disturbance/renovation threshold

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based Table 1-A as new construction)$51.50 minimum, scaling per the valuation tiers in the Building Permit Fee ScheduleEffective 1/1/2023 fee schedule
Plan Check Fee65% of Building Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%
Green Building Fee (TEMP)20% of the Building Permit Fee

Electrical Permit

Verified

Required for installation, alteration, or repair of electrical systems in Telluride. Governed by the 2023 NEC as adopted (Ordinance 1620) plus the 2023 Colorado Model Electric Ready and Solar Ready Code. Administered through the same SmartGov portal as building permits; fee calculated under the same Table 1-A valuation schedule used for building/mechanical/plumbing permits.

Verified 2026-07-13 · Source

Requirements

  • Governed by the 2023 NEC as adopted by the Town of Telluride, plus the 2023 Colorado Model Electric Ready and Solar Ready Code
  • Administered via SmartGov (twn-telluride-co.smartgovcommunity.com), the same portal used for building, plumbing, and mechanical permits
  • Fee calculated per Table 1-A based on electrical-specific valuation (not a separate state-anchored schedule as used in some other Colorado home-rule towns)
  • All contractors must hold a current Town of Telluride business license, plus any required Colorado state electrical licensure

Required documents

  • RequiredElectrical Permit Application (SmartGov)Submitted via the Town of Telluride SmartGov online portal

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeCalculated per Table 1-A of the Building Permit Fee Schedule, based on electrical valuationSame valuation-tier table used for Building/Mechanical/Plumbing; see Building Permit fee tiers
Plan Check Fee65% of the Electrical Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%
Reinspection Fee$65.00 per hour (or actual jurisdiction cost, whichever is greater)

Plumbing Permit

Verified

Required for installation, alteration, or repair of plumbing systems in Telluride. Governed by the 2024 International Plumbing Code (IPC) as adopted. Administered through the same SmartGov portal used for building/electrical/mechanical permits; fee calculated per the same Table 1-A valuation schedule.

Verified 2026-07-13 · Source

Requirements

  • Governed by the 2024 IPC as adopted by the Town of Telluride (Ordinance 1620)
  • Administered via SmartGov, the same portal used for building, electrical, and mechanical permits
  • Fee calculated per Table 1-A based on plumbing-specific valuation
  • All contractors must hold a current Town of Telluride business license plus any required Colorado state plumbing licensure
  • Fixture Unit Table (Town-published PDF) available as a reference for plumbing fixture sizing calculations

Required documents

  • RequiredPlumbing Permit Application (SmartGov)Submitted via the Town of Telluride SmartGov online portal
  • OptionalFixture Unit TableTown of Telluride reference document for plumbing fixture sizing (DocumentCenter/View/102)

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeCalculated per Table 1-A of the Building Permit Fee Schedule, based on plumbing valuation
Plan Check Fee65% of the Plumbing Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%
Water/Sewer Tap FeePer the Town's separate Water/Sewer Tap Fee schedule (updated annually; a 2026 edition is published)Applies to new taps/connections, not every plumbing permit

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and gas appliance installation or replacement in Telluride. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) as adopted. Administered through the same SmartGov portal and Table 1-A fee schedule used for building/electrical/plumbing permits.

Verified 2026-07-13 · Source

Requirements

  • Governed by the 2024 IMC and 2024 IFGC as adopted by the Town of Telluride (Ordinance 1620)
  • Administered via SmartGov, the same portal used for building, electrical, and plumbing permits
  • Fee calculated per Table 1-A based on mechanical-specific valuation
  • All contractors must hold a current Town of Telluride business license

Required documents

  • RequiredMechanical Permit Application (SmartGov)Submitted via the Town of Telluride SmartGov online portal

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeCalculated per Table 1-A of the Building Permit Fee Schedule, based on mechanical valuation
Plan Check Fee65% of the Mechanical Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%

Residential/Commercial Solar Photovoltaic (PV) Permit

Verified

Required for installation of a rooftop or ground-mounted solar photovoltaic system in the Town of Telluride. No solar-specific fee line, checklist, or turnaround SLA is published on the Town's Building Department, Building Codes, or Fee Schedule pages as of 2026-07-20 — a PV system is billed under the same Table 1-A valuation-based fee schedule already documented in this file's Electrical Permit entry. Colorado's statewide C.R.S. § 24-48.5-113 independently caps whatever fee is actually assessed for a solar energy device installation at $500 for a residential permit or $1,000 for a nonresidential permit (systems under 2 megawatts), overriding Telluride's Table 1-A calculation for solar specifically. Because Telluride's entire town core sits within a National Historic Landmark District, a visible roof-mounted array is expected to require HARC Certificate of Appropriateness approval before the building permit is issued, the same as any other exterior work documented elsewhere in this file.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the interconnection/wiring scope, governed by the 2023 NEC (Article 690, Solar Photovoltaic Systems) as adopted by Ordinance 1620, administered via the Town's SmartGov portal — the same mechanism documented in this file's Electrical Permit entry
  • Building permit required for the racking/mounting structural scope, governed by the 2024 IBC/IRC and the Town's Climatic and Geographic Design Criteria (100 mph Vult wind speed, 48-inch frost depth, ground/roof snow load per the ASCE Hazard tool), per this file's Residential Building Permit entry
  • HARC Certificate of Appropriateness required before permit issuance for any exterior/visible installation, since Telluride's core lies within a National Historic Landmark District — the same requirement documented in this file's Roofing Permit entry for other visible exterior roof work
  • Per C.R.S. § 24-48.5-113(3)(a), for a residential application or a nonresidential application producing less than 2 megawatts, 'the fees charged shall not exceed the lesser of the actual costs in issuing the permit or reviewing the application or five hundred dollars for a residential application or one thousand dollars for a nonresidential application' — this caps the combined Building-plus-Electrical fee total
  • All contractors must hold a current Town of Telluride business license (Municipal Code Chapter 6), plus any required Colorado state electrical licensure

Required documents

  • RequiredBuilding Permit Application (SmartGov) — Solar scopeSubmitted through the Town of Telluride SmartGov online portal for the racking/mounting structural scope
  • RequiredElectrical Permit Application (SmartGov) — Solar interconnectionSubmitted via SmartGov for the array wiring/interconnection scope, governed by 2023 NEC Article 690
  • RequiredHARC Certificate of AppropriatenessRequired before permit issuance for any visible exterior installation, since Telluride's core is a National Historic Landmark District

Fee schedule

Fee typeAmountNotes
Combined Solar PV Permit Fee Cap (residential)$500.00 maximum (aggregate of Building and Electrical permit fees combined), or the actual cost of issuing/reviewing the permit if lowerC.R.S. § 24-48.5-113(3)(a) — overrides Telluride's own Table 1-A valuation-based fee schedule (the same table documented in this file's Building and Electrical Permit entries) for solar specifically.
Combined Solar PV Permit Fee Cap (nonresidential/commercial, under 2 MW)$1,000.00 maximum (aggregate), or the actual cost of issuing/reviewing the permit if lowerC.R.S. § 24-48.5-113(3)(a).
Green Building Fee (TEMP) mitigation option20% of the Building Permit Fee, normally — BUT can be mitigated on-site or off-site with an eligible renewable energy system per Ordinance 1372Town of Telluride Building Permit Fee Schedule — the Telluride Energy Mitigation Program surcharge that applies to other new construction can itself be offset by installing the solar system covered by this permit, per the mitigation option already documented in this file's Residential Building Permit entry.

Roofing Permit (Re-Roof)

Verified

Required for re-roofing work in the Town of Telluride, reviewed as a Building Permit under the same Table 1-A valuation-based fee schedule (no separate flat re-roof fee is published). Governed by the 2024 IBC/IRC as adopted, with mandatory snow-shed mitigation design (IBC 903.5/IRC R318.2.1) and the Town's Climatic and Geographic Design Criteria (ice barrier underlayment required, ground/roof snow load per the ASCE Hazard tool). HARC review is required for any visible roofing change since the town is a National Historic Landmark District.

Verified 2026-07-13 · Source

Requirements

  • Reviewed under the 2024 IBC/IRC as adopted; billed under the same Building Permit Table 1-A valuation schedule (no standalone flat roofing fee published)
  • Roof design must include snow-shed mitigation per IBC 903.5/IRC R318.2.1 so ice/snow does not shed onto occupied areas, egress doors, walkways, decks, or utility meters
  • Ice barrier underlayment is required per the Town's Table R301.2 design criteria
  • Roof snow loads determined per the ASCE Hazard tool or the Structural Engineer Association of Colorado's 'Snow Load Design Data for Colorado', whichever is most restrictive (IBC Section 1608.1 local amendment)
  • HARC Certificate of Appropriateness required before permit issuance for any visible/exterior roofing material or design change, since roofing is exterior work within a National Historic Landmark District
  • All contractors must hold a current Town of Telluride business license

Required documents

  • RequiredBuilding Permit Application (SmartGov) — Re-Roof scopeSubmitted via the Town of Telluride SmartGov online portal; HARC approval attached
  • RequiredHARC Certificate of AppropriatenessRequired for any visible roofing material or design change

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, Table 1-A, same schedule as new construction)$51.50 minimum, scaling per the valuation tiers in the Building Permit Fee ScheduleNo separate flat re-roof fee is published; billed under the general Table 1-A Building Permit Fee schedule based on roofing project valuation
Plan Check Fee65% of the Building Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%

Electric Vehicle (EV) Charging Station Permit

Verified

Telluride does not publish a distinct fee line item, application form, or process for electric vehicle (EV) charging station / EVSE installations. The Town's Building Permit Fee Schedule and the Building Division's published permit list do not list 'EV charger,' 'EVSE,' or 'electric vehicle charging station' as a separate permit category. An EV charger installation (new circuit/branch circuit for a Level 2 charger, panel work, etc.) is billed as an Electrical Permit under the same Table 1-A valuation-based fee schedule used for all electrical work, per the same mechanism documented in this dataset's electrical-permit entry — this is a real, currently-published fee-schedule mechanism and is the governing charge for an EV charger circuit. Telluride's 2020 Census population (2,607) is well under the 10,000-resident municipal threshold in Colorado HB24-1173 (effective 8/7/2024), so the Town is not a 'covered municipal permitting agency' required to adopt the state's model EV-charger permit code, custom standards, or the statute's 3-business-day decision-notification timeline. Telluride is not a participating SolarAPP+ jurisdiction (gosolarapp.org lists no Colorado mountain towns of Telluride's size as of this review), and SolarAPP+ in any case does not cover EV charger installations.

Verified 2026-07-20 · Source

Requirements

  • Treated as an Electrical Permit — governed by the 2023 NEC as adopted (Ordinance 1620) plus the 2023 Colorado Model Electric Ready and Solar Ready Code
  • Administered via SmartGov (twn-telluride-co.smartgovcommunity.com), the same portal used for building, electrical, plumbing, and mechanical permits
  • Fee calculated per Table 1-A based on electrical-specific valuation — no distinct EV-charger fee tier is published
  • Contractor must hold a current Town of Telluride business license, plus any required Colorado state electrical licensure
  • Telluride's 2020 Census population (2,607) is far below the 10,000-resident HB24-1173 municipal threshold, so the Town is not required to adopt the state's model EV-charger permitting code or the statute's 3-business-day decision-notification timeline

Required documents

  • RequiredElectrical Permit Application (SmartGov)Submitted via the Town of Telluride SmartGov online portal; no separate EV-charger-specific application exists

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (no distinct EV-charger line item)Calculated per Table 1-A of the Building Permit Fee Schedule, based on electrical valuationTelluride's published Building Permit Fee Schedule (telluride.gov/DocumentCenter/View/13559/2024-Building-Permit-Fees-PDF) and Building Codes page do not list a separate EV charger / EVSE fee category; an EV charger install is billed as a standard Electrical Permit under Table 1-A.
Plan Check Fee65% of the Electrical Permit Fee
Town Use TaxConstruction cost x 40% x 4.5%
County Use TaxConstruction cost x 40% x 1%

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Telluride building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/san-miguel-county/telluride/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 19375a3

Reproducible from PermitBase’s version-controlled dataset, commit 19375a3.