Roofing Permit (Re-Roof) in Mountain Village, Colorado

Required for re-roofing work in the Town of Mountain Village, reviewed as a Building Permit under the same Table 1-A valuation-based fee schedule (no separate flat re-roof fee is published). Roofing contractors must hold current ICC Roofing Contractor certification. Local amendments relax corrosion-resistance requirements for metal roofing given the Town's aged-metal aesthetic, but a Design Review Process fee applies for roof material changes reviewed by the Planning Department.

Verified 2026-07-06 · Source

When you need this permit

  • Reviewed under the Town's currently-adopted IBC/IRC cycle; billed under the same Building Permit Table 1-A valuation schedule (no standalone flat roofing fee published)
  • Roofing contractors must hold current ICC Roofing Contractor Exam certification for a Town building license
  • Metal sheet roof coverings and valley flashing are NOT required to be corrosion-resistant or listed by any agency in Mountain Village (local amendment deleting the IBC/IRC's standard corrosion-resistance requirement) — where installed, metal roofing must be a minimum of 22 gauge
  • Roof Material changes also route through the Planning Department's Design Review Process (Class 1, Staff Level Review) as a distinct fee/approval from the Building Division permit itself
  • Snowmelt-free roof designs (with snow/ice-fall safety measures at protected entries) are eligible for a 20% Building Permit Fee discount under the Smart Building Incentive Program

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, Table 1-A, same schedule as new construction)No separate flat re-roof fee is published; billed under the general Table 1-A Building Permit Fee schedule based on roofing project valuation
Waived under $1,500 valuation; scaling per the Table 1-A tiers above that
Roof Material Design Review Fee (Planning Department)Distinct from the Building Division permit fee; a Planning-level design review
Class 1 review fee per the 2025 Fee Schedule's Planning Department Fees table
Plan Review Fee
65% of the Building Permit Fee
Mountain Village Use Tax
4.5% of 40% of project valuation
San Miguel County Use Tax
1% of 40% of project valuation

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Mountain Village?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Mid-Roofing / Roofing

    After underlayment/flashing installed

  2. 2

    Final Roofing

    Completed roof; snow-shed safety measures and flashing/valley compliance verified

See the full Mountain Village inspection guide — scheduling & re-inspection fees →

Tips

  • Mountain Village's local amendment removes the standard IBC/IRC corrosion-resistance requirement for metal roofing and valley flashing (aged/unfinished metal is explicitly allowed) — don't assume a corrosion-resistant-coating requirement applies here as it might elsewhere.
  • Even a like-for-like roof material swap routes through a separate Planning Department Class 1 Design Review, not just the Building Division permit — budget for both approvals.
  • A snowmelt-free roof design with protected-entry safety measures qualifies for a 20% Building Permit Fee discount under the Smart Building Incentive Program — confirm eligibility with the Building Official before assuming standard fees apply.

Frequently asked questions

Mountain Village requires a roofing permit (re-roof) for: Reviewed under the Town's currently-adopted IBC/IRC cycle; billed under the same Building Permit Table 1-A valuation schedule (no standalone flat roofing fee published); Roofing contractors must hold current ICC Roofing Contractor Exam certification for a Town building license; Metal sheet roof coverings and valley flashing are NOT required to be corrosion-resistant or listed by any agency in Mountain Village (local amendment deleting the IBC/IRC's standard corrosion-resistance requirement) — where installed, metal roofing must be a minimum of 22 gauge; Roof Material changes also route through the Planning Department's Design Review Process (Class 1, Staff Level Review) as a distinct fee/approval from the Building Division permit itself; Snowmelt-free roof designs (with snow/ice-fall safety measures at protected entries) are eligible for a 20% Building Permit Fee discount under the Smart Building Incentive Program. If your project isn't listed, confirm with Town of Mountain Village Planning and Development Services Department, Building Division at 970-728-8000 (Town main line); Building Division direct 970-728-1392; Inspection Request Line 970-369-8251 before starting work.

In Mountain Village, the published Building Permit Fee (valuation-based, Table 1-A, same schedule as new construction) is: Waived under $1,500 valuation; scaling per the Table 1-A tiers above that. Additional published fees: Roof Material Design Review Fee (Planning Department) — Class 1 review fee per the 2025 Fee Schedule's Planning Department Fees table; Plan Review Fee — 65% of the Building Permit Fee; Mountain Village Use Tax — 4.5% of 40% of project valuation; San Miguel County Use Tax — 1% of 40% of project valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Mountain Village does not publish a plan-review timeline for this permit. Contact Town of Mountain Village Planning and Development Services Department, Building Division at 970-728-8000 (Town main line); Building Division direct 970-728-1392; Inspection Request Line 970-369-8251 for current turnaround.

You'll need: Building Permit Application (OpenGov) — Re-Roof scope; Roof Material Design Review Application. See the required-documents checklist on this page for details on each.

Mountain Village requires 2 inspection(s) for a roofing permit (re-roof), in order: Mid-Roofing / Roofing, Final Roofing. Schedule each through Town of Mountain Village Planning and Development Services Department, Building Division (970-728-8000 (Town main line); Building Division direct 970-728-1392; Inspection Request Line 970-369-8251).

Apply through Town of Mountain Village Planning and Development Services Department, Building Division at 455 Mountain Village Blvd., Suite A, Mountain Village, CO 81435 (Town Hall); Municipal Building at 411 Mountain Village Blvd., Mountain Village, CO 81435. Phone: 970-728-8000 (Town main line); Building Division direct 970-728-1392; Inspection Request Line 970-369-8251, email: Contact form only at time of this review (townofmountainvillage.com/business/building/building-division/); no single published department inbox address found. Office hours: Town Hall and Municipal Building: Monday-Friday 8:00 a.m.-5:00 p.m. Building Division fax: 970-728-4342. Licensed contractor list requests: Tracy Bach, 970-369-8242.. Official information: https://townofmountainvillage.com/business/building/building-division/.

Mountain Village, Colorado has adopted: 2024 International Building Code (IBC) — current per the Town's live Building Division 'Codes & Guides' listing; 2024 International Residential Code (IRC) — current per the same live listing; 2024 International Existing Building Code (IEBC); 2024 International Mechanical Code (IMC); 2024 International Fuel Gas Code (IFGC); 2024 International Fire Code (IFC) — enforced by the Telluride Fire Protection District (TFPD) per Chapter 17.7.19 of the Building Regulations; 2023 National Electrical Code (NEC/NFPA 70), as adopted by the State of Colorado; 2021 International Energy Conservation Code (IECC), plus the Town's own 'Local Energy Saving Measures' (HERS ratings, Smart Building Program/REMP) layered on top per Chapter 17.7.12; International Plumbing Code (IPC), as adopted by the State of Colorado — 2024 edition per the live Codes & Guides listing; Prior code cycle (superseded, retained for reference only): 2018-edition IBC/IRC/IEBC/IMC/IFGC/IPC/IPMC and 2020 NEC, per the Town's currently-posted 'CHAPTER 17.7 BUILDING REGULATIONS' PDF (townofmountainvillage.com/site/assets/files/40818/building_regulations.pdf) — this PDF's detailed section-by-section amendment text (climatic design table, contractor licensing exam list, IECC HERS/REMP mechanics, plumbing/mechanical/electrical amendments) is the only full amendment text this session could access (the live mountainvillage.municipal.codes host, which likely carries the current 2024-cycle amendment text, returned HTTP 403 to automated fetches even with full browser headers, consistent with this corpus's recurring civic-code-host blocking pattern). The Town's live Building Division page confirms Ordinance 2025-05 updated Chapter 17.7 to the 2024 ICC code cycle, but this session could not pull that ordinance's specific amendment-section text directly — administrative structure (Building Division under Planning and Development Services, permit expiration/fee/inspection provisions, contractor licensing structure) is treated as verified-current since those provisions are corroborated by the live page; code-specific numeric amendments below (snow load, wind speed, etc.) are sourced from the 2018-cycle PDF and flagged as potentially superseded rather than silently presented as current 2024-cycle figures.; All codes locally amended via Mountain Village Municipal Code Chapter 17.7 (Building Regulations, within the Community Development Code/CDC).. Local amendments apply — see the Mountain Village overview page for the full list.

Yes. Roof material changes route through the Planning Department's Design Review Process (Class 1, Staff Level Review) as a distinct approval and fee from the Building Division's building permit itself.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountain Village building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.