Plumbing Permit — Garden City, Colorado · Requirements sheet
Verified 2026-07-23 · Source: https://www.townofgardencity.com/municipal-code-building-permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Garden City, Colorado
Required for plumbing addition or extension work in Garden City. Governed by the 2024 International Plumbing Code (IPC) as locally amended (UPDATED 2026-07-23 — Ordinance 11-2025 superseded the 2018 edition; depth figures below re-confirmed identical). Plumbing contractors must hold Colorado State Plumbing Board (DORA) licensure, verified contemporaneously at inspection by the Town's contracted building department.
Verified 2026-07-23 · Source
When you need this permit
- Plumbing addition or extension listed among projects requiring a permit in the Town's published permit-requirement chart
- Governed by the 2024 IPC as locally amended (Ordinance 11-2025; minimum sewer depth 12 inches per amended P2603.5.1/P305.4.1; roof extension minimum 12 inches per amended P3103.1.1/P903.1 — values unchanged from the prior 2018-edition ordinance)
- Plumbing contractors must hold current Colorado State Plumbing Board (DORA) license and registration; contemporaneous review performed at inspection per C.R.S. 12-155-120(1) and (10), effective January 1, 2020
- Lawn sprinkler back-flow prevention devices explicitly listed as requiring a permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment; contemporaneous DORA license review performed at this inspection
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
See the full Garden City inspection guide — scheduling & re-inspection fees →
Tips
- Lawn sprinkler back-flow prevention devices require a permit in Garden City — a detail some homeowners miss since sprinkler-only work can otherwise feel like routine landscaping.
- Minimum sewer/roof-extension depths were locally amended to 12 inches — confirm your plumber is aware of Garden City's specific amendment rather than a generic IPC default.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Garden City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Garden City
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Garden City project checklist
Describe your project once and get every permit, document, and fee it triggers in Garden City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →