Sign Permit — Mountain Village, Colorado · Requirements sheet
Verified 2026-08-14 · Source: https://mountainvillage.municipal.codes/MVMC/17.5.13
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Mountain Village, Colorado
Mountain Village Municipal Code Chapter 17.5.13 (Sign Regulations, part of the Community Development Code's Design Regulations) requires most signs to be approved through the Town's Design Review Process. The Town's own 2025/2026 Community Development Fee Schedule lists 'Signs' as a dedicated Planning Department line item classified as a Class 1 (Staff Level Review) application with a flat $125 fee. There is no standalone 'Sign Permit' record type in the Town's OpenGov portal -- signs are filed as a generic 'Class 1 Application,' confirmed directly on the Town's live OpenGov Planning Department category page ('Class 1 Application: Small-scale design changes eligible for staff-level review').
Verified 2026-08-14 · Source
When you need this permit
- Reviewed under Municipal Code Chapter 17.5.13 (Sign Regulations) as a Design Review Process application; the Town's Fee Schedule classifies 'Signs' as a Class 1 (Staff Level Review) application, per Table of Planning Department Fees
- Filed in OpenGov as a 'Class 1 Application' (mountainvillageco.portal.opengov.com) -- confirmed directly on the Town's live Planning Department category page that no separate 'Sign Permit' record type exists
- All Planning Department applications must include: Owner/Agent Authorization Form, Owner/Applicant Acknowledgement of Responsibilities, an HOA Letter (if applicable), and Design Plans, per the Town's live OpenGov Planning Department page
- Exempt from a sign permit: signs lawfully placed by the Town, San Miguel County, the State of Colorado, or the Federal government (including MUTCD traffic control signs); vehicle-affixed signs incidental to the vehicle's primary use; open house signs (permitted 48 hours before the event, maximum 2 per event, not exceeding 5 sq ft per face or 10 sq ft total for a 2-faced sign); and private-property notice signs not exceeding 2 sq ft per face / 4 sq ft total, limited to 4 per use or building, per Sec. 17.5.13
- Temporary special event signs: maximum 1 per window and 3 total per event, each not exceeding 3 sq ft, displayed no more than 14 days and removed the day after the event ends; requires an underlying special event development application, per Sec. 17.5.13(E)(1)
- Address identification monument signs proposed within the general easement may require the property owner to enter into a revocable license agreement with the Town before issuance of the required development or building permit, per Sec. 17.5.13
- A unified 'Sign Program' is required for developments seeking flexibility/creativity across multiple signs (e.g., multi-tenant commercial); an approved Sign Program must be incorporated into a Development Agreement, per Sec. 17.5.13(K)
- Ski resort operators seeking off-premises advertising signage (base areas, gondola stations, on-mountain restaurants/bars, lift safety bars) must propose a dedicated sign program under Sec. 17.5.13(L)
- Any electrical work associated with an illuminated sign requires a separate Electrical Permit under Municipal Code Chapter 17.7.16 (2023 NEC as adopted)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
See the full Mountain Village inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated 'Sign Permit' application type in Mountain Village's OpenGov portal -- signs are filed as a generic 'Class 1 Application,' the same staff-level review track used for other small-scale design changes.
- Illuminated signs need a separate Electrical Permit for the wiring in addition to the Class 1 sign approval -- the $125 Planning fee covers only the design review, not any electrical work.
- Multi-tenant or commercial developments wanting a unified signage look across several tenants should look into a Sign Program (Sec. 17.5.13(K)) rather than filing separate Class 1 applications for each individual sign -- a Sign Program gets incorporated into a Development Agreement.
- Open house signs and small private-property notice signs are permit-exempt within specific size and quantity limits -- check Sec. 17.5.13 before assuming a small residential sign needs Planning Department review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountain Village building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Mountain Village
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Mountain Village project checklist
Describe your project once and get every permit, document, and fee it triggers in Mountain Village — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →