Superior building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Superior, Colorado.
Verified 2026-07-05 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 100 Superior Plaza Way, Suite 200, Superior, CO 80027
- Phone
- 303-381-2028
- Office hours
- Town of Superior general office hours Monday-Friday, 8 a.m.-4 p.m. (per Town website footer); Planning direct line 303-499-3675 ext. 131; Building direct line 303-381-2028; Permit Fees line 720-738-7326. The Building Division is operated under contract by SAFEbuilt; permit applications, submittals, and inspection requests are handled via the Community Core online portal and the superiorinspections@safebuilt.com email address.
- Website
- Official site
Published scheduling rules
- Because the Building Division is operated by SAFEbuilt under contract, plan review correspondence and inspection scheduling come through superiorinspections@safebuilt.com and the Community Core portal rather than a generic Town government email. (Residential Building Permit (New Construction / Additions))
- Superior's Building Division is operated under contract by SAFEbuilt, but the Town of Superior itself is the issuing authority — permit correspondence and inspection scheduling flow through superiorinspections@safebuilt.com and the Community Core portal, which can read as a third-party service but is the Town's own department infrastructure, not a separate jurisdiction. (General)
Inspection sequence
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour, where applicable
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
Applies to: Residential Building Permit (New Construction / Additions)
- 1
Foundation/Footing
Before concrete pour, per 36-inch minimum frost depth and stamped foundation plans
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans; large-format approved plan set must be on site
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
Wiring and panel/charger circuit installed before concealment
- 2
Final Inspection
Charging equipment installed, system energized and verified
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Residential/Commercial Solar Photovoltaic (PV) Permit
- 1
Rough Electrical / Interconnection
Array wiring, disconnect, and panel connections verified before concealment, per 2023 NEC Article 690 as adopted.
- 2
Final Inspection
All work complete per approved plans and the Town's Solar Inspection Checklist; final inspection triggers same-day notification to Xcel Energy for interconnection, per the Town's Sustainable Building page.
Applies to: Roofing Permit (Reroof / Repair)
- 1
Mid-Roof Inspection
Required in addition to the final inspection; a ladder must be supplied by the contractor
- 2
Final Inspection
Roof complete per approved plans and local roofing amendments; ladder must be supplied
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Superior building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Superior building permits
Get alerts for Superior
We'll email you when Superior's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.