Skip to main content
PermitBase

Electric Vehicle (EV) Charging Station Permit in Telluride, Colorado

Telluride publishes no separate fee, form or process for EV charging station (EVSE) installations -- the Building Permit Fee Schedule and the Building Division's permit list carry no EV charger, EVSE or electric vehicle charging station category. An EV charger installation (new branch circuit for a Level 2 charger, panel work and so on) is billed as an Electrical Permit under the same Table 1-A valuation-based fee schedule used for all electrical work; that is the governing charge for an EV charger circuit. Telluride's 2020 Census population (2,607) is below the 10,000-resident municipal threshold in Colorado HB24-1173 (effective 8/7/2024), so the Town is not a covered municipal permitting agency required to adopt the state model EV-charger permit code, custom standards, or the statute's 3-business-day decision-notification timeline. Telluride does not participate in SolarAPP+, which in any case does not cover EV charger installations.

Reviewed 2026-08-02 · Source

When you need this permit

  • Treated as an Electrical Permit — governed by the 2023 NEC as adopted (Ordinance 1620) plus the 2023 Colorado Model Electric Ready and Solar Ready Code
  • Administered via SmartGov (twn-telluride-co.smartgovcommunity.com), the same portal used for building, electrical, plumbing, and mechanical permits
  • Fee calculated per Table 1-A based on electrical-specific valuation — no distinct EV-charger fee tier is published
  • Contractor must hold a current Town of Telluride business license, plus any required Colorado state electrical licensure
  • Telluride's 2020 Census population (2,607) is far below the 10,000-resident HB24-1173 municipal threshold, so the Town is not required to adopt the state's model EV-charger permitting code or the statute's 3-business-day decision-notification timeline

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Electrical Permit Fee (no distinct EV-charger line item)
Telluride's published Building Permit Fee Schedule (telluride.gov/DocumentCenter/View/13559/2024-Building-Permit-Fees-PDF) and Building Codes page do not list a separate EV charger / EVSE fee category; Show full citationTelluride's published Building Permit Fee Schedule (telluride.gov/DocumentCenter/View/13559/2024-Building-Permit-Fees-PDF) and Building Codes page do not list a separate EV charger / EVSE fee category; an EV charger install is billed as a standard Electrical Permit under Table 1-A.
Calculated per Table 1-A of the Building Permit Fee Schedule, based on electrical valuation
Plan Check FeeBuilding Permit Fee Schedule effective 1/1/2023, Plan Check Fee line (stated there as 65% of the Building Permit Fee)
65% of the Electrical Permit Fee
Town Use TaxBuilding Permit Fee Schedule effective 1/1/2023, Town Use Tax line
Construction cost x 40% x 4.5%
County Use TaxBuilding Permit Fee Schedule effective 1/1/2023, County Use Tax line
Construction cost x 40% x 1%

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle (EV) Charging Station Permit permit actually take in Telluride?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical / Final Inspection

    Standard electrical rough-in and final inspection covering the new circuit, panel work, and charger connection

See the full Telluride inspection guide — scheduling & re-inspection fees →

Tips

  • There is no dedicated 'EV charger permit' in Telluride — apply for a standard Electrical Permit through SmartGov and reference the EV charging station in the project description.
  • Confirm with the Building Division whether your specific installation (e.g., new subpanel, service upgrade) also triggers a Building Permit in addition to the Electrical Permit.

Frequently asked questions

Telluride requires an electric vehicle (ev) charging station permit for: Treated as an Electrical Permit — governed by the 2023 NEC as adopted (Ordinance 1620) plus the 2023 Colorado Model Electric Ready and Solar Ready Code; Administered via SmartGov (twn-telluride-co.smartgovcommunity.com), the same portal used for building, electrical, plumbing, and mechanical permits; Fee calculated per Table 1-A based on electrical-specific valuation — no distinct EV-charger fee tier is published; Contractor must hold a current Town of Telluride business license, plus any required Colorado state electrical licensure; Telluride's 2020 Census population (2,607) is far below the 10,000-resident HB24-1173 municipal threshold, so the Town is not required to adopt the state's model EV-charger permitting code or the statute's 3-business-day decision-notification timeline. If your project isn't listed, confirm with Town of Telluride Planning & Building Department, Building Division at 970-728-5700 before starting work.

No. Telluride bills EV/EVSE charging station installations as a standard Electrical Permit under the Table 1-A valuation-based fee schedule — there is no distinct EV-charger fee category published in the Town's Building Permit Fee Schedule.

Telluride does not publish a plan-review timeline for this permit. Contact Town of Telluride Planning & Building Department, Building Division at 970-728-5700 for current turnaround.

You'll need: Electrical Permit Application (SmartGov). See the required-documents checklist on this page for details on each.

Telluride requires 1 inspection(s) for an electric vehicle (ev) charging station permit, in order: Rough Electrical / Final Inspection. Schedule each through Town of Telluride Planning & Building Department, Building Division (970-728-5700).

Apply through Town of Telluride Planning & Building Department, Building Division at Rebekah Hall, 113 W. Columbia Ave, Telluride, CO 81435 (mailing: PO Box 397, Telluride, CO 81435). Phone: 970-728-5700, email: planningandbuilding@telluride.gov. Office hours: Main Planning & Building Department line 970-728-5700. Building Official Sam Samuelson: 970-728-2143. SmartGov online-portal assistance / Historic Preservation, Planning and Building Coordinator Tammy Brand: 970-728-2175. Building Inspector Bill Spencer: 970-708-2464.. Official information: https://telluride.gov/230/Building-Department.

Telluride, Colorado has adopted: 2024 International Building Code (IBC) — adopted by Ordinance 1620 (Series of 2025), effective September 12, 2025, per the Town Council second-reading staff memorandum (September 9, 2025) and the live Building Codes webpage; 2024 International Residential Code (IRC); 2024 International Existing Building Code (IEBC); 2024 International Mechanical Code (IMC); 2024 International Fuel Gas Code (IFGC); 2024 International Plumbing Code (IPC); 2024 International Fire Code (IFC) — enforced jointly with the Telluride Fire Protection District per Resolution No. 2019-03; 2024 International Energy Conservation Code (IECC); 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Code Council Performance Code for Buildings and Facilities; 2023 National Electrical Code (NEC); 2023 Colorado Model Electric Ready and Solar Ready Code; Prior code cycle (superseded, listed for reference only): 2018-edition IBC/IRC/IEBC/IMC/IFGC/IPC/IPMC adopted by Ordinance 1502, effective February 18, 2020; All codes locally amended via Telluride Municipal Code Chapter 15 (Building Regulations), Articles 1-13; the amendment structure is confirmed by both the archived 2018-cycle amendment ordinance (Ordinance 1502 full text) and the current 2024-cycle Town Council staff memorandum/ordinance text (Ordinance 1620), which corroborate each other — see tipsAndGotchas regarding access to the telluride.municipal.codes site.. Local amendments apply — see the Telluride overview page for the full list.

No. HB24-1173 only covers municipalities with population 10,000+ (and counties with population 20,000+). Telluride's 2020 Census population is 2,607, well under that threshold, so the Town is not a 'covered municipal permitting agency' under the statute.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Telluride building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Telluride's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Telluride yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Telluride lands. Privacy.