Skip to main content
PermitBase

Mountain Village building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Mountain Village, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
455 Mountain Village Blvd., Suite A, Mountain Village, CO 81435 (Town Hall); Municipal Building at 411 Mountain Village Blvd., Mountain Village, CO 81435
Phone
970-728-8000 (Town main line); Building Division direct 970-728-1392; Inspection Request Line 970-369-8251
Office hours
Town Hall and Municipal Building: Monday-Friday 8:00 a.m.-5:00 p.m. Building Division fax: 970-728-4342. Licensed contractor list requests: Tracy Bach, 970-369-8242.

Inspection guide

See how inspections work in Mountain Village — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2024 International Building Code (IBC) — current per the Town's live Building Division 'Codes & Guides' listing
  • 2024 International Residential Code (IRC) — current per the same live listing
  • 2024 International Existing Building Code (IEBC)
  • 2024 International Mechanical Code (IMC)
  • 2024 International Fuel Gas Code (IFGC)
  • 2024 International Fire Code (IFC) — enforced by the Telluride Fire Protection District (TFPD) per Chapter 17.7.19 of the Building Regulations
  • 2023 National Electrical Code (NEC/NFPA 70), as adopted by the State of Colorado
  • 2021 International Energy Conservation Code (IECC), plus the Town's own 'Local Energy Saving Measures' (HERS ratings, Smart Building Program/REMP) layered on top per Chapter 17.7.12
  • International Plumbing Code (IPC), as adopted by the State of Colorado — 2024 edition per the live Codes & Guides listing
  • Prior code cycle (superseded, retained for reference only): 2018-edition IBC/IRC/IEBC/IMC/IFGC/IPC/IPMC and 2020 NEC, per the Town's currently-posted 'CHAPTER 17.7 BUILDING REGULATIONS' PDF (townofmountainvillage.com/site/assets/files/40818/building_regulations.pdf) — this PDF's detailed section-by-section amendment text (climatic design table, contractor licensing exam list, IECC HERS/REMP mechanics, plumbing/mechanical/electrical amendments) is the only full amendment text this session could access (the live mountainvillage.municipal.codes host, which likely carries the current 2024-cycle amendment text, returned HTTP 403 to automated fetches even with full browser headers, consistent with this corpus's recurring civic-code-host blocking pattern). The Town's live Building Division page confirms Ordinance 2025-05 updated Chapter 17.7 to the 2024 ICC code cycle, but this session could not pull that ordinance's specific amendment-section text directly — administrative structure (Building Division under Planning and Development Services, permit expiration/fee/inspection provisions, contractor licensing structure) is treated as verified-current since those provisions are corroborated by the live page; code-specific numeric amendments below (snow load, wind speed, etc.) are sourced from the 2018-cycle PDF and flagged as potentially superseded rather than silently presented as current 2024-cycle figures.
  • All codes locally amended via Mountain Village Municipal Code Chapter 17.7 (Building Regulations, within the Community Development Code/CDC).

