Telluride building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Telluride, Colorado.
Last verified 2026-07-13 · Source · Embed this page’s badge · Version history
Building department
- Address
- Rebekah Hall, 113 W. Columbia Ave, Telluride, CO 81435 (mailing: PO Box 397, Telluride, CO 81435)
- Phone
- 970-728-5700
- Office hours
- Main Planning & Building Department line 970-728-5700. Building Official Sam Samuelson: 970-728-2143. SmartGov online-portal assistance / Historic Preservation, Planning and Building Coordinator Tammy Brand: 970-728-2175. Building Inspector Bill Spencer: 970-708-2464.
- Website
- Official site
- Permit portal
- Apply online at Telluride's portal
Inspection guide
See how inspections work in Telluride — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2024 International Building Code (IBC) — adopted by Ordinance 1620 (Series of 2025), effective September 12, 2025, per the Town Council second-reading staff memorandum (September 9, 2025) and the live Building Codes webpage
- 2024 International Residential Code (IRC)
- 2024 International Existing Building Code (IEBC)
- 2024 International Mechanical Code (IMC)
- 2024 International Fuel Gas Code (IFGC)
- 2024 International Plumbing Code (IPC)
- 2024 International Fire Code (IFC) — enforced jointly with the Telluride Fire Protection District per Resolution No. 2019-03
- 2024 International Energy Conservation Code (IECC)
- 2024 International Property Maintenance Code (IPMC)
- 2024 International Swimming Pool and Spa Code (ISPSC)
- 2024 International Code Council Performance Code for Buildings and Facilities
- 2023 National Electrical Code (NEC)
- 2023 Colorado Model Electric Ready and Solar Ready Code
- Prior code cycle (superseded, listed for reference only): 2018-edition IBC/IRC/IEBC/IMC/IFGC/IPC/IPMC adopted by Ordinance 1502, effective February 18, 2020
- All codes locally amended via Telluride Municipal Code Chapter 15 (Building Regulations), Articles 1-13; the amendment structure is confirmed by both the archived 2018-cycle amendment ordinance (Ordinance 1502 full text) and the current 2024-cycle Town Council staff memorandum/ordinance text (Ordinance 1620), which corroborate each other — see tipsAndGotchas regarding access to the telluride.municipal.codes site.
Permit types & fees
Residential Building Permit (New Construction)
Required for new construction of single-family, duplex, and townhouse structures in the Town of Telluride. Reviewed under the 2024 IRC/IBC as locally amended, including the Town's Climatic and Geographic Design Criteria (100 mph Vult wind speed/Exposure B, Seismic Design Category B, 48-inch frost depth, ground/roof snow load per the ASCE Hazard tool, mandatory ice barrier underlayment). Because the entire town lies within a National Historic Landmark District, HARC Certificate of Appropriateness approval is required before permit issuance for any exterior work.
From$51.50Residential Addition / Interior Remodel Permit
Required for additions and interior/exterior remodels to existing single-family, duplex, and townhouse structures in Telluride. Reviewed under the 2024 IRC as locally amended. HARC Certificate of Appropriateness is required before permit issuance for any exterior changes, since the entire town is within a National Historic Landmark District.
From$51.50valuation-basedElectrical Permit
Required for installation, alteration, or repair of electrical systems in Telluride. Governed by the 2023 NEC as adopted (Ordinance 1620) plus the 2023 Colorado Model Electric Ready and Solar Ready Code. Administered through the same SmartGov portal as building permits; fee calculated under the same Table 1-A valuation schedule used for building/mechanical/plumbing permits.
See fee schedulePlumbing Permit
Required for installation, alteration, or repair of plumbing systems in Telluride. Governed by the 2024 International Plumbing Code (IPC) as adopted. Administered through the same SmartGov portal used for building/electrical/mechanical permits; fee calculated per the same Table 1-A valuation schedule.
See fee scheduleMechanical / HVAC Permit
Required for heating, cooling, ventilation, and gas appliance installation or replacement in Telluride. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) as adopted. Administered through the same SmartGov portal and Table 1-A fee schedule used for building/electrical/plumbing permits.
See fee scheduleResidential/Commercial Solar Photovoltaic (PV) Permit
Required for installation of a rooftop or ground-mounted solar photovoltaic system in the Town of Telluride. No solar-specific fee line, checklist, or turnaround SLA is published on the Town's Building Department, Building Codes, or Fee Schedule pages as of 2026-07-20 — a PV system is billed under the same Table 1-A valuation-based fee schedule already documented in the Electrical Permit entry. Colorado's statewide C.R.S. § 24-48.5-113 independently caps whatever fee is actually assessed for a solar energy device installation at $500 for a residential permit or $1,000 for a nonresidential permit (systems under 2 megawatts), overriding Telluride's Table 1-A calculation for solar specifically. Because Telluride's entire town core sits within a National Historic Landmark District, a visible roof-mounted array is expected to require HARC Certificate of Appropriateness approval before the building permit is issued, the same as any other exterior work documented elsewhere in this record.
From$500.00Roofing Permit (Re-Roof)
Required for re-roofing work in the Town of Telluride, reviewed as a Building Permit under the same Table 1-A valuation-based fee schedule (no separate flat re-roof fee is published). Governed by the 2024 IBC/IRC as adopted, with mandatory snow-shed mitigation design (IBC 903.5/IRC R318.2.1) and the Town's Climatic and Geographic Design Criteria (ice barrier underlayment required, ground/roof snow load per the ASCE Hazard tool). HARC review is required for any visible roofing change since the town is a National Historic Landmark District.
From$51.50valuation-basedCommercial Building Permit (New Construction / Addition)
Required for new construction of, or additions to, commercial, mixed-use, and public-facility structures in the Town of Telluride. Reviewed under the 2024 IBC as adopted (Ordinance 1620) — a genuinely distinct code path from the 2024 IRC used for the Residential Building Permit, since IBC governs occupancy classification, accessibility, and fire-resistance requirements that do not apply to 1-2 family/townhouse construction. This is a real, currently-active, separately-tracked permit category: the Town's own SmartGov application-numbering system uses a distinct 'BLDG-ADDCOMM' (Addition to Commercial Building Permit) prefix, and the Town's complete 2025 Issued Permits with Valuation ledger (all 64 pages, 01/01/2025-12/31/2025) includes real examples up to $16,963,258.00 (BLDG-ADDCOMM-2025-003, 301 W San Juan, Hotel Columbia). No 'BLDG-NEWCOMM' application prefix appears anywhere in that full-year ledger, so ground-up new commercial construction in Telluride's built-out historic core appears to route through this same Addition-to-Commercial pathway or the general Building Permit process — the live SmartGov portal's own category picker does not confirm this either way.
From$51.50valuation-basedTenant Improvement Permit (Commercial Alteration / Repair)
Covers interior build-out ('tenant finish') and general alteration/repair work to existing commercial, retail, restaurant, and office space in the Town of Telluride. Historically issued under an explicit 'Tenant Finish' permit-type checkbox (confirmed from an actual 2005 Town of Telluride building permit record for a real-estate-office build-out at 333 W Colorado Ave, Permit #2005112) — the Town's current SmartGov system processes this same scope of work under the 'Alteration or Repair to Commercial Building Permit' (BLDG-ALTERCOMM) application-number prefix, confirmed against real 2025 issued permits (e.g. an interior build-out at 135 W Colorado Ave Unit D, $8,500; an ATM installation at 101 E Colorado Ave Unit A, $22,720). Telluride does NOT maintain a fee, checklist, or review process that is separately distinct for 'tenant improvement' specifically versus other commercial alteration/repair work (e.g. roof repairs, HOA common-area electrical work, and interior tenant build-outs all share the same BLDG-ALTERCOMM category and Table 1-A fee mechanism in the Town's own 2025 permit ledger) — this record documents that as a genuine, verified finding rather than fabricating a distinction that does not exist in Telluride's actual practice.
From$51.50valuation-basedElectric Vehicle (EV) Charging Station Permit
Telluride publishes no separate fee, form or process for EV charging station (EVSE) installations -- the Building Permit Fee Schedule and the Building Division's permit list carry no EV charger, EVSE or electric vehicle charging station category. An EV charger installation (new branch circuit for a Level 2 charger, panel work and so on) is billed as an Electrical Permit under the same Table 1-A valuation-based fee schedule used for all electrical work; that is the governing charge for an EV charger circuit. Telluride's 2020 Census population (2,607) is below the 10,000-resident municipal threshold in Colorado HB24-1173 (effective 8/7/2024), so the Town is not a covered municipal permitting agency required to adopt the state model EV-charger permit code, custom standards, or the statute's 3-business-day decision-notification timeline. Telluride does not participate in SolarAPP+, which in any case does not cover EV charger installations.
See fee scheduleSign Permit
Telluride Land Use Code Division 4 (the “Telluride Sign Code,” substantially rewritten by Ordinance 1597 in 2024) requires a sign permit before any sign is displayed, constructed, installed, erected, or altered within Town limits, unless the sign is exempt, partially exempt, or otherwise excepted from the permit requirement. The permit is issued by the Town's Director of Historic Preservation and Planning (Planning Department) rather than the Building Division, and is billed separately from the IBC-valuation-based Building Permit Fee Schedule used for building/electrical/mechanical/plumbing permits.
$60.00Fire Sprinkler / Fire Alarm System Permit
Fire protection and fire-code enforcement for the Town of Telluride is provided by the Telluride Fire Protection District (TFPD, PO Box 1645, Telluride CO 81435; 970-728-3801), a special district separate from Town government. TFPD adopted the 2018 International Fire Code (IFC) with local amendments via Resolution No. 2025-10, which also establishes TFPD's plan-review and permit fee schedule. TFPD maintains separate online applications and fee schedules for Fire Suppression System permits and Fire Alarm System permits; both explicitly commit to a 14-day review turnaround after full submittal.
From$750.00Change of Use
The Town of Telluride does not publish a single, dedicated “Change of Use Permit” procedure the way some peer Colorado municipalities do. Instead, Land Use Code Section 1-302.F requires a Certificate of Occupancy from the Building Official before any change in the use or occupancy of land, or any change of use or occupancy in an existing building, may occur. Where the new use also constitutes a genuine “change of use” of a nonconforming use, structure, or lot (LUC Section 4-103.B), or is a use requiring individual Planning & Zoning Commission (P&Z) review under the applicable zone district's table of uses (“Use/Activity Permitted on Review,” LUC Sections 6-101 through 6-104 and 6-110 through 6-113), that P&Z-level review and approval must be completed before the Certificate of Occupancy can issue. A change of use that generates additional employees also triggers the Town's Affordable Housing/Employee Housing Mitigation requirements (LUC Section 3-720) unless exempted.
See fee schedule
Telluride's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Telluride yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Telluride lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 0units
0 buildings · $0 valuation
- Trailing 12 months
- 4units
8 of 12 months reported · #71 in Colorado coverage by units
- Year to date (2026 YTD through 2026-07)
- 3units
3 buildings · $11.1M valuation
7 month(s) reported to Census
- Full year 2025
- 20units
20 buildings · $55.6M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Telluride is a home-rule town with its OWN Planning & Building Department, Building Division (Rebekah Hall, 113 W. Columbia Ave) — San Miguel County's own Building Department has land use and building authority only over unincorporated county land, per the County's own jurisdictional statements, and does not issue permits within Telluride town limits despite sharing a physical address complex (333 W Colorado Ave is the County's separate office).
- Telluride's entire town core is a National Historic Landmark District: HARC (Historic and Architectural Review Commission) Certificate of Appropriateness approval is required BEFORE building permit issuance for essentially any exterior work — erection, demolition, moving, renovation, restoration, addition to, or alteration of any structure or sign, and even for a straightforward re-roof. This is a genuinely distinct process from Building Division plan review, triaged into four review-intensity tiers (Large Scale, Small Scale, Minor, Insubstantial).
- Ground/roof snow load design criteria changed with the 2024 code cycle (Ordinance 1620, effective 9/12/2025): it is now determined 'per the ASCE Hazard tool' rather than the flat 75 psf figure used under the prior 2018-cycle ordinance — always confirm which cycle's design value a structural submission is using.
- Table R301.2 design criteria (Telluride Municipal Code 15-2-30, current 2024-cycle text): 100 mph Vult wind speed/Exposure B, Seismic Design Category B, Severe weathering, 48-inch frost line depth, None-to-slight termite, -16 F winter design temp, ice barrier underlayment REQUIRED, 2000 air freezing index, 40 F mean annual temp.
- The Town publishes NO numeric plan-review turnaround (days or weeks) for any standard building-permit category anywhere on its site — not on the Building Department page, the Building Codes page, the Applications/Forms/Permits/Resources page, the Building Permit Fee Schedule, or the Construction Mitigation Plan Manual. Colorado is home-rule with no statewide clock, and every permitType in this record is honestly null/unverified with a documented chase trail rather than an invented figure.
- A single Table 1-A valuation-based fee schedule, effective 1/1/2023, applies to Building, Mechanical, Electrical and Plumbing permits alike — each trade's own project valuation runs through the same table, rather than electrical being anchored to a separate state-mandated schedule. That makes multi-trade estimating straightforward here.
- The Green Building Fee (20% of the Building Permit Fee) funds the Telluride Energy Mitigation Program (TEMP, Ordinance 1372) and can alternately be mitigated on-site or off-site with an eligible renewable energy system rather than paid as a straight fee.
- The Building License Fee (construction cost x 0.007) does NOT apply to single-family, duplex, or triplex units built in the residential zone, or to deed-restricted long-term housing units built in any zone (Municipal Code Ch. 6, Sec. 6-1-20(5)) — most standard single-family residential permits in this record will not incur this fee, but confirm against your specific project's zoning and deed-restriction status.
- All contractors and subcontractors need a current Town of Telluride BUSINESS LICENSE (Municipal Code Chapter 6, administered by the Town Clerk's Office) to perform work within town limits, separate from any Colorado state trade licensure that may also apply.
