Residential Addition / Interior Remodel Permit in Mountain Village, Colorado
Required for additions and interior/exterior remodels to existing single-family, duplex, and townhouse structures in Mountain Village. Reviewed under the Town's currently-adopted IRC cycle as locally amended by Chapter 17.7. Remodels are billed on a distinct fee basis ($1.00 per $400 of project valuation for the Road Impact Fee component) rather than the flat per-square-foot new-construction rate.
Verified 2026-07-06 · Source
When you need this permit
- Reviewed under the Town's currently-adopted IRC cycle (2024 edition per the live Codes & Guides listing) as amended by Chapter 17.7
- Automatic residential fire sprinkler systems are NOT required for additions/alterations to existing buildings that do not already have a sprinkler system installed (Municipal Code 17.7.11 IRC R313.1/R313.2 local amendment)
- Direct-vent furnace (minimum 92% AFUE) or direct-vent boiler (minimum 90% AFUE) required if the scope of an addition/remodel requires furnace or boiler replacement
- Contractor must complete OpenGov Contractor Registration before submitting the permit application Contractor
- Permit becomes invalid if work is not commenced within 180 days of issuance, suspended/abandoned for 180 days, or if no inspection is requested within 180 days of the last approved inspection
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (additions with new footings only)
Before concrete pour, per 48-inch minimum frost depth
- 2
Rough Frame / Rough Electrical / Rough Plumbing / Rough Mechanical
Trade rough-ins before concealment; connection to existing structure verified
- 3
Final Building / Final Electrical / Final Plumbing / Final Mechanical
All work complete per approved plans; fee and tax reconciliation
See the full Mountain Village inspection guide — scheduling & re-inspection fees →
Tips
- Remodel Road Impact Fees are calculated differently from new construction ($1 per $400 of valuation rather than $1 per gross square foot) — confirm your project is correctly classified before estimating total permit cost.
- Furnace or boiler replacement triggered by a remodel's scope must meet the Town's direct-vent minimum AFUE requirements (92% furnace / 90% boiler) even if the rest of the project doesn't otherwise touch mechanical systems.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountain Village building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Mountain Village
Residential Addition / Interior Remodel Permit in other cities
Compare residential addition / interior remodel permit fees across Colorado →
Look up this fee in a different city →