Residential Addition / Remodel Permit (including Basement Finish) — Johnstown, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://johnstownco.gov/607/Addition
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel Permit (including Basement Finish) in Johnstown, Colorado
Required for additions, basement finishes, and interior remodels in Johnstown. Covers 'the addition of a space not previously built in a residential building or property' (bedrooms, bathrooms, lofts, walls, gas lines) and 'a full or partial finish of a residential unfinished basement.' Reviewed under the 2024 IRC as adopted; categorized as 'Residential Alterations/Additions' under the Town's 'Review Required' permit category.
Verified 2026-07-06 · Source
When you need this permit
- Permit required for additions (bedrooms, bathrooms, lofts, walls, gas lines) and for full or partial basement finishes, per the Town's Addition and Basement Finish project pages
- Decks, covered/enclosed porches, pergolas, and stairs require a permit
- All submissions must be in electronic (PDF) format
- Required information: building owner name/contact info, owner's address (if different from job site), building/unit/lot number for multi-unit properties, and a drawing of the proposed work
- All contractors must hold a current Town of Johnstown Contractor License and be listed on the permit Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Structural Rough
Framing complete before cover (Addition scope)
- 2
Drywall / Insulation
Basement Finish scope only, per the Town's 11-inspection basement-finish sequence
- 3
Electrical Rough / Mechanical Rough (incl. Gas Test) / Plumbing Rough / Underground
Trade rough-ins before concealment; scope-dependent per the Town's Addition and Basement Finish pages
- 4
Electrical Final / Mechanical Final / Plumbing Final
Trade finals
- 5
Final Building
All work complete per approved plans
See the full Johnstown inspection guide — scheduling & re-inspection fees →
Tips
- Basement Finish carries an 11-inspection sequence (drywall, insulation, structural rough, final building, electrical rough/final, mechanical rough/final, plumbing rough/underground/final) — budget scheduling time accordingly, since each must be requested by 4 p.m. the prior business day.
- Both Addition and Basement Finish permits carry the same published 14-business-day turnaround — plan submittal timing around this figure.
- Plan review fees differ by exact scope: $50 for new stock home/basement/alteration vs. $100 for additions/detached garages/sheds vs. $20 for decks/arbors — confirm which line item applies to your specific project before budgeting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Johnstown building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Johnstown
Residential Addition / Remodel Permit (including Basement Finish) in other cities
Compare residential addition / remodel permit (including basement finish) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Johnstown project checklist
Describe your project once and get every permit, document, and fee it triggers in Johnstown — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →