Skip to main content
PermitBase

Superior building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Superior, Colorado.

Last verified 2026-07-05 · Source · Embed this page’s badge · Version history

Building department

Address
100 Superior Plaza Way, Suite 200, Superior, CO 80027
Phone
303-381-2028
Office hours
Town of Superior general office hours Monday-Friday, 8 a.m.-4 p.m. (per Town website footer); Planning direct line 303-499-3675 ext. 131; Building direct line 303-381-2028; Permit Fees line 720-738-7326. The Building Division is operated under contract by SAFEbuilt; permit applications, submittals, and inspection requests are handled via the Community Core online portal and the superiorinspections@safebuilt.com email address.

Inspection guide

See how inspections work in Superior — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2024 International Building Code (IBC) — adopted per Chapter 18 of the Superior Municipal Code, per the Town's Building Codes and Zoning Regulations page
  • 2024 International Residential Code (IRC), with a local amendment adopting the 2018 IRC high-wind roof-covering criteria (ASTM D7158 Class G or H, or ASTM D3161 Class F) for reroofing, per the Town's Supplemental Roof Information page (2018 IRC edition adopted June 2020 specifically for the wind-region roofing requirement, ahead of the Town's broader 2024 code cycle)
  • 2024 International Mechanical Code (IMC)
  • 2024 International Plumbing Code (IPC)
  • 2024 International Fire Code (IFC)
  • 2024 International Fuel Gas Code (IFGC)
  • 2024 International Existing Building Code (IEBC)
  • 2024 International Private Sewage Disposal Code
  • 2024 International Property Maintenance Code
  • Metro Cohort Model Code, based on the 2024 International Energy Conservation Code (IECC) — per the Town's Building Codes and Zoning Regulations page
  • 2023 National Electrical Code (NEC)
  • Superior Municipal Code Section 18-14-40 (Minimum Efficiency Requirement / Construction Waste Recycling) — requires an applicant for a new residential structure building permit to demonstrate a minimum of 50% of construction waste is recycled, with waste diversion tracking submitted to the Town at project completion; additions/remodels over 500 sq ft are encouraged (not required) to divert waste

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
8units

8 buildings · $2.2M valuation

Trailing 12 months
569units

12 of 12 months reported · #10 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
281units

32 buildings · $88.4M valuation

5 month(s) reported to Census

Full year 2025
337units

76 buildings · $119.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Superior's Building Division is operated under contract by SAFEbuilt, but the Town of Superior itself is the issuing authority — permit correspondence and inspection scheduling flow through superiorinspections@safebuilt.com and the Community Core portal, which can read as a third-party service but is the Town's own department infrastructure, not a separate jurisdiction.
  • Superior straddles Boulder and Jefferson Counties, but Boulder County's own Building Permits page confirms the Town maintains its own building department and is excluded from the county's unincorporated permitting program — Boulder County does not issue Superior's permits.
  • Mountain View Fire Protection District conducts a separate, independently-timed fire/sprinkler review for both new residential and commercial construction — do not assume Town permit approval means fire district approval is also complete.
  • Standalone electrical, plumbing, and mechanical trade permits have no Town-published fast-track timeline (unlike some neighboring Boulder County cities' 'Quick Permit' categories) — only the general Commercial/Residential/Resubmittal targets apply.
  • Electrical work is billed on a dedicated valuation/square-footage table separate from the general Building Permit Fee schedule; plumbing and mechanical work have no dedicated table and fall under the general schedule instead.
  • Roofing in Superior requires TWO inspections (mid-roof plus final) rather than the single final inspection common in some neighboring jurisdictions, and 'Woodruff' composite shingles can no longer be repaired — only replaced.

Comparable nearby cities

Lyons
Both in Boulder County8 shared permit typesBoth on the 2023 National Electrical Code (NEC)~21 mi away
Compare fees →
Louisville
Both in Boulder County8 shared permit types~3 mi away
Compare fees →
Lafayette
Both in Boulder County8 shared permit types~5 mi away
Compare fees →