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date
No data reported
Latest full year
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Mountain Village is a home-rule town with its OWN Planning and Development Services Department, Building Division (455 Mountain Village Blvd., Suite A) — San Miguel County's own Building Department has authority only over unincorporated county land and does not issue permits within Mountain Village town limits, and neighboring Telluride's own separate Building Division likewise has no authority here despite the two towns sharing a gondola connection and, for fire code purposes, the same Telluride Fire Protection District.
  • The Town's live Building Division page confirms the CURRENT code cycle as 2024 IBC/IRC/IMC/IFGC/IEBC/IFC, 2023 NEC, and 2021 IECC (updated via Ordinance 2025-05) — but the only full section-by-section amendment-text PDF this session could access is still on the OLDER 2018 code cycle (2020 NEC). The live mountainvillage.municipal.codes host, which likely carries the current 2024-cycle amendment text, returned HTTP 403 to automated fetches with full browser headers, matching this corpus's recurring civic-code-host blocking pattern. Administrative/procedural provisions (permit expiration, fees, inspections, contractor licensing structure) are corroborated as current by the live page; code-specific numeric design criteria (snow load, wind speed, seismic category) below are from the 2018-cycle text and flagged as possibly superseded rather than silently presented as current.
  • Climatic and Geographic Design Criteria (Municipal Code 17.7.10, Section 1601.2, last-confirmed 2018-cycle text): 130 lbs minimum ground snow load plus elevation per the SEAC Guide, 90 mph 3-second gust wind speed/Exposure C, Climate Zone 6B, Seismic Design Category C, 48-inch frost line depth, Severe weathering, slight-to-moderate termites, -15°F winter design temp, 40°F mean annual temp — confirm against the Town directly before relying on these for a live 2024-cycle submission.
  • Contractor licensing splits by trade: General/Roofing/Mechanical contractors need Town-issued building licenses backed by current ICC certification (GC-A/B/C exams, Master Mechanical exam, Roofing exam); Electrical and Plumbing contractors instead need ONLY Colorado state licensure plus Town registration (no Town registration fee for those two trades). Random job-site license checks are conducted by Town inspectors; non-compliant workers can be sent off-site and reported to DORA.
  • Owner-builders occupying the home as a primary residence for 2+ years are exempt from the contractor-license requirement (Municipal Code 17.7.9.D) but must sign a Town-approved, county-recorded Homeowner Contractor Affidavit and be on-site at least twice weekly, present for every inspection.
  • The Town publishes NO numeric plan-review turnaround (days or weeks) for any standard building-permit category anywhere on its site — not on the Building Division page, the Building Regulations PDF, the 2025 Community Development Fee Schedule, or the Inspection Information document. Colorado is home-rule with no statewide clock, and every permitType in this file is honestly null/unverified with a documented chase trail rather than an invented figure (including not borrowing Telluride's own null figure from the same county).
  • A single Table 1-A valuation-based fee schedule applies to Building, Mechanical, Electrical, and Plumbing permits alike, with permits under $1,500 total valuation FEE-WAIVED entirely — a materially more generous small-project threshold than Telluride's flat $51.50 minimum in the same county.
  • Total project cost has FIVE stacking components beyond the base permit fee: Plan Review Fee (65% of permit fee), Mountain Village Use Tax (4.5% of 40% of valuation), San Miguel County Use Tax (1% of 40% of valuation), and a Road Impact Fee ($1/sq ft new construction or $1/$400 valuation for remodels, waived for deed-restricted housing) — all five sum to the total permit fee due at issuance per the fee schedule's own formula.
  • The Renewable Energy Mitigation Program (REMP)/Exterior Energy Use Offset Program is a genuinely distinct approval gate for any project with snowmelt systems, site-built pools, or spas — offset or payment-in-lieu is calculated via the Town's own spreadsheet and must be resolved before permit issuance, separate from standard IECC compliance.
  • The Smart Building Incentive Program (Ordinance 2015-02) can discount the Building Permit Fee by up to 100% collectively across four stackable incentives (renewable energy offset, snowmelt-free roof design, no-exterior-energy-use covenant, low HERS rating) — worth investigating for any high-end custom build in this market before assuming standard fees apply.
  • Roof Material changes require a SEPARATE Planning Department Design Review Process approval (Class 1, Staff Level) in addition to the Building Division permit — don't assume a re-roof is purely a Building Division transaction.
  • Private sewage disposal (septic) systems are flatly PROHIBITED within Town limits; building sewers must connect to the municipal system at a minimum 6-foot burial depth.
  • Fence, ADU, and standalone Demolition permits are NOT modeled as separate permitTypes in this file: the fee schedule lists only a generic Demolition Permit Fee (taxes only, no distinct valuation table/timeline/documents) and this session's ADU/fence findings were zoning-level Planning/CDC criteria rather than Building Division permit-type data with its own fees and process. All still require a standard Building Division permit (via Residential Building or Addition/Remodel) plus any applicable Planning Department Design Review.
  • This session confirmed accessibility of the Town's own domain (townofmountainvillage.com) and its PDF DocumentCenter via a full-browser-header curl request (both returned HTTP 200) — the mountainvillage.municipal.codes host, hosting the live/current Municipal Code text, returned a hard 403 to the same technique, consistent with the Telluride file's identical finding for telluride.municipal.codes in this same session/corpus.

Comparable nearby cities

Telluride
Both in San Miguel County8 shared permit typesBoth on the 2024 International Existing Building Code (IEBC)~2 mi away
Compare fees →
Breckenridge
8 shared permit typesBoth on the 2024 International Existing Building Code (IEBC)
Compare fees →
Castle Rock
8 shared permit typesBoth on the 2024 International Mechanical Code (IMC)
Compare fees →