Blue River building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Blue River, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Town Hall, 0110 Whispering Pines Circle, Blue River, CO 80424 (mailing: P.O. Box 1784, Breckenridge, CO 80424)
- Phone
- (970) 547-0545 (Town Hall, ext. 1 for building permit questions); Building Official direct: (720) 241-4741
- Office hours
- Town Hall open Tuesday-Friday, 7:00 a.m.-5:00 p.m. (per the Town's own Contact Us page, verified live 2026-07-06). Building inspections are conducted Tuesdays and Thursdays and must be scheduled by 4:00 p.m. the day before (Monday inspections scheduled by 4:00 p.m. the prior Thursday); requests received Friday are scheduled for the following Tuesday. The Building Official's function is performed by a contracted firm (email domain caa.inc), not a Summit County employee and not a direct Town staff member.
- Website
- Official site
Published scheduling rules
- Schedule inspections by 4:00 p.m. the day before (Tuesdays/Thursdays only, per the Building Inspections page) or by Thursday 4:00 p.m. for a Monday inspection; requests received Friday roll to the following Tuesday. (Building Permit — New Construction (Type A Permit))
Inspection sequence
Applies to: Building Permit — New Construction (Type A Permit)
- 1
Layout & Footings
Forms & steel in place; all materials except concrete on site
- 2
Foundation Walls
Forms & steel in place; Foundation ILC must be received by Building Official prior to this inspection
- 3
Foundation Damp-proofing
- 4
Foundation Insulation
- 5
Foundation Drain
Properly bedded, prior to cover-up
- 6
Underground Plumbing / Underground Electric / Concrete Slab Prep
Prior to cover; on test as applicable
- 7
Rough Plumbing / Rough Mechanical / Rough Electric
Installed and on test prior to cover
- 8
Framing
After plumbing, mechanical & electric rough inspections are approved; ridgeline ILC required first if applicable
- 9
Insulation
Insulation certificate must be received by Building Official prior to this inspection
- 10
Roof Underlayment, Fireplace Chase, Gypsum Board Nail/Screw
Sequenced finish-stage inspections
- 11
Final Plumbing / Final Mechanical / Final Electrical
All fixtures, equipment, and appliances installed and operable
- 12
Final Building Inspection
After completion of paint, finish, parking, landscaping, cleanup; requires Summit County Health Department (septic) or Upper Blue Sanitation District (sewer) approval, and HOA approval for certain subdivisions; blower door test/air-sealing sign-off required
Applies to: Addition / Remodel / Deck Permit (Type A or Type B Permit)
- 1
Framing
After framing complete, before wall cover
- 2
MEP Rough-In
If mechanical, electrical, or plumbing work is part of the scope
- 3
Final Building Inspection
All work complete per approved plans
Applies to: Electrical Permit (Type C Permit)
- 1
Underground Electric
Before cover, if applicable to scope
- 2
Rough Electric
All wiring pulled & splices made, before wall cover
- 3
Final Electrical
All equipment and appliances installed and operable
Applies to: Plumbing Permit (Type C Permit)
- 1
Underground Plumbing
Prior to cover, properly bedded, on test
- 2
Rough Plumbing
Installed, on test, before wall cover
- 3
Final Plumbing
All fixtures and appliances installed and operable
Applies to: Mechanical Permit (Type C Permit)
- 1
Rough Mechanical
Chimneys, vents, piping & ducts installed; gas line & heat pipe on test
- 2
Final Mechanical
All combustion air, equipment & appliances installed and operable; Flammable Gas Alarm/Shutoff required for propane systems over 60,000 BTU/Hr
Applies to: Roof Permit (Type C Permit)
- 1
Roof Underlayment
After ice & water shield is in place
- 2
Final Building Inspection
Roof work confirmed complete as part of overall final sign-off
Final inspection only: EV Charger / EVSE Installation Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Blue River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Blue River building permits
Get alerts for Blue River
We'll email you when Blue River's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.