Inspection sequence, scheduling, and re-inspection fees for building permits in Superior, Colorado.

Verified 2026-07-05 · Source

How to schedule

Inspections are requested through the building department below.

Address
100 Superior Plaza Way, Suite 200, Superior, CO 80027
Phone
303-381-2028
Office hours
Town of Superior general office hours Monday-Friday, 8 a.m.-4 p.m. (per Town website footer); Planning direct line 303-499-3675 ext. 131; Building direct line 303-381-2028; Permit Fees line 720-738-7326. The Building Division is operated under contract by SAFEbuilt; permit applications, submittals, and inspection requests are handled via the Community Core online portal and the superiorinspections@safebuilt.com email address.

Published scheduling rules

  • Because the Building Division is operated by SAFEbuilt under contract, plan review correspondence and inspection scheduling come through superiorinspections@safebuilt.com and the Community Core portal rather than a generic Town government email. (Residential Building Permit (New Construction / Additions))
  • Superior's Building Division is operated under contract by SAFEbuilt, but the Town of Superior itself is the issuing authority — permit correspondence and inspection scheduling flow through superiorinspections@safebuilt.com and the Community Core portal, which can read as a third-party service but is the Town's own department infrastructure, not a separate jurisdiction. (General)

Inspection sequence

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (if new footings)

    Before concrete pour, where applicable

  2. 2

    Rough Frame

    Framing complete, connection to existing structure verified

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction / Additions)

  1. 1

    Foundation/Footing

    Before concrete pour, per 36-inch minimum frost depth and stamped foundation plans

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans; large-format approved plan set must be on site

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    Wiring and panel/charger circuit installed before concealment

  2. 2

    Final Inspection

    Charging equipment installed, system energized and verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Residential/Commercial Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical / Interconnection

    Array wiring, disconnect, and panel connections verified before concealment, per 2023 NEC Article 690 as adopted.

  2. 2

    Final Inspection

    All work complete per approved plans and the Town's Solar Inspection Checklist; final inspection triggers same-day notification to Xcel Energy for interconnection, per the Town's Sustainable Building page.

Applies to: Roofing Permit (Reroof / Repair)

  1. 1

    Mid-Roof Inspection

    Required in addition to the final inspection; a ladder must be supplied by the contractor

  2. 2

    Final Inspection

    Roof complete per approved plans and local roofing amendments; ladder must be supplied

Re-inspection fees

Electrical PermitMobile homes / travel trailer parks · Plus $51.75 for re-inspections
$46.00 per space
Roofing Permit (Reroof / Repair)Reinspection Fee · Applies to a failed/cancelled roof inspection
$100.00 per hour

Superior building permits

Get alerts for Superior

We'll email you when Superior's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.