This is PermitBase’s published record for Firestone as of 2026-08-02. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Firestone building permits
VerifiedFirestone, Colorado — as published 2026-08-02.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family homes and similar new residential construction in Firestone. Reviewed under the 2018 IRC/IBC as locally amended by Ordinance No. 1029 (the 'Firestone Building and Construction Code'). Plan review/permit administration is handled by Town of Firestone Building Division staff; inspections are performed by SAFEbuilt Colorado under contract.
Verified 2026-07-06 · Source
Requirements
- Plans must comply with the 2018 IRC/IBC as adopted and locally amended by Ordinance No. 1029
- Submittal for residential permits: plans including a site plan, plus the applicable Town Building Guide if the project type has one
- Valuation is determined by square footage and average construction costs per the Town's own fee schedule methodology
- Application submitted via the online portal at citizenserve.com/firestoneco
- A Footing/Foundation Permit for commercial projects only carries an additional flat fee ($2,000 plus $100/hour) for full submittal — not applicable to single-family residential
Required documents
- RequiredBuilding Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
- RequiredSite PlanShowing lot dimensions, existing structures, and utility line locations
- RequiredConstruction Plans / Building Guide SubmittalFull plan set; for common project types the Town's own Building Guide (a Colorado Chapter ICC template) may be used as the basic plan submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1 to $2,000 | $80 | Town of Firestone Building Division Fee Schedule (REV 01.2025); valuation is determined by square footage and average construction costs |
| Building Permit Fee — valuation $2,001 to $25,000 | $80 for the first $2,000 plus $15.00 for each additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $100,001 to $500,000 | $1,075 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $5,000,001 and over | $20,175 for the first $5,000,000 plus $3.50 for each additional $1,000 or fraction thereof | — |
| Plan Review Fee | 65% of the Building Permit Fee | — |
| Multifamily / Single-Family Attached unit fee | $475.00 per unit, in addition to the base Building Permit Fee | — |
| Administration Fee: New Single Family Detached / Master Plan | $125.00 | — |
Residential Addition / Remodel Permit
VerifiedRequired for additions, basement finishes, and remodels involving structural changes in Firestone. Reviewed under the 2018 IRC as locally amended. Basement Finish/Remodel and Addition are both explicitly listed among the Town's permits requiring plan review.
Verified 2026-07-06 · Source
Requirements
- Basement Finish/Remodel and Addition are explicitly listed as requiring plan review on the Town's own fee schedule
- One-Story Addition, Basement Finish, and Detached Garage each have a dedicated Town Building Guide (2018 IRC-based, Colorado Chapter ICC template) covering plan submittal basics: smoke/CO alarm requirements, safety glazing at specified locations, heating in all habitable rooms, and electrical service capacity disclosure
- Window/Door Replacement requiring structural changes also requires plan review (versus the flat-fee non-structural window/door replacement permit)
- A plot/site plan showing dimensions, relationship to existing structures, and utility line locations (electric, gas, sewer, water) is required — Public Service Utility Notification Center of Colorado (1-800-922-1987) can locate underground utility lines
Required documents
- RequiredBuilding Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
- RequiredSite PlanShowing lot dimensions, existing/proposed structures, and utility line locations
- RequiredFloor Plan and Building SectionPer the applicable Town Building Guide (framing member sizes/spacing, insulation values, foundation detail)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based table as new construction) | $80 minimum, scaling per the valuation tiers | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
| Plan Review Fee | 65% of the Building Permit Fee | — |
| Administration Fee: Residential All Other | $25.00 | — |
Electrical Permit
VerifiedRequired for electrical modifications, service upgrades, and panel/meter work in Firestone. Governed by the 2023 NEC as locally adopted. Residential electrical permits are billed on a distinct area-based fee schedule; several standalone electrical items (temporary construction meter, service replacement, mobile home electrical set) carry flat fees.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2023 NEC as adopted by reference via Ordinance No. 1029
- A plan review fee of 65% may be required for electrical permits, per the Electrical Permit Fee Table
- Complex electrical systems (health-care facility circuits under NEC Article 517, installations over 1000V, or hazardous-classified locations) require a registered design professional's Electrical Observation with a signed Certificate of Compliance, per Ordinance No. 1029 Section 1704.7 — in addition to standard Building Division/SAFEbuilt inspections
- Electrical fees are pegged to the US Dept of Labor consumer price index for Denver-Aurora-Lakewood and adjust annually per Colorado HB 19-1035
Required documents
- RequiredElectrical Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Electrical Permit — not more than 1,000 sq ft | $141.20 | Town of Firestone Building Division Fee Schedule (REV 01.2025), verified against the rendered PDF page image |
| Residential Electrical Permit — 1,001 to 1,500 sq ft | $211.80 | — |
| Residential Electrical Permit — 1,501 to 2,000 sq ft | $282.40 | — |
| Residential Electrical Permit — each additional 100 sq ft over 2,000 sq ft | $282.40 plus $14.12 per 100 sq ft | — |
| Temporary Construction Meter 100A-200A 1 Phase | $141.20 | — |
| Electrical Service Replacement 100A-200A 1 Phase | $141.20 | — |
| Electrical Mobile/Modular/Manufactured Home Set | $141.20 | — |
| Solar Install Electrical Permit (residential) | Maximum $500 | — |
| Reinspection Fee | $75.00 progressive (24-hour inspection delay) | — |
Plumbing Permit
VerifiedRequired for plumbing modifications, backflow preventers, water heater replacement, and new gas lines in Firestone. Governed by the 2018 IPC and IFGC as locally adopted.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2018 IPC and IFGC as adopted by reference via Ordinance No. 1029
- Backflow Preventer (commercial and residential) is a distinct flat-fee permit item
- Residential Water Heater Replacement (tank style only, electric or gas) is a distinct flat-fee permit item
- New Gas Lines and Tankless Water Heater/New Gas Piping are explicitly listed among permits requiring plan review (versus the flat-fee tank-style water heater replacement)
- Gas Load Form guide available on the Town's Building Guides page for gas-line sizing calculations
Required documents
- RequiredPlumbing Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
- OptionalGas Load FormRequired for new gas line/gas piping work to size the line per the Town's Gas Load Form guide
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Water Heater Replacement (Tank Style Only, Electric or Gas) | $141.20 | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
| Backflow Preventer / Residential | $100.00 | — |
| Backflow Preventer / Commercial | $225.00 | — |
| Building/Plumbing Permit Fee (general Valuation Chart, for plan-review items like new gas lines/tankless water heaters) | $80 minimum, scaling per valuation tiers | No separate flat fee found published for new gas line/tankless water heater installs beyond plan-review categorization; billed under the general Valuation Chart plus 65% plan review fee |
| Reinspection Fee | $75.00 progressive (24-hour inspection delay) | — |
Mechanical / HVAC Permit
VerifiedRequired for furnace, A/C, and related HVAC equipment installation or replacement in Firestone. Governed by the 2018 IMC and IFGC as locally adopted.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2018 IMC and IFGC as adopted by reference via Ordinance No. 1029
- Residential A/C and/or Furnace Replacement is a distinct flat-fee permit item
- New A/C installation additionally requires a companion Residential New A/C Electrical Fee (for the associated electrical disconnect/circuit work) on top of the A/C mechanical fee itself
- Complex mechanical systems (per Ordinance No. 1029 Section 1704.8) may require a registered design professional's Mechanical Observation with a signed report, in addition to standard inspections
Required documents
- RequiredMechanical Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential A/C and/or Furnace Replacement | $132.00 | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
| Residential New A/C Electrical Fee plus A/C Fee | $141.20 (electrical portion, in addition to the $132.00 A/C mechanical fee) | — |
| Reinspection Fee | $75.00 progressive (24-hour inspection delay) | — |
Roofing Permit (Reroof)
VerifiedRequired for re-roofing in Firestone. Governed by 2018 IRC roofing provisions with a dedicated Town-published Reroof Requirements guide (REV 8.11.23) covering asphalt shingle re-roofing specifics.
