Required for roof replacements and repairs of 100 sq ft or more in the Town of Superior. Billed under the general Building Permit Fee valuation schedule. Governed by detailed local roofing amendments (high-wind criteria, Class A fire rating, ice-and-water shield, mid-roof inspection) published on the Town's dedicated Supplemental Roof Information page.

Verified 2026-07-05 · Source

When you need this permit

  • No permit required for a roof repair under 100 sq ft
  • The Town is a designated high-wind region; all replaced roofs must meet high-wind criteria per ASTM D7158 Class G or H, or ASTM D3161 Class F, per the 2018 IRC wind-criteria requirement adopted June 2020
  • All roofs must carry a Class A fire rating; wood shakes/shingles are acceptable only as part of a Class A-rated assembly (e.g., DensDeck roof board per UL 790)
  • Ice-and-water shield required on all eaves (minimum one 3-foot-wide strip); drip edge required on eaves and rakes
  • New step flashing required at all sloped roof-to-wall intersections, with bump-out flashing where an eave meets a vertical wall; damaged or non-new flashings, valley metal, and vent covers must be replaced
  • Tile roofs replacing another roofing type require an engineer's report on structural load adequacy; a single roof overlay is allowed only with an engineer's report and code-compliant shingles
  • Low-slope roofs (2:12 to 4:12 pitch) require a double layer of underlayment felt per IRC R905.2.7, or a single layer of ice barrier across the entire slope plus 24 inches onto the adjacent slope
  • Tile roof repairs limited to matching style/size; wind damage to 15% of a slope requires replacing the entire slope including ridge and rake; wood shake/shingle roofs must be fully replaced if more than 10% of the roof or 25% of any slope needs repair; repairs are capped at an aggregate 25% of the roof before a full reroof is required
  • 'Woodruff' and similar composite shingles are no longer an approved covering and must be replaced, not repaired, upon damage
  • Roofing contractors must supply proof of Liability and Workers' Compensation insurance naming the Town of Superior as certificate holder Contractor
  • Properties within the Rock Creek Master Homeowners Association require separate HOA Architectural Request approval for roof replacement or repairs exceeding 25% of the roof
  • Mid-roof inspections are required in addition to a final inspection; ladders must be supplied by the contractor for both

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (general valuation-based Exhibit A schedule; no separate roofing table published)Exhibit A, FINAL 2026 03/09/26
$28.50 minimum, scaling per the valuation tiers in the 2026 Governmental Fee Schedule
Plan Review Fee
65% of the Building Permit Fee
Reinspection FeeApplies to a failed/cancelled roof inspection
$100.00 per hour

Review timeline

Plan reviewSuperior’s published plan-review target
10–10 business days

How long did your Roofing Permit (Reroof / Repair) permit actually take in Superior?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Mid-Roof Inspection

    Required in addition to the final inspection; a ladder must be supplied by the contractor

  2. 2

    Final Inspection

    Roof complete per approved plans and local roofing amendments; ladder must be supplied

See the full Superior inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike Lafayette (a neighboring Boulder County city in this corpus, which requires only a single final roof inspection), Superior requires BOTH a mid-roof inspection and a final inspection, and the contractor must supply a ladder for each.
  • Superior's Woodruff/composite-shingle ban means these must be replaced (not repaired) upon any damage — confirm the existing roofing material before scoping a repair job.
  • Rock Creek subdivision properties need a separate HOA Architectural Request approved on top of the Town permit for any roof replacement or repair exceeding 25% of the roof — factor in the HOA's own review timeline.

Frequently asked questions

No permit is required for a roof repair under 100 square feet, per the Town's Supplemental Roof Information page. Repairs of 100 sq ft or more require a permit, and repairs exceeding an aggregate 25% of the total roof require a full reroof instead.

In Superior, the published Building Permit Fee (general valuation-based Exhibit A schedule; no separate roofing table published) is: $28.50 minimum, scaling per the valuation tiers in the 2026 Governmental Fee Schedule. Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Reinspection Fee — $100.00 per hour. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Superior's published plan-review target for a roofing permit (reroof / repair) is 10–10 business days.

You'll need: Building Permit Application (Community Core); Town of Superior Roofing Specialty License. See the required-documents checklist on this page for details on each.

Two: a mid-roof inspection and a final inspection. The contractor must supply a ladder for both, per the Town's Supplemental Roof Information page.

Apply through Town of Superior Planning & Building Department, Building Division (operated by SAFEbuilt) at 100 Superior Plaza Way, Suite 200, Superior, CO 80027. Phone: 303-381-2028, email: superiorinspections@safebuilt.com. Office hours: Town of Superior general office hours Monday-Friday, 8 a.m.-4 p.m. (per Town website footer); Planning direct line 303-499-3675 ext. 131; Building direct line 303-381-2028; Permit Fees line 720-738-7326. The Building Division is operated under contract by SAFEbuilt; permit applications, submittals, and inspection requests are handled via the Community Core online portal and the superiorinspections@safebuilt.com email address.. Official information: https://www.superiorcolorado.gov/Government/Departments/Planning-Building.

Superior, Colorado has adopted: 2024 International Building Code (IBC) — adopted per Chapter 18 of the Superior Municipal Code, per the Town's Building Codes and Zoning Regulations page; 2024 International Residential Code (IRC), with a local amendment adopting the 2018 IRC high-wind roof-covering criteria (ASTM D7158 Class G or H, or ASTM D3161 Class F) for reroofing, per the Town's Supplemental Roof Information page (2018 IRC edition adopted June 2020 specifically for the wind-region roofing requirement, ahead of the Town's broader 2024 code cycle); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC); 2024 International Fire Code (IFC); 2024 International Fuel Gas Code (IFGC); 2024 International Existing Building Code (IEBC); 2024 International Private Sewage Disposal Code; 2024 International Property Maintenance Code; Metro Cohort Model Code, based on the 2024 International Energy Conservation Code (IECC) — per the Town's Building Codes and Zoning Regulations page; 2023 National Electrical Code (NEC); Superior Municipal Code Section 18-14-40 (Minimum Efficiency Requirement / Construction Waste Recycling) — requires an applicant for a new residential structure building permit to demonstrate a minimum of 50% of construction waste is recycled, with waste diversion tracking submitted to the Town at project completion; additions/remodels over 500 sq ft are encouraged (not required) to divert waste. Local amendments apply — see the Superior overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Superior building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.