Skip to main content
PermitBase

Garden City building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Garden City, Colorado.

Reviewed 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
9705 W. 10th Street, Garden City, CO 80631
Phone
970-351-0041
Email
Office hours
Town Hall main line 970-351-0041. Garden City has no in-house Building Official or Building Department staff of its own (Town Hall Employees directory lists only a Town Administrator, Deputy Clerk/Municipal Court Clerk, Finance Clerk, and Administrative Assistant); building inspection and plan review services are contracted out to ProCode Inc., which rebranded to SAFEbuilt in 2023-2024 and serves numerous Front Range Colorado municipalities from its Johnstown, CO office (39 S. Parish Avenue, Suite 220, Johnstown, CO 80534; 970-305-3161; COemail@safebuilt.com). Permit applications and inspection scheduling for Garden City route through the CommunityCore online portal, not directly through SAFEbuilt's own site.

Inspection sequence

Applies to: Residential Building Permit (New Construction / Additions / Structures Over 120 sq ft)

  1. 1

    Foundation

    Before concrete pour, per 30-inch minimum frost line and engineer-stamped foundation drawings

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Insulation

    Per locally-amended IRC R109.1.5.2: inspection of wall, ceiling, and floor insulation and exterior windows required before wall coverings are installed

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes; gas-utility (Atmos) pressure test required if gas service was shut off during the project

Applies to: Residential Addition / Remodel / Demolition Permit

  1. 1

    Rough Frame / Structural

    Framing and any structural modifications inspected before cover

  2. 2

    Insulation

    Required before wall coverings are installed, if insulation scope is affected

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Deck / Patio Cover / Retaining Wall Permit

  1. 1

    Footing/Foundation

    Before concrete pour, for decks and patio covers requiring footings, per the Town's 30-inch minimum frost line

  2. 2

    Final Inspection

    Structure complete per approved plans

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment; contemporaneous DORA license review performed at this inspection

  2. 2

    Final Inspection

    Devices installed, panel labeled, system verified

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    EVSE circuit wiring and disconnect installed before concealment; contemporaneous DORA license review performed at this inspection

  2. 2

    Final Inspection

    EVSE unit connections, breaker/disconnect, and grounding verified; system energized

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, gas piping, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational; gas-utility (Atmos) pressure test required if gas service was shut off during the project

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment; contemporaneous DORA license review performed at this inspection

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Solar Photovoltaic (PV) System Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement, and grounding verified before concealment; contemporaneous DORA electrical license review performed at this inspection

  2. 2

    Final — Structural / Electrical

    Panel mounting, racking attachment, roof penetration sealing, and all electrical connections verified against approved plans and required placards/labels

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Garden City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Garden City building permits

Get alerts for Garden City

We'll email you when Garden City's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.