Version history — Ault, Colorado
This is PermitBase’s own verified record for Ault, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Ault’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-20Superseded
- 2026-08-13Superseded
- Ault, Colorado — Sign Permit record added
- Ault, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
- Ault, Colorado — Change of Use / Certificate of Occupancy Permit record added
- 2026-07-23Superseded
- Ault, Colorado — adopted-codes record updated
- 2026-07-20Superseded
- Ault, Colorado — EV Charger / EVSE Permit record added
- Ault, Colorado — Solar Photovoltaic (PV) Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Ault began