This is PermitBase’s published record for Ault as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Ault building permits

Ault, Colorado — as published 2026-07-06.

Reviewed 2026-07-06 · Source

Codes adopted

2024 International Residential Code (IRC) — per the '2026 SAFEbuilt Residential Application Check List' (Town of Ault Building Permits page, Helpful/Residential resource): 'All submittal information must comply with the 2024 I-codes and the 2023 NEC.'2024 International Building Code (IBC) — per the SAFEbuilt 'New Commercial Plan Submittal Procedure' and 'Commercial Tenant Finish/Remodel Plan Submittal Procedure' documents on the Town of Ault Building Permits page, both headed '2024 INTERNATIONAL CODES.'2024 International Energy Conservation Code (IECC) — required compliance documentation (ResCheck or energy rating report) explicitly named in the SAFEbuilt Residential Application Check List; commercial submittal procedures likewise require 'Documentation showing compliance with the 2024 IECC.'2023 National Electrical Code (NEC) — explicitly named in the SAFEbuilt Residential Application Check List ('...and the 2023 NEC').2024 International Mechanical Code (IMC) / International Plumbing Code (IPC) — inferred from the SAFEbuilt submittal procedures' consistent requirement of 'Mechanical/Plumbing Plans' stamped by a Colorado-licensed engineer, cross-referenced against the same '2024 INTERNATIONAL CODES' heading used for the IBC/IECC citation on the same documents; not independently named by edition number in the source text, so carried at 'partial' confidence for the specific IMC/IPC edition number.1997 Uniform Building Code (UBC), Table 1-A — still the operative VALUATION-BASED FEE TABLE per the Town's 'Building Permit Fee Schedule' (Exhibit B — Fee Schedule for Services, a SAFEbuilt consultant-services fee exhibit posted on the Town's Building Permits resource list, last modified 5/19/24). This is a fee-calculation table, not a life-safety code edition, and is retained purely because it is the Town's actual current, published fee mechanism — it does not indicate the Town is still enforcing 1997 UBC life-safety provisions, which are superseded by the 2024 I-codes cited above.No separate Ault-specific building-code-adoption ordinance was found published online: the Town of Ault Municipal Code page (aultcolorado.gov/MuniCode) states 'A Copy of the Ault Municipal Code is Available Upon Request' and is not hosted on Municode/eCode360 or any other public code-hosting platform; the Town's online Document Archive 'Ordinances' folder contains only a 'Non-Certified Copy of 2024 Model Traffic Code' (unrelated to building codes). The SAFEbuilt submittal-requirement documents (which explicitly compel 2024 I-code / 2023 NEC compliance and are hosted directly on the Town's own Building Permits page) are therefore treated as the governing, currently-operative code-adoption source for this file, consistent with SAFEbuilt Colorado being Ault's contracted building official/plan-review/inspection provider (per Exhibit B of the Town-SAFEbuilt consultant services agreement).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family, two-family, and townhome construction in the Town of Ault. Plan review, building official services, and inspections are performed by SAFEbuilt Colorado under contract to the Town, applying the 2024 IRC, 2024 IECC, and 2023 NEC.

Verified 2026-07-06 · Source

Requirements

  • Completed building permit application form
  • Electronic plot plan showing property address, north arrow and scale, lot dimensions, all projections (stairs, balconies, decks, cantilevers), legal description/subdivision name, distances in feet from the proposed structure to property lines (N/S/E/W) and to existing structures, description of what surrounds the property, and a seal from a registered design professional
  • One electronic set of: architectural/floor plans; engineered structural plans stamped by a Colorado-licensed engineer; electrical plans (panel locations, receptacles, lighting); mechanical plans (equipment location, duct sizes/locations/terminations); fire protection plans (stamped) if a sprinkler system is part of the design; soils report for the specific property
  • Manual J, D, and S compliance calculations (one electronic copy)
  • 2024 IECC energy code compliance documentation: a completed ResCheck specific to the proposed home, OR an energy compliance report from an energy rating company, with all energy documents consistent with each other
  • EV-ready, Solar-ready, and Electric-ready documentation for new single-family, two-family, and townhome dwellings per the Town's SAFEbuilt-administered checklist (see tips)
  • All plan sheets must bear the original seal of a Colorado-licensed architect or engineer unless exempted under section 12-4-112 C.R.S.

Required documents

  • RequiredBuilding Permit ApplicationCompleted application form describing the project
  • Required2026 SAFEbuilt Residential Application Check ListGoverning submittal checklist for residential permits in Ault; hosted on the Town's Building Permits page
  • RequiredEngineered Structural PlansStamped by a Colorado-licensed engineer
  • RequiredSoils ReportFor the specific property
  • Required2024 IECC Compliance DocumentationCompleted ResCheck or an energy compliance report from an energy rating company

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00 (1997 UBC Table 1-A)$23.00Exhibit B — Fee Schedule for Services, Town of Ault (last modified 5/19/24)
Building Permit Fee — valuation $501.00 to $2,000.00$23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000.00
Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000.00
Building Permit Fee — valuation $25,001.00 to $50,000.00$391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00
Building Permit Fee — valuation $50,001.00 to $100,000.00$643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00
Building Permit Fee — valuation $100,001.00 to $500,000.00$993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000.00
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000.00
Building Permit Fee — valuation $1,000,001.00 and up$5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof
Plan Review Fee — One, Two, and Three Family Residences30% of Building Permit FeeExhibit B plan review fee schedule
Reinspection Fee$75.00
Investigation Fee (work started without a permit)50% of permit fee
Inspections Outside of Normal Business Hours$100.00 per hour, one-hour minimumTime tracked from when the SAFEbuilt consultant checks in at the municipality or first inspection site

Residential Addition / Remodel Permit

Required for additions and remodels to existing residential structures in Ault, reviewed by SAFEbuilt Colorado under the same submittal framework as new residential construction, scaled to the scope of work.

Reviewed 2026-07-06 · Source

Requirements

  • Completed building permit application describing project scope and valuation
  • Applicable subset of the Residential Application Check List documents depending on scope (e.g., structural plans only if bearing walls are affected; electrical/mechanical plans only if those systems are altered)
  • 2024 IECC energy code compliance documentation where the scope affects the building envelope or systems
  • All plan sheets sealed by a Colorado-licensed design professional unless exempted under section 12-4-112 C.R.S.

Required documents

  • RequiredBuilding Permit Application
  • Required2026 SAFEbuilt Residential Application Check ListSame governing checklist used for new construction; applicant and SAFEbuilt determine which line items apply to the specific addition/remodel scope

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same 1997 UBC Table 1-A valuation-based schedule as new construction)$23.00 minimum, scaling per Exhibit B valuation tiersExhibit B — Fee Schedule for Services
Plan Review Fee — One, Two, and Three Family Residences30% of Building Permit Fee
Small Remodel and Commercial Projects Plan Review Fee30% of Building Permit FeeApplies to smaller-scope remodel work per Exhibit B

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Ault. Fees are set under the State of Colorado Electrical Board fee schedule plus a 15% local surcharge (the maximum allowed under CRS 12-23-117(3)); permit issuance and inspection are administered locally by SAFEbuilt Colorado under contract to the Town, applying the 2023 NEC.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2023 NEC as referenced in the Town's SAFEbuilt Residential Application Check List
  • Electrical contractors must hold a current Colorado State Electrical Board (DORA) license; the Town's fee schedule explicitly ties electrical fees to the 'most current version of the State of Colorado Electrical Board fee schedule' plus 15%
  • Electrical plans (panel locations, receptacles, lighting plan or one-line diagram and load calculations for commercial work) required as part of the relevant submittal packet

Required documents

  • RequiredElectrical Permit Application

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeCurrent State of Colorado Electrical Board fee schedule amount, plus 15% local surchargeExhibit B — Fee Schedule for Services, Town of Ault; consistent with the maximum 15% surcharge authorized under CRS 12-23-117(3)

Plumbing Permit

Required for plumbing installation, alteration, or repair in Ault. Unlike electrical permits, plumbing permit fees are NOT tied to a state board fee schedule — they use the Town's own 1997 UBC Table 1-A valuation-based fee table, administered locally by SAFEbuilt Colorado.

