Skip to main content
PermitBase

Version history — Kersey, Colorado

This is PermitBase’s own verified record for Kersey, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Kersey’s actual law was at that time.

Permanent link to today’s record

/colorado/weld-county/kersey/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Kersey, Colorado — Residential Building Permit (New Construction / Additions) fee record updated: $250.00 → $150.00
    • Kersey, Colorado — Commercial Building Permit (New Commercial Construction) fee record updated: $300.00 per the Town's 2026 Fee Schedule → $1,500.00
    • Kersey, Colorado — Sign Permit fee record updated: Not published as a numeric figure on the Town's website → $500.00 plus use tax
  • 2026-08-20Superseded
  • 2026-08-14Superseded
    • Kersey, Colorado — Sign Permit record added
    • Kersey, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
    • Kersey, Colorado — Change of Use / Change of Occupancy record added
  • 2026-08-02Superseded
    • Kersey, Colorado — Commercial Building Permit (New Commercial Construction) record added
    • Kersey, Colorado — Commercial Tenant Finish / Remodel (Tenant Improvement) Permit record added
  • 2026-07-23Superseded
    • Kersey, Colorado — adopted-codes record updated
    • Kersey, Colorado — Accessory Dwelling Unit (ADU) Permit fee record added: ADU Application Fee (Not a fixed published amount)
    • Kersey, Colorado — Accessory Dwelling Unit (ADU) Permit fee record removed: ADU Application / Building Permit Fees
    • Kersey, Colorado — plan-review timeline record updated: 30–30 business days
  • 2026-07-20Superseded
    • Kersey, Colorado — Rooftop Solar Photovoltaic Permit record added
    • Kersey, Colorado — Rooftop Solar Photovoltaic Permit fee record added: Electrical interconnection component (statutory statewide fee schedule) (Same valuation-based formula as the DORA/State Electrical Board schedule: $100-$120 base fee for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, capped in aggregate (with all other Kersey solar fees) at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113)
    • Kersey, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Kersey began