You are viewing the permanent link for the record currently in effect, published 2026-08-13.

Firestone building permits

Firestone, Colorado — as published 2026-08-13.

Reviewed 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/93872018 International Residential Code (IRC), adopted by reference and locally amended2018 International Plumbing Code (IPC)2018 International Mechanical Code (IMC)2018 International Existing Building Code (IEBC)2018 International Fuel Gas Code (IFGC)2018 International Property Maintenance Code (IPMC)2018 International Swimming Pool and Spa Code (ISPSC)2018 International Energy Conservation Code (IECC)2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32)2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC)Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family homes and similar new residential construction in Firestone. Reviewed under the 2018 IRC/IBC as locally amended by Ordinance No. 1029 (the 'Firestone Building and Construction Code'). Plan review/permit administration is handled by Town of Firestone Building Division staff; inspections are performed by SAFEbuilt Colorado under contract.

Verified 2026-07-06 · Source

Requirements

  • Plans must comply with the 2018 IRC/IBC as adopted and locally amended by Ordinance No. 1029
  • Submittal for residential permits: plans including a site plan, plus the applicable Town Building Guide if the project type has one
  • Valuation is determined by square footage and average construction costs per the Town's own fee schedule methodology
  • Application submitted via the online portal at citizenserve.com/firestoneco
  • A Footing/Foundation Permit for commercial projects only carries an additional flat fee ($2,000 plus $100/hour) for full submittal — not applicable to single-family residential

Required documents

  • RequiredBuilding Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
  • RequiredSite PlanShowing lot dimensions, existing structures, and utility line locations
  • RequiredConstruction Plans / Building Guide SubmittalFull plan set; for common project types the Town's own Building Guide (a Colorado Chapter ICC template) may be used as the basic plan submittal

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $2,000$80Town of Firestone Building Division Fee Schedule (REV 01.2025); valuation is determined by square footage and average construction costs
Building Permit Fee — valuation $2,001 to $25,000$80 for the first $2,000 plus $15.00 for each additional $1,000 or fraction thereofTown of Firestone Building Division Fee Schedule (REV 01.2025), Building Permit Fee Table
Building Permit Fee — valuation $100,001 to $500,000$1,075 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereofTown of Firestone Building Division Fee Schedule (REV 01.2025), Building Permit Fee Table
Building Permit Fee — valuation $5,000,001 and over$20,175 for the first $5,000,000 plus $3.50 for each additional $1,000 or fraction thereofTown of Firestone Building Division Fee Schedule (REV 01.2025), Building Permit Fee Table
Plan Review Fee65% of the Building Permit FeeTown of Firestone Building Division Fee Schedule (REV 01.2025), Plan Review Fee for Building Permits
Multifamily / Single-Family Attached unit fee$475.00 per unit, in addition to the base Building Permit FeeTown of Firestone Building Division Fee Schedule (REV 01.2025), Building Permit Fee Table, Multifamily / Single Family Attached footnote
Administration Fee: New Single Family Detached / Master Plan$125.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Residential Addition / Remodel Permit

Verified

Required for additions, basement finishes, and remodels involving structural changes in Firestone. Reviewed under the 2018 IRC as locally amended. Basement Finish/Remodel and Addition are both explicitly listed among the Town's permits requiring plan review.

Verified 2026-07-06 · Source

Requirements

  • Basement Finish/Remodel and Addition are explicitly listed as requiring plan review on the Town's own fee schedule
  • One-Story Addition, Basement Finish, and Detached Garage each have a dedicated Town Building Guide (2018 IRC-based, Colorado Chapter ICC template) covering plan submittal basics: smoke/CO alarm requirements, safety glazing at specified locations, heating in all habitable rooms, and electrical service capacity disclosure
  • Window/Door Replacement requiring structural changes also requires plan review (versus the flat-fee non-structural window/door replacement permit)
  • A plot/site plan showing dimensions, relationship to existing structures, and utility line locations (electric, gas, sewer, water) is required — Public Service Utility Notification Center of Colorado (1-800-922-1987) can locate underground utility lines

Required documents

  • RequiredBuilding Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
  • RequiredSite PlanShowing lot dimensions, existing/proposed structures, and utility line locations
  • RequiredFloor Plan and Building SectionPer the applicable Town Building Guide (framing member sizes/spacing, insulation values, foundation detail)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based table as new construction)$80 minimum, scaling per the valuation tiersTown of Firestone Building Division Fee Schedule (REV 01.2025)
Plan Review Fee65% of the Building Permit FeeTown of Firestone Building Division Fee Schedule (REV 01.2025), Plan Review Fee for Building Permits
Administration Fee: Residential All Other$25.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Electrical Permit

Verified

Required for electrical modifications, service upgrades, and panel/meter work in Firestone. Governed by the 2023 NEC as locally adopted. Residential electrical permits are billed on a distinct area-based fee schedule; several standalone electrical items (temporary construction meter, service replacement, mobile home electrical set) carry flat fees.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2023 NEC as adopted by reference via Ordinance No. 1029
  • A plan review fee of 65% may be required for electrical permits, per the Electrical Permit Fee Table
  • Complex electrical systems (health-care facility circuits under NEC Article 517, installations over 1000V, or hazardous-classified locations) require a registered design professional's Electrical Observation with a signed Certificate of Compliance, per Ordinance No. 1029 Section 1704.7 — in addition to standard Building Division/SAFEbuilt inspections
  • Electrical fees are pegged to the US Dept of Labor consumer price index for Denver-Aurora-Lakewood and adjust annually per Colorado HB 19-1035

Required documents

  • RequiredElectrical Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco

Fee schedule

Fee typeAmountNotes
Residential Electrical Permit — not more than 1,000 sq ft$141.20Town of Firestone Building Division Fee Schedule (REV 01.2025), verified against the rendered PDF page image
Residential Electrical Permit — 1,001 to 1,500 sq ft$211.80Town of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table (Residential Fees)
Residential Electrical Permit — 1,501 to 2,000 sq ft$282.40Town of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table (Residential Fees)
Residential Electrical Permit — each additional 100 sq ft over 2,000 sq ft$282.40 plus $14.12 per 100 sq ftTown of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table (Residential Fees)
Temporary Construction Meter 100A-200A 1 Phase$141.20Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Electrical Service Replacement 100A-200A 1 Phase$141.20Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Electrical Mobile/Modular/Manufactured Home Set$141.20Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Solar Install Electrical Permit (residential)Maximum $500Town of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table, Solar Install Electrical Permit footnote
Reinspection Fee$75.00 progressive (24-hour inspection delay)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Plumbing Permit

Verified

Required for plumbing modifications, backflow preventers, water heater replacement, and new gas lines in Firestone. Governed by the 2018 IPC and IFGC as locally adopted.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IPC and IFGC as adopted by reference via Ordinance No. 1029
  • Backflow Preventer (commercial and residential) is a distinct flat-fee permit item
  • Residential Water Heater Replacement (tank style only, electric or gas) is a distinct flat-fee permit item
  • New Gas Lines and Tankless Water Heater/New Gas Piping are explicitly listed among permits requiring plan review (versus the flat-fee tank-style water heater replacement)
  • Gas Load Form guide available on the Town's Building Guides page for gas-line sizing calculations

Required documents

  • RequiredPlumbing Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
  • OptionalGas Load FormRequired for new gas line/gas piping work to size the line per the Town's Gas Load Form guide

Fee schedule

Fee typeAmountNotes
Residential Water Heater Replacement (Tank Style Only, Electric or Gas)$141.20Town of Firestone Building Division Fee Schedule (REV 01.2025)
Backflow Preventer / Residential$100.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Backflow Preventer / Commercial$225.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Building/Plumbing Permit Fee (general Valuation Chart, for plan-review items like new gas lines/tankless water heaters)$80 minimum, scaling per valuation tiersNo separate flat fee found published for new gas line/tankless water heater installs beyond plan-review categorization; billed under the general Valuation Chart plus 65% plan review fee
Reinspection Fee$75.00 progressive (24-hour inspection delay)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Mechanical / HVAC Permit

Verified

Required for furnace, A/C, and related HVAC equipment installation or replacement in Firestone. Governed by the 2018 IMC and IFGC as locally adopted.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IMC and IFGC as adopted by reference via Ordinance No. 1029
  • Residential A/C and/or Furnace Replacement is a distinct flat-fee permit item
  • New A/C installation additionally requires a companion Residential New A/C Electrical Fee (for the associated electrical disconnect/circuit work) on top of the A/C mechanical fee itself
  • Complex mechanical systems (per Ordinance No. 1029 Section 1704.8) may require a registered design professional's Mechanical Observation with a signed report, in addition to standard inspections

Required documents

  • RequiredMechanical Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco

Fee schedule

Fee typeAmountNotes
Residential A/C and/or Furnace Replacement$132.00Town of Firestone Building Division Fee Schedule (REV 01.2025)
Residential New A/C Electrical Fee plus A/C Fee$141.20 (electrical portion, in addition to the $132.00 A/C mechanical fee)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table; the $132.00 A/C portion is the Residential A/C and/or Furnace Replacement line in the same table
Reinspection Fee$75.00 progressive (24-hour inspection delay)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Roofing Permit (Reroof)

Verified

Required for re-roofing in Firestone. Governed by 2018 IRC roofing provisions with a dedicated Town-published Reroof Requirements guide (REV 8.11.23) covering asphalt shingle re-roofing specifics.

Verified 2026-07-06 · Source

Requirements

  • Shingle repair or replacement not exceeding 100 sq ft (one square) of covering per building is exempt from permit, per Ordinance No. 1029's amendment to IBC Section 105.2 item 14
  • Where the existing roof already has two or more layers of any roof covering, all old material must be removed — roof re-cover (overlay) is NOT allowed in that case (IRC R908.3.1.1)
  • Ice barrier is required, extending from the lowest roof edges to at least 24 inches inside the exterior wall line (IRC R905.1.2)
  • Asphalt shingles must be fastened to solidly sheathed decks (R905.2.1); minimum 2:12 (17%) slope required for asphalt shingles (R905.2.2)
  • Drip edge required on all edges including rakes, minimum 2-inch overlap (R905.2.8.5); double underlayment required for 2:12 up to 4:12 slopes (Table R905.1.1(2))
  • Sidewalls must be step-flashed; continuous flashing at sidewalls is not acceptable (R905.2.8.3)
  • Roofing material must be rated for 115 mph sustained wind per IRC Table R301.2(1).1 / Table R905.2.4.1
  • Homeowners may pull the roof permit without a contractor's license only if the house is their primary residence and no contractor performs the work
  • OSHA-approved ladders required for inspection access to the roof; telescoping ladders are NOT acceptable

Required documents

  • RequiredRoofing Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco

Fee schedule

Fee typeAmountNotes
Residential Re-Roof - Shingle$132.00Town of Firestone Building Division Fee Schedule (REV 01.2025)
Residential Re-Siding$132.00Listed on the same fee line as re-roofing in the Miscellaneous Permits table
Reinspection Fee$75.00 progressive (24-hour inspection delay)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Solar PV Permit

Verified

Required for solar panel installation in Firestone. Governed by the 2018 IBC/IRC and 2023 NEC as locally adopted. The Town publishes a dedicated 'PV Solar Detach-Reset Process' guide for re-roofing under existing solar arrays, and solar installs carry a capped electrical permit fee distinct from the general residential electrical fee table.

Verified 2026-07-06 · Source

Requirements

  • Solar Install Electrical Permit fee is capped at a maximum of $500 for residential and $1,000 for commercial, regardless of system size, per the Electrical Permit Fee Table
  • A dedicated 'PV Solar Detach-Reset Process' guide governs the process for detaching and resetting solar panels (e.g., to allow a reroof underneath an existing array) — available on the Town's Building Guides page
  • Governed by the 2023 NEC as locally adopted for electrical scope, and 2018 IBC/IRC for structural/roof-mounting scope

Required documents

  • RequiredSolar/PV Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco
  • OptionalPV Solar Detach-Reset Process DocumentationRequired when detaching/resetting an existing solar array (e.g., for a reroof underneath it)

Fee schedule

Fee typeAmountNotes
Solar Install Electrical Permit (residential)Maximum $500Town of Firestone Building Division Fee Schedule (REV 01.2025)
Solar Install Electrical Permit (commercial)Maximum $1,000Town of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table, Solar Install Electrical Permit footnote

Demolition Permit

Verified

Required for residential demolition in Firestone, listed as a distinct flat-fee permit item on the Town's Building Division Fee Schedule.

Verified 2026-07-06 · Source

Requirements

  • Residential Demolition Permit is a distinct flat-fee line item on the Town's Building Division Fee Schedule
  • No demolition-specific plan-review requirement was found published beyond the standard permit application

Required documents

  • RequiredDemolition Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco

Fee schedule

Fee typeAmountNotes
Residential Demolition Permit$132.00Town of Firestone Building Division Fee Schedule (REV 01.2025)

Fence Permit

Verified

Required for residential fences under 6 feet in Firestone, listed as a distinct flat-fee permit item. No published guide or fee was found specifically for retaining walls, so this entry is scoped to fences only, per the genuinely-sourced fee schedule line item.

Verified 2026-07-06 · Source

Requirements

  • Residential Fence <6' is a distinct flat-fee line item on the Town's Building Division Fee Schedule
  • The Town's site publishes no specific requirement for fences 6 feet or taller, or for retaining walls — do not assume the same flat fee applies to taller fences or retaining walls without confirming with the Building Division

Required documents

  • RequiredFence Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco

Fee schedule

Fee typeAmountNotes
Residential Fence <6'$132.00Town of Firestone Building Division Fee Schedule (REV 01.2025)

EV Charger / Energy Storage System (ESS) Permit

Verified

Firestone publishes a dedicated 'Firestone Single Family EV Car Charger and/or Energy Storage System' requirements guide (Rev 3.26.2024), distinct from its general Building Guides. New residential EV charging systems and/or energy storage systems use an 'RES inspection type' for all inspections, with specific plan-review submittal items, a 2023-code local amendment requiring a heat detector interconnected to the home's smoke detector system when an attached garage has an EV charger (per NFPA 70 Article 625), and detailed ESS placement/energy-rating rules (IRC Section R327, locally amended). Billed under the same area-based Residential Electrical Permit fee table documented in the electrical-permit entry — no distinct EV/ESS fee line was found on the Fee Schedule.

Verified 2026-07-20 · Source

Requirements

  • Submit for plan review: (1) an electrical load calculation for the existing electrical panel, (2) specification documentation for the equipment to be installed, (3) a floor plan showing the location of the proposed equipment and the interconnected heat detector, and (4) a wiring diagram indicating point of connection, overcurrent protection, and wiring sizes/methods
  • Firestone 2023 Code Amendment to IRC R314.2.3: when an attached garage has an EV Power Transfer System car charger installed per NFPA 70 Article 625, a heat detector shall be wired to the home's smoke detector system
  • ESS-specific rules (IRC Section R327, as locally amended): ESS must be listed/labeled per UL 9540 (exempt if listed for residential use and under 1 kWh); individual units maximum 20 kWh; aggregate ratings capped at 40 kWh in utility closets/basements/storage, 80 kWh in garages/exterior walls/outdoors on the ground; minimum 3-foot separation between individual units; specific allowed locations (detached garages/accessory structures, attached garages on exterior walls only, or outdoors 3+ feet from doors/windows) with ESS prohibited in sleeping rooms or closets/spaces opening into sleeping rooms
  • Garage walls/ceilings require minimum 5/8-inch Type X gypsum board per Firestone's amended IRC Table R302.6 dwelling-garage separation table
  • Firestone-reviewed, stamped plans (printed from the online portal) and the permit card MUST be on-site for every required inspection — no inspection will be made without these
  • A document on company letterhead, signed by the master electrician, confirming all lugs and terminals were torqued to manufacturer specifications is required at inspection

Required documents

  • RequiredFirestone Single Family EV Car Charger and/or Energy Storage System (Building Guide, Rev 3.26.2024)Town of Firestone's dedicated EV/ESS requirements document: plan-review submittal checklist, 2023 code amendments (heat detector interconnection, ESS locations/energy ratings/spacing), and inspection checklist
  • RequiredElectrical Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco, same portal used for the general electrical-permit entry

Fee schedule

Fee typeAmountNotes
Residential Electrical Permit fee applies (area-based; no distinct EV/ESS line)$141.20 (not more than 1,000 sq ft) to $282.40 (1,501-2,000 sq ft), plus $14.12 per additional 100 sq ft over 2,000 sq ft — same area-based table as the electrical-permit entryTown of Firestone Building Division Fee Schedule (REV 01.2025); no separate EV charger or ESS fee line item was found on the fee schedule — EV/ESS installation is billed under the same Residential Electrical Permit table

Commercial Building Permit (New Construction / Additions)

Verified

Required for new commercial buildings and additions thereto in Firestone. Reviewed under the 2018 IBC as locally amended by Ordinance No. 1029 (the 'Firestone Building and Construction Code'), with the 2023 NEC for electrical scope. Firestone publishes a dedicated Commercial Permit Submittal Checklist (REV 03.25) distinct from residential submittals, and a separate 2026 Non-Residential Fees sheet covering water tap, impact, and use-tax charges layered on top of the standard valuation-based Building Permit Fee. All plans must be stamped by a Colorado Licensed Architect and Colorado Registered Engineers. Plan review/permit administration is by Town staff; inspections are performed by SAFEbuilt Colorado under contract.

Verified 2026-08-02 · Source

Requirements

  • All plans, specifications, and calculations must be stamped by their respective design professionals (Colorado Licensed Architect and Colorado Registered Engineers), per the Commercial Permit Submittal Checklist (REV 03.25)
  • All General, Mechanical, Plumbing, Electrical, and Sub-Contractors must be listed on the permit application AND licensed with the Town of Firestone as a condition of permit issuance
  • Total building valuation must be provided in addition to the total electrical valuation; detailed bids may be required if the Building Official deems valuations inaccurate for the proposed scope
  • Site-specific soils report required; structural design criteria must include ALL information required by 2018 IBC 1603 (wind speed/exposure, snow loads, seismic design category, soil-bearing data from a geotechnical engineer, etc.)
  • Civil package required: dimensioned site plans, grading and drainage plans, utility plans, and accessibility plans/details
  • Architectural code analysis required covering occupancy classification, construction type, sprinkler/fire alarm status, allowable height/stories/area, egress, accessibility (IBC Ch. 11), energy code compliance path, and life safety/egress plans per IBC 107.2.3
  • IECC compliance path documentation prepared by the designing Architect
  • Separate submittals must be made to the Frederick-Firestone Fire Protection District (Steve Iacino, Asst. Chief of Planning, 303-833-2742 / 720-526-6583) and St. Vrain Sanitation District (303-776-9570) — multi-family and all commercial projects require fire district approval
  • Sewer tap receipt from St. Vrain Sanitation required at time of permit submittal for new commercial; receipts from Little Thompson or Left Hand Water District required if the project is in those districts
  • Kitchen hoods, woodworking dust-collection systems, and spray/paint booths require additional engineered plans/shop drawings, with paint booth plans submitted to both the Fire Department and Building Department

Required documents

  • RequiredBuilding Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco with all contractors listed and Town-licensed
  • RequiredCommercial Permit Submittal Checklist packageFull stamped plan set per the Town's checklist: civil package, structural (IBC 1603 design criteria, foundations, framing), architectural code analysis and life-safety/egress plans, mechanical, electrical (one-line diagram, fault current and load calculations), and plumbing plans
  • RequiredSoils Report (Site Specific)Prepared by a geotechnical engineer; soil-bearing data must be based on it
  • RequiredComplete project manual(s)From the design team
  • RequiredIECC compliance path documentationPrepared by the designing Architect
  • RequiredSewer tap receipt (St. Vrain Sanitation)Proof of sewer tap purchase is required at time of permit submittal for new commercial and multi-family
  • OptionalWater district receiptFrom Little Thompson Water District or Left Hand Water District, for new commercial located in those districts

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$80 (valuation $1-$2,000) scaling by tier to $20,175 for the first $5,000,000 plus $3.50 per additional $1,000 or fraction thereofBuilding Division Fee Schedule (REV 01.2025); the 2026 Non-Residential Fees sheet explicitly defers building permit, plan review, electrical, construction meter, and backflow fees to this schedule. Final valuation is determined by square footage and average construction costs
Plan Review Fee65% of the Building Permit FeeRequired to be paid at time of submittal, per the 2026 Non-Residential Fees sheet
Administration Fee: Commercial$150.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Commercial Electrical Permit Fee$141.20 (electrical valuation under $2,000); $141.20 plus $14.12 per $1,000 or fraction thereof at $2,001 and aboveCPI-indexed annually (Denver-Aurora-Lakewood) per Colorado HB 19-1035
Footing/Foundation Permit (Commercial Projects Only)$2,000.00Optional early-start foundation permit; additional fees for full submittal will apply
Use Tax2.6% of half the valuation total2026 Non-Residential Fees sheet
Impact Fees (per 1,000 sq ft)$2,103.54 Industrial; $7,994.83 Commercial; $4,571.96 Office & Other Services; $4,378.21 InstitutionalTransportation + Municipal Facilities components, per the 2026 Non-Residential Fees sheet (1/1/2026)
Water Tap (SVW)$25,004.00 (5/8") to $200,032.00 (2"); 3" or larger as determined by Board of TrusteesPlus meter fee, e.g. $713.77 (5/8") to $3,716.00 (2" commercial). For CWCWD fees email building@firestoneco.gov
Backflow Preventer / Commercial$225.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Temporary Certificate of Occupancy$750.00$400 of that fee is refunded if the final CO is issued prior to the TCO expiration date
Reinspection Fee$75.00 progressive (24-hour inspection delay)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Commercial Tenant Finish (Tenant Improvement) Permit

Verified

Required for tenant finishes in existing commercial buildings in Firestone. Genuinely distinct from the new-commercial process: the Town publishes a separate 'Commercial Tenant Finish Permit Submittal Checklist' (REV 04.24) with its own scope — no civil package or soils report required, structural documentation only if applicable, change-of-occupancy analysis when the use changes, and energy code documentation typically only for previously unoccupied shell spaces. Plans must still be stamped by a Colorado Licensed Architect and Colorado Registered Engineers, and separate submittals to the Frederick-Firestone Fire District and St. Vrain Sanitation District are still required. Fees run through the same valuation-based Building Permit Fee Table — there is no distinct TI fee line.

Verified 2026-08-02 · Source

Requirements

  • Electronic documents required as PDF attachments via the online portal; incomplete submittals will be rejected; all submittals are reviewed in the order received (per the TI checklist, REV 04.24)
  • All plans, specifications, and calculations stamped by their respective design professionals (Colorado Licensed Architect and Colorado Registered Engineers)
  • All General, Mechanical, Plumbing, and Electrical Contractors listed on the permit application; total building valuation plus total electrical valuation provided (detailed bids may be required if the Building Official deems valuations inaccurate)
  • Architectural code analysis including change-of-occupancy analysis (if applicable), occupancy classification, sprinkler/fire alarm status, egress, accessibility (IBC Ch. 11), and life safety/egress plans per IBC 107.2.3
  • IECC/energy code compliance documentation only if applicable — typically for a previously unoccupied shell space
  • Structural package (IBC 1603 design criteria, foundations, framing) required only IF APPLICABLE to the TI scope
  • Electrical one-line diagram required only with a service upgrade or when substantial load is added to the existing system; electrical site plan only if exterior electrical equipment is added, moved, or removed
  • Kitchen hoods require manufacturer's shop drawings; spray/paint booths require engineered plans submitted to both the Fire Department and Building Department
  • Separate submittals must be made to the Frederick-Firestone Fire District and St. Vrain Sanitation District

Required documents

  • RequiredPermit Application (Online Portal)Submitted via citizenserve.com/firestoneco with all contractors listed; electronic PDF attachments required
  • RequiredTenant Finish plan set per the TI Submittal ChecklistStamped architectural package (code analysis, life-safety/egress plans, floor plans for affected levels, reflected ceiling plans, wall assemblies), plus mechanical, electrical, and plumbing plans for the affected scope
  • RequiredComplete project manual(s)From the design team
  • OptionalChange of occupancy analysisRequired if the tenant finish changes the occupancy classification
  • OptionalStructural plans and calculationsOnly if applicable to the TI scope (marked '**if applicable**' on the Town's checklist)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based; no distinct TI fee line)$80 (valuation $1-$2,000) scaling by tier, e.g. $1,075 for the first $100,000 plus $6.50 per additional $1,000 up to $500,000Building Division Fee Schedule (REV 01.2025); no separate tenant-finish fee line item exists — TI permits are billed under the same valuation table as other building permits
Plan Review Fee65% of the Building Permit FeeRequired to be paid at time of submittal per the 2026 Non-Residential Fees sheet
Administration Fee: Commercial$150.00Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table
Commercial Electrical Permit Fee$141.20 (electrical valuation under $2,000); $141.20 plus $14.12 per $1,000 or fraction thereof at $2,001 and aboveTown of Firestone Building Division Fee Schedule (REV 01.2025), Electrical Permit Fee Table (Commercial Fees)
Use Tax2.6% of half the valuation total2026 Non-Residential Fees sheet
Temporary Certificate of Occupancy$750.00$400 refunded if the final CO is issued prior to the TCO expiration date
Reinspection Fee$75.00 progressive (24-hour inspection delay)Town of Firestone Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table

Sign Permit

Verified

Required to display, construct, install, erect, remodel, relocate, expand, or alter any sign within Firestone town limits — including a copy change — per Firestone Development Code (FDC) Section 16.6.12(D). The sign-permit requirement, the fee-by-reference rule, and the design and temporary-sign standards below come from the Firestone Development Code, February 2025, which the Town publishes in full on firestoneco.gov. The Town also publishes a Sign Permit Submittal Checklist (REV 4.24) and a Building Division Fee Schedule (REV 01.2025); the fee schedule carries no standalone sign fee line item, so the sign fee is set by reference through the general building permit fee.

Verified 2026-08-13 · Source

Requirements

  • No sign shall be displayed, constructed, installed, erected, remodeled, relocated, expanded, altered, or have its copy changed until a sign permit is obtained from the Town, per FDC Section 16.6.12(D)(1); no permit is required for routine sign maintenance
  • The fee for a sign permit shall be the building permit fee charged for the sign as determined by the currently adopted building and electrical codes, per FDC Section 16.6.12(D)(2) -- confirmed consistent with the absence of any standalone sign-permit fee line item in the Town's own Building Division Fee Schedule (REV 01.2025, read directly in full)
  • Exceptions from the sign PERMIT requirement (still subject to other sign standards), per FDC Section 16.6.12(D)(4): building numbers/addresses, interior signs, signs accessory to utility cabinets or pedestals, small signs, and temporary signs in single-family zoning districts
  • Full exemptions from the sign ARTICLE entirely, per FDC Section 16.6.12(C)(2): U.S./state/civic-organization flags; merchandise visible in a store window; scoreboards/time-temperature/stock-exchange devices; required (code-mandated) signs; memorial signs; governmental signs; murals that do not advertise a business; address-only signs; Town decorations/Special-Events signage on Town property; and freestanding artwork/architectural features integral to a building's design
  • Design standards vary by zoning district and sign type (FDC Tables 6.12-2, 6.12-3, 6.12-4): single-family residential wall signs capped at 4 sf with no illumination, freestanding subdivision-entry signs up to 100 sf/8 ft; multi-family wall signs up to 32 sf, freestanding entry signs up to 100 sf/8 ft; non-residential wall signs up to 100 sf principal + 32 sf per secondary sign, freestanding signs up to 32 sf/10 ft (1 per street frontage, +1 per 500 ft of additional frontage), and large-development freestanding "Development Identification" signs up to 200 sf/35 ft (developments over 20 acres on arterial/collector frontage), boosted to 300 sf/50 ft within 1,200 ft of the I-25 right-of-way
  • Engineering by a Colorado-licensed design professional is required for all monument sign foundations and for the connections of all building-mounted signs; structural design criteria must include everything required by 2018 IBC 1603 (wind speed/exposure, ground snow load, risk category, seismic design category/site class, soil-bearing data for monument signs)
  • Changeable Copy Displays (CCDs), including Electronic Message Displays (EMDs), are permitted only in non-residential zoning districts, must be integrated into a permanent sign's face, are capped at 33.3% of a monument sign's face area, must display static messages only (no image transitions), may not change more than once every 60 seconds, an EMD pixel pitch may not exceed 20 millimeters, and automatic dimming (software or solar sensor) is required to control nighttime brightness/glare
  • Temporary signs (FDC Tables 6.12-5, 6.12-6) are capped by zoning category: non-residential wall-attached temporary signs up to 40 sf for 60 days per sign / 180 days per year total; multi-family up to 8 sf for 60 days per sign / 90 days per year; single-family up to 6 sf for 60 days per sign / 90 days per year. Freestanding temporary signs: non-residential up to 32 sf/8 ft (64 sf/12 ft and doubled sign count within 1,200 ft of I-25), multi-family and single-family up to 8-32 sf/8 ft, all subject to the same 60-day-per-sign / 90-180-day-per-year caps
  • Prohibited outright, per FDC Section 16.6.12(F): animated/moving/flashing/blinking signs (except conforming EMDs and clocks/temperature displays), abandoned or inoperable signs, roof signs (extending above the roofline), vehicle signs, signs obstructing required egress/ingress/ventilation/safety equipment, signs attached to trees/utility poles/pedestals/mailboxes/traffic-control devices, and signs placed in the public right-of-way (other than Town/governmental signage)

Required documents

  • RequiredSign Permit Application (Online Portal)Submitted via citizenserve.com/firestoneco; General and Electrical Contractors must be listed, and both total project valuation and total electrical valuation must be provided
  • RequiredSite PlanTo-scale, dimensioned site plan identifying the locations of all new signs, per the Sign Permit Submittal Checklist (REV 4.24)
  • RequiredLetter of Approval from Owner/LandlordRequired per the Sign Permit Submittal Checklist
  • RequiredSign Shop DrawingsFrom the sign company, showing types, sizes, and profiles of all proposed signs (monument, building-mounted, etc.)
  • OptionalStructural Design Criteria / Foundation and Framing PlansRequired for monument signs (foundations) and for the structural connections of building-mounted signs; must address all 2018 IBC 1603 design-criteria items

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (= Building Permit Fee charged for the sign)$80 minimum, scaling per the same valuation tiers as the general Building Permit Fee TableFDC Section 16.6.12(D)(2); no standalone sign fee line item exists in the Town's Building Division Fee Schedule (REV 01.2025), consistent with this fee-by-reference rule
Plan Review Fee65% of the Building Permit FeeTown of Firestone Building Division Fee Schedule (REV 01.2025), Plan Review Fee for Building Permits
Commercial Electrical Permit Fee (if the sign is illuminated or otherwise requires electrical work)$141.20 (electrical valuation under $2,000); $141.20 plus $14.12 per $1,000 or fraction thereof at $2,001 and aboveApplicable only if electrical equipment is added, moved, or removed on the exterior of the building, per the Sign Permit Submittal Checklist's Electrical section
Administration Fee: Commercial$150.00Applies if the sign permit is processed under the commercial fee track

Fire Sprinkler and Fire Alarm System Permit

Verified

Colorado is home-rule with no statewide fire code floor, so which authority governs fire sprinkler/alarm work in Firestone had to be independently confirmed rather than assumed. Firestone has NO Town-run fire department -- fire-code plan review, permitting, and inspection for fire alarm and fire sprinkler systems are handled directly by the Frederick-Firestone Fire Protection District (FFFPD), a special district under Title 32, C.R.S. The localAmendments and commercial-building-permit/commercial-tenant-improvement-permit entries already note that multi-family and all commercial projects require FFFPD approval (303-833-2742), but FFFPD's own direct process had not previously been documented as its own permit type. RESEARCHED 2026-08-13: every fact below was read directly from FFFPD's own 2026 Fee Schedule PDF, Application for Plan Review PDF, and Submittal Requirements for Plan Review PDF (all downloaded and read directly), not inferred or search-summarized. Carries 'verified' confidence on that basis.

Verified 2026-08-13 · Source

Requirements

  • Frederick-Firestone Fire Protection District (FFFPD, 8426 Kosmerl Place, Frederick, CO 80504, 303-833-2742, fireprevention@fffd.us) is Firestone's fire-code plan-review and permitting authority for fire alarm and fire sprinkler systems -- consistent with the existing commercial-building-permit entry, which already directs multi-family and commercial submittals to FFFPD
  • FFFPD issues permits for installation of any new fire alarm or fire sprinkler system -- including fire pumps, kitchen hood suppression systems, bi-directional amplification systems, AES Radio systems, and underground fire lines -- and for any modification to an existing system, per FFFPD's own 2026 Fee Schedule
  • Fire Protection System Plan Review, Permit and Inspection Fees are assessed at 0.03 times the project value (materials and labor, as reported by the contractor), with a $300.00 minimum fee. If you are used to budgeting fire-protection review at a 0.025 rate, budget higher for work in Firestone.
  • Submission is electronic only -- thumb drive, PDF by email, or a file-sharing service such as Dropbox or Citrix -- sent directly to fireprevention@fffd.us; required items are a completed and signed FFFPD Application for Plan Review, unlocked stamped Civil/Architectural/MEP drawings, and unlocked Fire Safety System shop drawings with data/cut sheets (fire alarm, fire sprinkler, hazardous materials, kitchen hood suppression, mobile food vehicle, etc.), per FFFPD's own Submittal Requirements for Plan Review document
  • FFFPD does NOT accept deferred submittals except for Kitchen Hood Fire Suppression Systems and Commercial Paint Spray Booths -- all other fire protection systems must be part of the initial complete submittal
  • All submitted documents/drawings must be stamped by an independent Colorado-licensed Engineer, Architect, or NICET Level III designer specializing in fire protection, including a written report on how the design meets the currently adopted International Fire Code and current NFPA Standards
  • All fire suppression contractors and underground fire line installation contractors must be registered with the Colorado Division of Fire Prevention and Control, with current registration copies provided with every submittal
  • No numeric review-timeline figure, minimum or maximum, is published anywhere in FFFPD's own Application for Plan Review form or Submittal Requirements document. If you have worked with a different Front Range fire district that states a minimum review period, do not assume the same applies here.

Required documents

  • RequiredApplication for Plan Review (Frederick-Firestone Fire Protection District)Emailed to fireprevention@fffd.us; captures IBC construction type/occupancy class, IBC/IFC edition, gross square footage, and whether the building is protected by an automatic fire sprinkler system
  • RequiredStamped Civil, Architectural, and MEP DrawingsUnlocked electronic drawings, per FFFPD's Submittal Requirements for Plan Review
  • RequiredFire Safety System Shop DrawingsFire alarm and/or fire sprinkler shop drawings with data/cut sheets, unlocked
  • RequiredColorado Division of Fire Prevention and Control Contractor RegistrationRequired for fire suppression and underground fire line installation contractors, provided with every submittal

Fee schedule

Fee typeAmountNotes
Fire Protection System Plan Review, Permit, and Inspection Fee0.03 x total project value (materials and labor), $300.00 minimumFFFPD 2026 Fee Schedule (PDF, downloaded and read directly 2026-08-13)
Additional Service (hourly rate)$100.00/hourFrederick-Firestone Fire District 2026 Fee Schedule, Additional Fees
Failed Inspection$100.00/hour, two (2)-hour minimum ($200.00 minimum)Frederick-Firestone Fire District 2026 Fee Schedule, Additional Fees; failed inspections are billed at the hourly rate for a minimum of two hours
Work performed without a permitDouble the original plan review and permit fee

Change of Use / Change of Occupancy Permit

Verified

Firestone has no standalone 'change of use permit' application, fee, or numeric review timeline distinct from its general Commercial Building Permit / Commercial Tenant Finish process. The Town's own Firestone Development Code (February 2025) formally defines 'Change of Use' (Section 16.11.3, Definitions) as changing a building's or land's occupancy to a different permitted use, and treats it as a TRIGGER for other standards (Section 6.4 landscaping compliance, Section 6.6 off-street parking planning) rather than as a distinct permit type of its own. On the Town Building Division side, a change of use is processed through the same Commercial Building Permit or Commercial Tenant Finish Permit application already documented for this jurisdiction (whose own submittal checklist calls for a change-of-occupancy analysis only if applicable). Separately, FFFPD's own 2026 Fee Schedule explicitly names 'change of use' as one of the building modifications requiring its own Building Construction Permit, and St. Vrain Sanitation District separately reviews any change of occupancy that affects wastewater demand. The entry carries 'partial' confidence because the Town's published materials leave unclear whether a construction-free change of use (no accompanying trade work) still requires a full Building-Permit-fee submittal purely for occupancy sign-off.

Verified 2026-08-13 · Source

Requirements

  • Firestone's own Development Code formally defines 'Change of Use' (Section 16.11.3, Definitions): the act of changing the occupancy of a building or land from a use specifically listed as a 'Permitted Use,' covering (a) a single-tenant building's or parcel's occupancy changing from its most recent use to a different one, (b) a tenant space in a multi-tenant building changing to a use not currently existing (or not existing within the last 12 months) elsewhere in the building, or (c) reestablishing or changing use after a 12-consecutive-month abandonment of the prior use
  • FDC Section 16.6.4(B)(3) (Landscaping) lists 'any change of use from one primary use classification to another (for example, residential use to commercial use)' as one of three triggers -- alongside additions and floor-area/story increases -- that require compliance with the Town's landscaping standards (Section 6.4)
  • FDC Section 16.6.6 (Off-Street Parking) separately flags that development with approvals permitting a future change of use requiring additional parking must reserve undeveloped on-site area to accommodate those future parking needs
  • No standalone Town of Firestone 'change of use permit' application, fee, or numeric review timeline is published on the Building Permits & Fees page, Building Submittal Requirements page, Building Guides page, the Development Code itself, or the Building Division Fee Schedule (REV 01.2025) -- checked all directly; a change of use is instead processed through the same Commercial Building Permit or Commercial Tenant Finish Permit application already documented in this record, whose own checklist requires a change-of-occupancy analysis only if the project changes the occupancy classification
  • FFFPD's own 2026 Fee Schedule explicitly names 'change of use' as one of the building modifications (alongside new building construction, remodel, and tenant finish) requiring its own separate Building Construction Permit -- billed at 0.0018 times the project valuation with a $300.00 minimum fee (fire alarm/sprinkler system valuations may be subtracted from the total project valuation); this FFFPD-side permit is separate from, and in addition to, both the Town's own Building Division review and FFFPD's own fire-protection-system-specific permit (the fire-sprinkler-alarm-permit entry)
  • Saint Vrain Sanitation District separately reviews plans for any 'expansions or change of occupancy that affects the demand for wastewater services,' per the Town's own Taxes, Licensing & Permitting page -- a third, independent review layer distinct from both the Town Building Division and FFFPD
  • FFFPD's own fee schedule explicitly states its building construction permits are NOT required to construct, remodel, or renovate one- or two-family homes or townhomes -- so the FFFPD-side change-of-use fee applies to commercial/multi-family change-of-use projects, not residential ones

Required documents

  • RequiredBuilding Permit Application (Commercial Building Permit or Commercial Tenant Finish Permit, Online Portal)Same citizenserve.com/firestoneco submittal used for every other commercial/tenant-finish permit type in this record; a change-of-occupancy analysis is included in the architectural code analysis only if the use classification is changing
  • OptionalFFFPD Application for Plan ReviewRequired if the change of use involves building construction/modification within FFFPD's jurisdiction (see the fire-sprinkler-alarm-permit entry for FFFPD contact info; the FFFPD-side Building Construction Permit fee is documented in this entry's fees)
  • OptionalSt. Vrain Sanitation District ReviewRequired if the change of use affects wastewater demand, per the Town's own Taxes, Licensing & Permitting page

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same table as commercial-building-permit/commercial-tenant-improvement-permit, if construction accompanies the use change)$80 minimum, scaling per tierNo distinct change-of-use fee line exists on the Town's Building Division Fee Schedule (REV 01.2025); billed under the same valuation table as other building/tenant-finish permits
Plan Review Fee65% of the Building Permit FeeBuilding Division Fee Schedule (REV 01.2025), Plan Review Fee for Building Permits header — 65% of the building permit fee.
Administration Fee: Commercial$150.00Building Division Fee Schedule (REV 01.2025), Miscellaneous Permits and Fees table — Administration Fee: Commercial at $150.00.
FFFPD Building Construction Permit Fee0.0018 x project valuation, $300.00 minimum (fire alarm/sprinkler system valuations may be subtracted from the total)Frederick-Firestone Fire Protection District 2026 Fee Schedule; billed separately from, and in addition to, the Town's own fees, and separate from FFFPD's own fire-protection-system-specific permit fee (the fire-sprinkler-alarm-permit entry)
Temporary Certificate of Occupancy$750.00 ($400 refunded if the final CO is issued prior to the TCO expiration date)Same fee already documented elsewhere in this record

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Firestone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-02)View current record →All versions →

Permalink: /colorado/weld-county/firestone/as-of/2026-08-13/

Snapshot date: 2026-08-13

Commit: ea8ee7f

Reproducible from PermitBase’s version-controlled dataset, commit ea8ee7f.