Reviewed 2026-07-06 · Source

Requirements

  • Plumbing plans required as part of the applicable submittal packet (residential or commercial) showing sewer, drains, vents, water piping, roof drains, and gas piping as applicable
  • Colorado plumbing contractors must hold a current DORA State Plumbing Board license (contractor licensure is state-regulated even though permit issuance and fee-setting is local)
  • All plan sheets sealed by a Colorado-licensed engineer where required, unless exempted under section 12-4-112 C.R.S.

Required documents

  • RequiredBuilding Permit Application (plumbing scope)

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee (1997 UBC Table 1-A valuation-based schedule, same table as Building)$23.00 minimum, scaling per Exhibit B valuation tiersExhibit B — Fee Schedule for Services; no separate state-board pass-through fee applies to plumbing, unlike electrical

Mechanical / HVAC Permit

Verified

Required for heating, cooling, and ventilation equipment installation or replacement in Ault, administered locally by SAFEbuilt Colorado using the Town's 1997 UBC Table 1-A valuation-based fee schedule.

Verified 2026-07-06 · Source

Requirements

  • Mechanical plans showing equipment location, duct sizes/locations, and duct termination sizes/locations required as part of the applicable submittal packet
  • For a straightforward furnace/air conditioner replacement (no other scope), the Single Stop Projects flat fee applies instead of the valuation table

Required documents

  • RequiredBuilding Permit Application (mechanical scope)

Fee schedule

Fee typeAmountNotes
Furnace/Air Conditioner (Single Stop Project)$70.00Exhibit B — Fee Schedule for Services, Single Stop Projects Fee Schedule
Mechanical Permit Fee — full mechanical scope beyond a single-stop furnace/AC swap1997 UBC Table 1-A valuation-based schedule, $23.00 minimumApplies when mechanical work is part of a broader building permit rather than a standalone furnace/AC replacement

Roofing Permit (Re-Roof)

Verified

Required for re-roofing work in Ault. Billed as a flat 'Single Stop Project' fee rather than the valuation-based table. Governed by 2024 IRC Section R908 re-roofing provisions per SAFEbuilt's Building Guide for Homeowners.

Verified 2026-07-06 · Source

Requirements

  • No more than two (2) layers of roofing are allowed upon completion of installation (2024 IRC R908.3)
  • Roof replacement (tear-off to the deck) required where the existing roof is water-soaked/deteriorated, is wood shake/slate/clay/cement/asbestos-cement tile, or already has two or more layers
  • A Final Roof inspection is required; mid-roof inspections are NOT required on residential re-roof projects per SAFEbuilt's guide, though the Building Department may require one depending on material/scope
  • Homeowner self-installation is permitted

Required documents

  • RequiredBuilding Permit Application (re-roof scope)

Fee schedule

Fee typeAmountNotes
Roof (re-shingle) — Single Stop Project$60.00Exhibit B — Fee Schedule for Services, Single Stop Projects Fee Schedule

Accessory Structure Permit (incl. Accessory Dwelling / Structures)

Covers accessory structures in Ault (garages, sheds, accessory buildings, and similar), reviewed under 2024 IRC Accessory Structures provisions per SAFEbuilt's Building Guide for Homeowners. No dedicated Ault-specific ADU (accessory dwelling unit) zoning/permit process distinct from a general accessory structure was found published; treated here as the closest genuinely-applicable permit type.

Reviewed 2026-07-06 · Source

Requirements

  • Building permit application and applicable Residential Application Check List submittal items scaled to the accessory structure's size/use
  • Structural plans required if the structure includes site-built framing beyond a prefabricated/pre-engineered shed
  • Electrical plans required if the structure will be wired

Required documents

  • RequiredBuilding Permit Application
  • Optional2024 IRC Accessory Structures Guide (SAFEbuilt)General homeowner guide to accessory structure code requirements

Fee schedule

Fee typeAmountNotes
Building Permit Fee (1997 UBC Table 1-A valuation-based schedule)$23.00 minimum, scaling per Exhibit B valuation tiersNo accessory-structure-specific flat fee is published; billed under the general valuation-based table

Demolition Permit

Verified

Required for demolition of structures within Ault town limits. Billed as a flat 'Single Stop Project' fee.

Verified 2026-07-06 · Source

Requirements

  • Completed building permit application describing the structure(s) to be demolished

Required documents

  • RequiredBuilding Permit Application (demolition scope)

Fee schedule

Fee typeAmountNotes
Demolition — Single Stop Project$50.00Exhibit B — Fee Schedule for Services, Single Stop Projects Fee Schedule; exempt from the valuation-based table

Commercial Tenant Finish / Remodel Permit

Verified

Required for commercial tenant finish and remodel work in Ault. Reviewed by SAFEbuilt Colorado under the 2024 International Codes per the Town's Commercial Tenant Finish/Remodel Plan Submittal Procedure.

Verified 2026-07-06 · Source

Requirements

  • Building permit application giving project description, square footage, total project valuation and electrical valuation, use of surrounding spaces, type of construction, and occupancy group
  • One electronic set of: architectural plans (stamped by a Colorado-licensed architect or engineer, including floor plan, wall section details, building section, fire-rating details, code summary); structural plans (stamped, if structural changes such as bearing wall removal are involved); electrical plans (stamped; load calculations, one-line diagrams, and fault current analysis required for added circuits/service upgrades/emergency lighting); mechanical/plumbing plans (stamped, if HVAC or plumbing systems are changed)
  • For restaurants/commercial kitchens specifically: grease interceptor sizing per adopted Plumbing Code where applicable; fire sprinkler system if serving liquor and over 5,000 sq ft; Type I/Type II hood requirements per equipment; two exits (not through kitchen/storage) for occupant load 50+; Health Department (Weld or Larimer County) approval required before final inspection/Certificate of Occupancy; seating plan for dining areas
  • All plan sheets must bear the original seal of a Colorado-licensed architect or engineer unless exempted under section 12-4-112 C.R.S.

Required documents

  • RequiredBuilding Permit Application (commercial tenant finish/remodel scope)
  • RequiredCommercial Tenant Finish/Remodel Plan Submittal Procedure (SAFEbuilt, 2024 International Codes)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (1997 UBC Table 1-A valuation-based schedule)$23.00 minimum, scaling per Exhibit B valuation tiersExhibit B — Fee Schedule for Services
Plan Review Fee — Small Remodel and Commercial Projects30% of Building Permit FeePer Exhibit B plan review fee schedule
Plan Review Fee — Multi-Family and Commercial Projects (larger scope)65% of Building Permit FeePer Exhibit B; applies to larger commercial projects distinct from small remodels

Deck / Covered Patio Permit

Required for deck and patio-cover/carport construction in Ault, reviewed under 2024 IRC provisions per SAFEbuilt's Building Guides for Homeowners (separate Decks Guide and Patio Covers/Carports Guide).

Reviewed 2026-07-06 · Source

Requirements

  • Building permit application describing the deck/patio cover scope
  • Plot plan showing distance from the proposed structure to property lines and existing structures
  • Structural plans/details for decks and patio covers per the applicable SAFEbuilt homeowner guide

Required documents

  • RequiredBuilding Permit Application (deck/patio cover scope)
  • Optional2024 IRC Decks Guide (SAFEbuilt)
  • Optional2024 IRC Patio Covers/Carports Guide (SAFEbuilt)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (1997 UBC Table 1-A valuation-based schedule)$23.00 minimum, scaling per Exhibit B valuation tiersNo deck/patio-specific flat fee is published; billed under the general valuation-based table

Furnace / Water Heater Replacement Permit

Verified

Straightforward like-for-like replacement of a furnace, air conditioner, or water heater in Ault, billed as a flat 'Single Stop Project' fee distinct from the valuation-based table.

Verified 2026-07-06 · Source

Requirements

  • Completed building permit application describing the replacement equipment

Required documents

  • RequiredBuilding Permit Application (single-stop replacement scope)

Fee schedule

Fee typeAmountNotes
Furnace/Air Conditioner — Single Stop Project$70.00Exhibit B — Fee Schedule for Services, Single Stop Projects Fee Schedule
Water Heater — Single Stop Project$60.00Exhibit B — Fee Schedule for Services, Single Stop Projects Fee Schedule

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ault building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/weld-county/ault/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 611ef0b

Reproducible from PermitBase’s version-controlled dataset, commit 611ef0b.