Skip to main content
PermitBase

Mechanical / HVAC Permit in Telluride, Colorado

Required for heating, cooling, ventilation, and gas appliance installation or replacement in Telluride. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) as adopted. Administered through the same SmartGov portal and Table 1-A fee schedule used for building/electrical/plumbing permits.

Verified 2026-07-13 · Source

When you need this permit

  • Governed by the 2024 IMC and 2024 IFGC as adopted by the Town of Telluride (Ordinance 1620)
  • Administered via SmartGov, the same portal used for building, electrical, and plumbing permits
  • Fee calculated per Table 1-A based on mechanical-specific valuation
  • All contractors must hold a current Town of Telluride business license

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mechanical Permit Fee
Calculated per Table 1-A of the Building Permit Fee Schedule, based on mechanical valuation
Plan Check Fee
65% of the Mechanical Permit Fee
Town Use Tax
Construction cost x 40% x 4.5%
County Use Tax
Construction cost x 40% x 1%

Review timeline

Plan review
Not published — contact the department

How long did your Mechanical / HVAC Permit permit actually take in Telluride?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

See the full Telluride inspection guide — scheduling & re-inspection fees →

Tips

  • At Telluride's elevation and -16 F winter design temperature (per the Town's Table R301.2 design criteria), confirm your HVAC contractor is sizing equipment to Telluride's specific design temp and 2000 air-freezing-index figures, not a generic Colorado or sea-level assumption.

Frequently asked questions

Telluride requires a mechanical / hvac permit for: Governed by the 2024 IMC and 2024 IFGC as adopted by the Town of Telluride (Ordinance 1620); Administered via SmartGov, the same portal used for building, electrical, and plumbing permits; Fee calculated per Table 1-A based on mechanical-specific valuation; All contractors must hold a current Town of Telluride business license. If your project isn't listed, confirm with Town of Telluride Planning & Building Department, Building Division at 970-728-5700 before starting work.

In Telluride, the published Mechanical Permit Fee is: Calculated per Table 1-A of the Building Permit Fee Schedule, based on mechanical valuation. Additional published fees: Plan Check Fee — 65% of the Mechanical Permit Fee; Town Use Tax — Construction cost x 40% x 4.5%; County Use Tax — Construction cost x 40% x 1%. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Telluride does not publish a plan-review timeline for this permit. Contact Town of Telluride Planning & Building Department, Building Division at 970-728-5700 for current turnaround.

You'll need: Mechanical Permit Application (SmartGov). See the required-documents checklist on this page for details on each.

Telluride requires 2 inspection(s) for a mechanical / hvac permit, in order: Rough Mechanical, Final Inspection. Schedule each through Town of Telluride Planning & Building Department, Building Division (970-728-5700).

Apply through Town of Telluride Planning & Building Department, Building Division at Rebekah Hall, 113 W. Columbia Ave, Telluride, CO 81435 (mailing: PO Box 397, Telluride, CO 81435). Phone: 970-728-5700, email: planningandbuilding@telluride.gov. Office hours: Main Planning & Building Department line 970-728-5700. Building Official Sam Samuelson: 970-728-2143. SmartGov online-portal assistance / Historic Preservation, Planning and Building Coordinator Tammy Brand: 970-728-2175. Building Inspector Bill Spencer: 970-708-2464.. Official information: https://telluride.gov/230/Building-Department.

Telluride, Colorado has adopted: 2024 International Building Code (IBC) — adopted by Ordinance 1620 (Series of 2025), effective September 12, 2025, per the Town Council second-reading staff memorandum (September 9, 2025) and the live Building Codes webpage; 2024 International Residential Code (IRC); 2024 International Existing Building Code (IEBC); 2024 International Mechanical Code (IMC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Fire Code (IFC) — enforced jointly with the Telluride Fire Protection District per Resolution No. 2019-03; 2024 International Energy Conservation Code (IECC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Code Council Performance Code for Buildings and Facilities; 2023 National Electrical Code (NEC); 2023 Colorado Model Electric Ready and Solar Ready Code; Prior code cycle (superseded, listed for reference only): 2018-edition IBC/IRC/IEBC/IMC/IFGC/IPC/IPMC adopted by Ordinance 1502, effective February 18, 2020; All codes locally amended via Telluride Municipal Code Chapter 15 (Building Regulations), Articles 1-13; amendment structure verified directly against both the archived 2018-cycle amendment ordinance (Ordinance 1502 full text) and the current 2024-cycle Town Council staff memorandum/ordinance text (Ordinance 1620) for this file — the two were cross-checked against each other since the live telluride.municipal.codes site blocked automated fetches during this research session (see tipsAndGotchas for the chase trail).. Local amendments apply — see the Telluride overview page for the full list.

The Town's Table R301.2 Climatic and Geographic Design Criteria (Telluride Municipal Code 15-2-30) lists a winter design temperature of -16 F and an air freezing index of 2000 (BF-freezing days per 100-year period).

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Telluride building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.