Verified 2026-07-06 · Source
Requirements
- Shingle repair or replacement not exceeding 100 sq ft (one square) of covering per building is exempt from permit, per Ordinance No. 1029's amendment to IBC Section 105.2 item 14
- Where the existing roof already has two or more layers of any roof covering, all old material must be removed — roof re-cover (overlay) is NOT allowed in that case (IRC R908.3.1.1)
- Ice barrier is required, extending from the lowest roof edges to at least 24 inches inside the exterior wall line (IRC R905.1.2)
- Asphalt shingles must be fastened to solidly sheathed decks (R905.2.1); minimum 2:12 (17%) slope required for asphalt shingles (R905.2.2)
- Drip edge required on all edges including rakes, minimum 2-inch overlap (R905.2.8.5); double underlayment required for 2:12 up to 4:12 slopes (Table R905.1.1(2))
- Sidewalls must be step-flashed; continuous flashing at sidewalls is not acceptable (R905.2.8.3)
- Roofing material must be rated for 115 mph sustained wind per IRC Table R301.2(1).1 / Table R905.2.4.1
- Homeowners may pull the roof permit without a contractor's license only if the house is their primary residence and no contractor performs the work
- OSHA-approved ladders required for inspection access to the roof; telescoping ladders are NOT acceptable
Required documents
- RequiredRoofing Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Re-Roof - Shingle | $132.00 | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
| Residential Re-Siding | $132.00 | Listed on the same fee line as re-roofing in the Miscellaneous Permits table |
| Reinspection Fee | $75.00 progressive (24-hour inspection delay) | — |
Solar PV Permit
VerifiedRequired for solar panel installation in Firestone. Governed by the 2018 IBC/IRC and 2023 NEC as locally adopted. The Town publishes a dedicated 'PV Solar Detach-Reset Process' guide for re-roofing under existing solar arrays, and solar installs carry a capped electrical permit fee distinct from the general residential electrical fee table.
Verified 2026-07-06 · Source
Requirements
- Solar Install Electrical Permit fee is capped at a maximum of $500 for residential and $1,000 for commercial, regardless of system size, per the Electrical Permit Fee Table
- A dedicated 'PV Solar Detach-Reset Process' guide governs the process for detaching and resetting solar panels (e.g., to allow a reroof underneath an existing array) — available on the Town's Building Guides page
- Governed by the 2023 NEC as locally adopted for electrical scope, and 2018 IBC/IRC for structural/roof-mounting scope
Required documents
- RequiredSolar/PV Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
- OptionalPV Solar Detach-Reset Process DocumentationRequired when detaching/resetting an existing solar array (e.g., for a reroof underneath it)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Install Electrical Permit (residential) | Maximum $500 | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
| Solar Install Electrical Permit (commercial) | Maximum $1,000 | — |
Demolition Permit
VerifiedRequired for residential demolition in Firestone, listed as a distinct flat-fee permit item on the Town's Building Division Fee Schedule.
Verified 2026-07-06 · Source
Requirements
- Residential Demolition Permit is a distinct flat-fee line item on the Town's Building Division Fee Schedule
- No demolition-specific plan-review requirement was found published beyond the standard permit application
Required documents
- RequiredDemolition Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Demolition Permit | $132.00 | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
Fence Permit
VerifiedRequired for residential fences under 6 feet in Firestone, listed as a distinct flat-fee permit item. No published guide or fee was found specifically for retaining walls, so this entry is scoped to fences only, per the genuinely-sourced fee schedule line item.
Verified 2026-07-06 · Source
Requirements
- Residential Fence <6' is a distinct flat-fee line item on the Town's Building Division Fee Schedule
- No specific published requirement was found for fences 6 feet or taller, or for retaining walls, on the Town's own site during this extraction — do not assume the same flat fee applies to taller fences or retaining walls without confirming with the Building Division
Required documents
- RequiredFence Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Fence <6' | $132.00 | Town of Firestone Building Division Fee Schedule (REV 01.2025) |
EV Charger / Energy Storage System (ESS) Permit
VerifiedFirestone publishes a dedicated 'Firestone Single Family EV Car Charger and/or Energy Storage System' requirements guide (Rev 3.26.2024), distinct from its general Building Guides. New residential EV charging systems and/or energy storage systems use an 'RES inspection type' for all inspections, with specific plan-review submittal items, a 2023-code local amendment requiring a heat detector interconnected to the home's smoke detector system when an attached garage has an EV charger (per NFPA 70 Article 625), and detailed ESS placement/energy-rating rules (IRC Section R327, locally amended). Billed under the same area-based Residential Electrical Permit fee table documented in the electrical-permit entry — no distinct EV/ESS fee line was found on the Fee Schedule.
Verified 2026-07-20 · Source
Requirements
- Submit for plan review: (1) an electrical load calculation for the existing electrical panel, (2) specification documentation for the equipment to be installed, (3) a floor plan showing the location of the proposed equipment and the interconnected heat detector, and (4) a wiring diagram indicating point of connection, overcurrent protection, and wiring sizes/methods
- Firestone 2023 Code Amendment to IRC R314.2.3: when an attached garage has an EV Power Transfer System car charger installed per NFPA 70 Article 625, a heat detector shall be wired to the home's smoke detector system
- ESS-specific rules (IRC Section R327, as locally amended): ESS must be listed/labeled per UL 9540 (exempt if listed for residential use and under 1 kWh); individual units maximum 20 kWh; aggregate ratings capped at 40 kWh in utility closets/basements/storage, 80 kWh in garages/exterior walls/outdoors on the ground; minimum 3-foot separation between individual units; specific allowed locations (detached garages/accessory structures, attached garages on exterior walls only, or outdoors 3+ feet from doors/windows) with ESS prohibited in sleeping rooms or closets/spaces opening into sleeping rooms
- Garage walls/ceilings require minimum 5/8-inch Type X gypsum board per Firestone's amended IRC Table R302.6 dwelling-garage separation table
- Firestone-reviewed, stamped plans (printed from the online portal) and the permit card MUST be on-site for every required inspection — no inspection will be made without these
- A document on company letterhead, signed by the master electrician, confirming all lugs and terminals were torqued to manufacturer specifications is required at inspection
Required documents
- RequiredFirestone Single Family EV Car Charger and/or Energy Storage System (Building Guide, Rev 3.26.2024)Town of Firestone's dedicated EV/ESS requirements document: plan-review submittal checklist, 2023 code amendments (heat detector interconnection, ESS locations/energy ratings/spacing), and inspection checklist
- RequiredElectrical Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco, same portal used for the general electrical-permit entry
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Electrical Permit fee applies (area-based; no distinct EV/ESS line) | $141.20 (not more than 1,000 sq ft) to $282.40 (1,501-2,000 sq ft), plus $14.12 per additional 100 sq ft over 2,000 sq ft — same area-based table as the electrical-permit entry | Town of Firestone Building Division Fee Schedule (REV 01.2025); no separate EV charger or ESS fee line item was found on the fee schedule — EV/ESS installation is billed under the same Residential Electrical Permit table |
Commercial Building Permit (New Construction / Additions)
VerifiedRequired for new commercial buildings and additions thereto in Firestone. Reviewed under the 2018 IBC as locally amended by Ordinance No. 1029 (the 'Firestone Building and Construction Code'), with the 2023 NEC for electrical scope. Firestone publishes a dedicated Commercial Permit Submittal Checklist (REV 03.25) distinct from residential submittals, and a separate 2026 Non-Residential Fees sheet covering water tap, impact, and use-tax charges layered on top of the standard valuation-based Building Permit Fee. All plans must be stamped by a Colorado Licensed Architect and Colorado Registered Engineers. Plan review/permit administration is by Town staff; inspections are performed by SAFEbuilt Colorado under contract.
Verified 2026-08-02 · Source
Requirements
- All plans, specifications, and calculations must be stamped by their respective design professionals (Colorado Licensed Architect and Colorado Registered Engineers), per the Commercial Permit Submittal Checklist (REV 03.25)
- All General, Mechanical, Plumbing, Electrical, and Sub-Contractors must be listed on the permit application AND licensed with the Town of Firestone as a condition of permit issuance
- Total building valuation must be provided in addition to the total electrical valuation; detailed bids may be required if the Building Official deems valuations inaccurate for the proposed scope
- Site-specific soils report required; structural design criteria must include ALL information required by 2018 IBC 1603 (wind speed/exposure, snow loads, seismic design category, soil-bearing data from a geotechnical engineer, etc.)
- Civil package required: dimensioned site plans, grading and drainage plans, utility plans, and accessibility plans/details
- Architectural code analysis required covering occupancy classification, construction type, sprinkler/fire alarm status, allowable height/stories/area, egress, accessibility (IBC Ch. 11), energy code compliance path, and life safety/egress plans per IBC 107.2.3
- IECC compliance path documentation prepared by the designing Architect
- Separate submittals must be made to the Frederick-Firestone Fire Protection District (Steve Iacino, Asst. Chief of Planning, 303-833-2742 / 720-526-6583) and St. Vrain Sanitation District (303-776-9570) — multi-family and all commercial projects require fire district approval
- Sewer tap receipt from St. Vrain Sanitation required at time of permit submittal for new commercial; receipts from Little Thompson or Left Hand Water District required if the project is in those districts
- Kitchen hoods, woodworking dust-collection systems, and spray/paint booths require additional engineered plans/shop drawings, with paint booth plans submitted to both the Fire Department and Building Department
Required documents
- RequiredBuilding Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco with all contractors listed and Town-licensed
- RequiredCommercial Permit Submittal Checklist packageFull stamped plan set per the Town's checklist: civil package, structural (IBC 1603 design criteria, foundations, framing), architectural code analysis and life-safety/egress plans, mechanical, electrical (one-line diagram, fault current and load calculations), and plumbing plans
- RequiredSoils Report (Site Specific)Prepared by a geotechnical engineer; soil-bearing data must be based on it
- RequiredComplete project manual(s)From the design team
- RequiredIECC compliance path documentationPrepared by the designing Architect
- RequiredSewer tap receipt (St. Vrain Sanitation)Proof of sewer tap purchase is required at time of permit submittal for new commercial and multi-family
- OptionalWater district receiptFrom Little Thompson Water District or Left Hand Water District, for new commercial located in those districts
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | $80 (valuation $1-$2,000) scaling by tier to $20,175 for the first $5,000,000 plus $3.50 per additional $1,000 or fraction thereof | Building Division Fee Schedule (REV 01.2025); the 2026 Non-Residential Fees sheet explicitly defers building permit, plan review, electrical, construction meter, and backflow fees to this schedule. Final valuation is determined by square footage and average construction costs |
| Plan Review Fee | 65% of the Building Permit Fee | Required to be paid at time of submittal, per the 2026 Non-Residential Fees sheet |
| Administration Fee: Commercial | $150.00 | — |
| Commercial Electrical Permit Fee | $141.20 (electrical valuation under $2,000); $141.20 plus $14.12 per $1,000 or fraction thereof at $2,001 and above | CPI-indexed annually (Denver-Aurora-Lakewood) per Colorado HB 19-1035 |
| Footing/Foundation Permit (Commercial Projects Only) | $2,000.00 | Optional early-start foundation permit; additional fees for full submittal will apply |
| Use Tax | 2.6% of half the valuation total | 2026 Non-Residential Fees sheet |
| Impact Fees (per 1,000 sq ft) | $2,103.54 Industrial; $7,994.83 Commercial; $4,571.96 Office & Other Services; $4,378.21 Institutional | Transportation + Municipal Facilities components, per the 2026 Non-Residential Fees sheet (1/1/2026) |
| Water Tap (SVW) | $25,004.00 (5/8") to $200,032.00 (2"); 3" or larger as determined by Board of Trustees | Plus meter fee, e.g. $713.77 (5/8") to $3,716.00 (2" commercial). For CWCWD fees email building@firestoneco.gov |
| Backflow Preventer / Commercial | $225.00 | — |
| Temporary Certificate of Occupancy | $750.00 | $400 of that fee is refunded if the final CO is issued prior to the TCO expiration date |
| Reinspection Fee | $75.00 progressive (24-hour inspection delay) | — |
Commercial Tenant Finish (Tenant Improvement) Permit
VerifiedRequired for tenant finishes in existing commercial buildings in Firestone. Genuinely distinct from the new-commercial process: the Town publishes a separate 'Commercial Tenant Finish Permit Submittal Checklist' (REV 04.24) with its own scope — no civil package or soils report required, structural documentation only if applicable, change-of-occupancy analysis when the use changes, and energy code documentation typically only for previously unoccupied shell spaces. Plans must still be stamped by a Colorado Licensed Architect and Colorado Registered Engineers, and separate submittals to the Frederick-Firestone Fire District and St. Vrain Sanitation District are still required. Fees run through the same valuation-based Building Permit Fee Table — there is no distinct TI fee line.
Verified 2026-08-02 · Source
Requirements
- Electronic documents required as PDF attachments via the online portal; incomplete submittals will be rejected; all submittals are reviewed in the order received (per the TI checklist, REV 04.24)
- All plans, specifications, and calculations stamped by their respective design professionals (Colorado Licensed Architect and Colorado Registered Engineers)
- All General, Mechanical, Plumbing, and Electrical Contractors listed on the permit application; total building valuation plus total electrical valuation provided (detailed bids may be required if the Building Official deems valuations inaccurate)
- Architectural code analysis including change-of-occupancy analysis (if applicable), occupancy classification, sprinkler/fire alarm status, egress, accessibility (IBC Ch. 11), and life safety/egress plans per IBC 107.2.3
- IECC/energy code compliance documentation only if applicable — typically for a previously unoccupied shell space
- Structural package (IBC 1603 design criteria, foundations, framing) required only IF APPLICABLE to the TI scope
- Electrical one-line diagram required only with a service upgrade or when substantial load is added to the existing system; electrical site plan only if exterior electrical equipment is added, moved, or removed
- Kitchen hoods require manufacturer's shop drawings; spray/paint booths require engineered plans submitted to both the Fire Department and Building Department
- Separate submittals must be made to the Frederick-Firestone Fire District and St. Vrain Sanitation District
Required documents
- RequiredPermit Application (Online Portal)Submitted via citizenserve.com/firestoneco with all contractors listed; electronic PDF attachments required
- RequiredTenant Finish plan set per the TI Submittal ChecklistStamped architectural package (code analysis, life-safety/egress plans, floor plans for affected levels, reflected ceiling plans, wall assemblies), plus mechanical, electrical, and plumbing plans for the affected scope
- RequiredComplete project manual(s)From the design team
- OptionalChange of occupancy analysisRequired if the tenant finish changes the occupancy classification
- OptionalStructural plans and calculationsOnly if applicable to the TI scope (marked '**if applicable**' on the Town's checklist)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based; no distinct TI fee line) | $80 (valuation $1-$2,000) scaling by tier, e.g. $1,075 for the first $100,000 plus $6.50 per additional $1,000 up to $500,000 | Building Division Fee Schedule (REV 01.2025); no separate tenant-finish fee line item exists — TI permits are billed under the same valuation table as other building permits |
| Plan Review Fee | 65% of the Building Permit Fee | Required to be paid at time of submittal per the 2026 Non-Residential Fees sheet |
| Administration Fee: Commercial | $150.00 | — |
| Commercial Electrical Permit Fee | $141.20 (electrical valuation under $2,000); $141.20 plus $14.12 per $1,000 or fraction thereof at $2,001 and above | — |
| Use Tax | 2.6% of half the valuation total | 2026 Non-Residential Fees sheet |
| Temporary Certificate of Occupancy | $750.00 | $400 refunded if the final CO is issued prior to the TCO expiration date |
| Reinspection Fee | $75.00 progressive (24-hour inspection delay) | — |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Firestone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.