EV Charger / EVSE Permit in Garden City, Colorado
Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Garden City. As with all electrical work in this jurisdiction, the Town has no in-house Building Department — permitting is administered under contract by ProCode Inc. (rebranded SAFEbuilt in 2023-2024). CORRECTED 2026-07-23: Garden City DOES maintain its own locally-codified Electrical Code (NEC 2017 Edition, Municipal Code Ch. 18 Art. 3, per Ordinance 04-2020/04-2023, auto-updating to track the State Electrical Board's own adoptions one year later); what remains true is that electrical-CONTRACTOR licensing itself is a State of Colorado (DORA) function, with no separate Garden City licensing board. No fee schedule for any permit type — including electrical — is published anywhere on the Town's site; this is a confirmed gap across every permit type in this file, not specific to EV chargers (re-chased and re-confirmed unrecoverable as of 2026-07-23 — see top-level notes).
Verified 2026-07-23 · Source
When you need this permit
- Electrical work (including an EVSE circuit) listed among projects requiring a Building/Electrical Permit in the Town's published permit-requirement chart
- Electrical contractors must hold current Colorado State Electrical Board (DORA) licensure; contemporaneous review of licensure is performed at inspection per C.R.S. 12-23-116
- Garden City HAS adopted its own local Electrical Code by reference — NEC 2017 Edition, Municipal Code Ch. 18 Art. 3 (Ordinance 04-2020, re-codified by Ordinance 04-2023) — with the effective edition auto-updating to track the Colorado State Electrical Board's own adoptions one year after each state adoption; contractor LICENSING (as distinct from code adoption) remains a State of Colorado (DORA) function with no separate Garden City board
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
EVSE circuit wiring and disconnect installed before concealment; contemporaneous DORA license review performed at this inspection
- 2
Final Inspection
EVSE unit connections, breaker/disconnect, and grounding verified; system energized
See the full Garden City inspection guide — scheduling & re-inspection fees →
Tips
- Garden City has no in-house Building Department — all plan review and inspections for an EV charger circuit are performed under contract by ProCode Inc. (SAFEbuilt); confirm your electrician holds current Colorado State Electrical Board (DORA) licensure, since this is what the Town's contracted inspector verifies contemporaneously at inspection under state law.
- No fee amount is published anywhere on the Town's site for an electrical permit, including an EV charger circuit — this matches the pattern for every other permit type in this file, re-confirmed via a full re-chase on 2026-07-23 (see top-level notes). Contact Town Hall (970-351-0041) or SAFEbuilt's Johnstown office (970-305-3161) for a project-specific quote before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Garden City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Garden City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Garden City project checklist
Describe your project once and get every permit, document, and fee it triggers in Garden City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →