Version history — Telluride, Colorado
This is PermitBase’s own verified record for Telluride, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Telluride’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-21Superseded
- 2026-08-14Superseded
- Telluride, Colorado — Sign Permit record added
- Telluride, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
- Telluride, Colorado — Change of Use record added
- 2026-08-02Superseded
- Telluride, Colorado — Commercial Building Permit (New Construction / Addition) record added
- Telluride, Colorado — Tenant Improvement Permit (Commercial Alteration / Repair) record added
- Telluride, Colorado — Commercial Building Permit (New Construction / Addition) fee record updated: Not independently verified as a flat dollar figure or $/sq ft rate in this session → Not independently verified as a CURRENT flat dollar figure or $/sq ft rate
- 2026-07-20Superseded
- Telluride, Colorado — Electric Vehicle (EV) Charging Station Permit record added
- Telluride, Colorado — Residential/Commercial Solar Photovoltaic (PV) Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Telluride began