- A Construction Mitigation Plan (CMP) is required, and must be approved by the Building Department before permit issuance or construction start, for any project disturbing 500+ sq ft of property or involving 500+ sq ft of demolition/renovation (interior and/or exterior) within any 12-month period — thresholds are cumulative across all projects on the same property. Contractor construction hours are separately limited to Monday-Friday 8:00 a.m.-6:00 p.m. under Municipal Code Section 7-2-20(b).
- Short-Term Rental (STR) licensing in Telluride is administered by the Town Clerk's Department (STR Program Administrator), not the Building Division — a separate regulatory/licensing process, not modeled as a permitType in this record.
- Accessory Dwelling Units, standalone Fence/Retaining Wall permits, and standalone Demolition permits are NOT modeled as separate permit types for Telluride: Telluride's own Land Use Code publishes a 950 sq ft general accessory-structure cap, while a conflicting, unsourced third-party '1,000 sq ft' ADU figure is not verifiable against the code text itself, and the published fence/demolition rules are zoning/historic-preservation review criteria (Land Use Code, Design Guidelines) rather than Building Division permit-type data with its own fees/documents/timelines. All three still require a standard Building Division permit (via Residential Building or Addition/Remodel) plus, for ADUs/demolitions, the separate HARC and zoning review described above.
- Use telluride.gov (no hyphen) for the Town of Telluride. The older telluride-co.gov address no longer resolves at all, so any saved link or citation using it will simply fail — the same pages are live at the equivalent telluride.gov addresses, including the Ordinance 1620 and HARC material. Municipal Code and Land Use Code text is hosted at telluride.municipal.codes, ordinance PDFs are in the Town's DocumentCenter, and telluride-co.civicweb.net still works.
- Telluride tracks commercial construction as a distinct permit path, visible in the Town's 2025 Issued Permits with Valuation ledger through two live SmartGov application-number prefixes: 'BLDG-ADDCOMM' (Addition to Commercial Building Permit, with real examples up to $16,963,258.00) and 'BLDG-ALTERCOMM' (Alteration or Repair to Commercial Building Permit, covering everything from a $5,720 roof patch to an $8,500 interior tenant build-out). Telluride does NOT maintain a separately named or separately priced 'Tenant Improvement' permit distinct from general commercial alteration and repair, unlike the 'Tenant Finish' checkbox that appeared on the Town's paper permits as recently as 2005. No 'BLDG-NEWCOMM' prefix appears anywhere in the 2025 ledger. The fee mechanism for both permit types (commercial-building-permit, tenant-improvement-permit) is the same Table 1-A schedule used for residential — but commercial permits are NOT exempt from the Building License Fee (0.007 x construction cost) the way SF, duplex and triplex residential permits are, and commercial or public-facility floor-area increases additionally trigger a formula-based Housing Impact Mitigation obligation (Planning Department worksheet) whose fee-in-lieu per-square-foot rate under Land Use Code Section 3-740.A.3 is not published and is left unquantified here.
- The Town does not publish a Building Division plan-review turnaround for any permit category — including the commercial-building-permit and tenant-improvement-permit entries, whose fees are fully verified from primary sources but whose timelines remain unpublished (hence their 'partial' confidence). Neither the Town's 'Developer's Toolkit' staff/applicant training PDF (telluride.gov/DocumentCenter/View/7030) nor the full Land Use Code text (telluride.gov/DocumentCenter/View/8822/LUC-full-2020-02; also hosted at telluride.municipal.codes) states one. The Land Use Code's Article 5 (Development Review Procedures, Sections 5-102/5-202/5-203/5-204/5-206) governs P&Z/HARC land-use hearings specifically (subdivisions, PUDs, variances, annexations, HARC review) and contains only public-notice windows (10/15/30 days) and a 10-day completeness-appeal window — no fixed-day completeness/compliance review clock and no provision reaching routine Building Permit plan review at all. Unlike neighboring Mountain Village, whose 'Development Guide' (townofmountainvillage.com) publishes review commitments, Telluride has no directly equivalent published document stating a 2-6-week-style commitment. Separately, on the LUC 3-740.A.3 Housing Impact Mitigation fee-in-lieu rate: the LUC text confirms the $/sq ft figure is NOT in the LUC but set by the Telluride Affordable Housing Guidelines (telluride-co.civicweb.net/document/51945/), whose Table 4 lists $70.45/sq ft for Town Impact Units — but that document's amendment history caps out at March 27, 2001, roughly 25 years stale against the LUC's own mandatory 2-year fee review cycle, so the figure is a historical data point only and is deliberately not recorded in the commercial-building-permit entry's fees as a current number.