EV Charger / EVSE Permit — Superior, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.superiorcolorado.gov/files/assets/town/v/1/finance/documents/governmental-fee-schedule-2026-final-f30926.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Superior, Colorado
The Town of Superior has no distinct electric-vehicle-charging-station permit or fee line. An EV charger circuit is standalone electrical work billed under the Electrical Permit Fee table's 'Other electrical work' valuation-based tier (the same table documented in this file's Electrical Permit entry, used for service hookups and modular home connections), rather than the residential-square-footage tier used for whole-house wiring — this is a real, currently-published fee-schedule line item and is the governing charge for an EV charger circuit. Superior's 2020 Census population (13,094) exceeds the 10,000-resident municipal threshold in Colorado HB24-1173 (effective 8/7/2024), making the Town a 'covered municipal permitting agency' required to have adopted, by 12/31/2025, either the state's model EV-charger permit code, its own objective EV-charger standards, or an affirmation of its existing review process; a fresh 2026-07-20 re-check of the Town's Municipal Code and Board of Trustees ordinance/resolution list found no public confirmation of which path the Town selected.
Verified 2026-07-20 · Source
When you need this permit
- Contractors must hold a current Town of Superior Electrical Contractor License, requiring active State and Master License copies plus a Certificate of Insurance uploaded via Community Core Contractor
- EV charger circuit work is billed on the dollar value of the electrical installation (the 'Other electrical work' valuation table), the same basis used for service hookups and modular home connections, rather than the square-footage table used for whole-house residential wiring
- Governed by the 2023 NEC as adopted
- Superior (2020 Census population 13,094) is a 'covered municipal permitting agency' under Colorado HB24-1173; no public confirmation of the Town's chosen compliance path (model code, custom standards, or status-quo affirmation) by the 12/31/2025 deadline was located in this review, including after a 2026-07-20 re-check — reported as a genuinely open point rather than assumed
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring and panel/charger circuit installed before concealment
- 2
Final Inspection
Charging equipment installed, system energized and verified
See the full Superior inspection guide — scheduling & re-inspection fees →
Tips
- An EV charger circuit in Superior is billed on the dollar valuation of the electrical work itself (the 'Other electrical work' table), not the square-footage-based residential wiring table — a different calculation basis than a whole-house electrical permit.
- Superior is large enough to be covered by Colorado's HB24-1173 EV-charger-permitting law, but this review (re-chased 2026-07-20) could not confirm which of the three statutory compliance options the Town chose by the 12/31/2025 deadline — call ahead (303-381-2028) to ask whether a streamlined EV-charger review track now exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Superior building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Superior
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →