This is PermitBase’s published record for La Salle as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

La Salle building permits

La Salle, Colorado — as published 2026-07-06.

Reviewed 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC) — per the Town of La Salle Building Permits page: 'The Town of LaSalle has adopted and is currently enforcing the 2018 International Codes, 2012 Energy Conservation Code, and 2020 National Electrical Code.'2018 International Residential Code (IRC)2018 International Mechanical Code (IMC)2018 International Plumbing Code (IPC)2018 International Fuel Gas Code (IFGC) (bundled under the page's 'International Codes' reference; not itemized by individual code title on the live page)2012 International Energy Conservation Code (IECC) — the live page names this specifically as '2012 Energy Conservation Code,' an older cycle than the 2018 base I-Codes it is paired with2020 National Electrical Code (NEC)2025 Colorado Wildfire Resiliency Code (Colorado Division of Fire Prevention and Control model code, dfpc.colorado.gov/WRCB) — listed as adopted on the Town's Building Permits pageModel Colorado Electric and Solar Ready Code (Colorado Energy Office, energyoffice.colorado.gov/building-energy-codes-toolkit) — listed as adopted on the Town's Building Permits pageNote on document currency and code-cycle discrepancy: the Town's Municode-codified Chapter 18 (Building Regulations), as of this review, still recites the 2003 IBC/IRC/IPC/IMC/IFGC, 1999 NEC, and 1997 Uniform Code for Abatement of Dangerous Buildings, with a 1977/1978-vintage Colorado energy standard — none of which match the 2018 I-Codes / 2012 IECC / 2020 NEC the Town's actively-maintained Building Permits webpage states it is 'currently enforcing.' Consistent with this corpus's established pattern (e.g. Vail), the live, actively-maintained Building Permits page is treated as the current governing statement of adopted codes, since Municode codification frequently lags the underlying adopting ordinances and La Salle's own current-enforcement statement is unambiguous and specific (exact code years named). The codified Chapter 18 text is retained here only as a source of durable local AMENDMENT language (definitions, frost depth, sleeping-room rules, refund provisions, fee-authorization mechanism) that is very likely still in force, since local amendments of this kind are typically carried forward from cycle to cycle rather than dropped, but the umbrella code EDITIONS themselves follow the live page.Note on HB22-1362 (statewide energy floor, window July 2023-July 2026): the Town's stated 2012 IECC base energy code edition does NOT itself meet HB22-1362's requirement that jurisdictions updating their code during this window adopt at least the 2021 IECC. However, the Town's Building Permits page separately lists the 'Model Colorado Electric and Solar Ready Code' as adopted alongside the 2025 Colorado Wildfire Resiliency Code — meaning La Salle appears to have layered on the HB22-1362 electric/solar-ready provisions as a standalone addition without upgrading its underlying energy-code base edition to 2021 IECC. This is reported honestly as observed; this file does not assume full HB22-1362 compliance, only that the electric/solar-ready model code specifically has been adopted per the Town's own published list.

Permit types & fees

Residential Building Permit (New Construction)

Required for new single-family/duplex construction in the Town of La Salle. Reviewed under the 2018 IRC/IBC as currently enforced by the Town, plus the 2012 IECC energy provisions and local Chapter 18 amendments (engineered foundation/soils report requirement, stud/joist spacing, egress and sleeping-room definitions). Plan review and inspections are performed by ProCode Inc. (SAFEbuilt) under contract to the Town.

Reviewed 2026-07-06 · Source

Requirements

  • Plans must comply with the 2018 IRC/IBC as currently enforced by the Town, the 2012 IECC, and the 2020 NEC
  • Foundation design and construction drawings must be stamped by a Colorado-registered professional engineer or licensed architect, based on an engineer's soils report (per codified Chapter 18 IRC local amendment)
  • A site certification prepared by a State-licensed professional engineer or land surveyor is required for new Group R Division 3 (single-family/duplex) occupancies prior to certificate of occupancy
  • Floor joists spaced a maximum of 19.2 inches on center, or engineered to an L/480 deflection limit; exterior and load-bearing wall studs spaced no more than 16 inches on center
  • Electrical and plumbing contractors must hold current Colorado DORA (State Electrical Board / State Plumbing Board) licenses, registered with the Town/ProCode and subject to contemporaneous license verification per the Colorado Chapter ICC 'Procedure for Contemporaneous Reviews of Electrical and Plumbing Licenses' (HB19-1086, SB19-156)
  • Application submitted through the Town's Community Core online permitting system; a hard copy of reviewed/stamped plans must be kept on the job site — this remains the applicant's responsibility even after electronic approval

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Town of La Salle's Community Core online permitting portal
  • RequiredStamped Structural/Foundation PlansFoundation plans stamped by a Colorado-registered engineer or licensed architect, based on an engineer's soils report
  • RequiredSite CertificationRequired for new single-family/duplex (Group R Division 3) occupancies prior to certificate of occupancy, prepared by a State-licensed engineer or land surveyor

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based (labor + materials + profit, including electrical/plumbing scope); no current numeric valuation-tier fee table is published by the Town or ProCode as of this review — contact ProCode (970-305-3161) or Town Hall (970-284-6931) for a project-specific quote. Codified Chapter 18 Sec. 18-9 references 'the current fee schedule contained in the 2003 International Building Code' as amendable by Town Board resolution, but no such current resolution is published online.
Construction Use Tax2% of total material costPer the Town's Building Permits page: 'The Town also has a 2% use tax on the total cost of the material.'
Credit Card Processing Fee$3.00 per phone transactionCredit card transactions are not accepted above $350.00 total

Residential Addition / Remodel Permit

Required for additions, basement refinishes, and interior remodels to existing residential structures in La Salle. Reviewed under the 2018 IRC as currently enforced, with a lighter document set than new construction for remodels not involving structural changes.

Reviewed 2026-07-06 · Source

Requirements

  • Additions and basement refinishes require full compliance with the 2018 IRC as enforced by the Town
  • Structural changes (wall removal, new foundation elements) require engineer/architect-stamped plans
  • Electrical/plumbing/mechanical scope within an addition or remodel requires a licensed, Town-registered contractor holding a current Colorado DORA license
  • Application submitted via Community Core online permitting system

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core
  • OptionalStructural Plans (if applicable)Required if the scope includes new foundation work or removal of load-bearing elements

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based (labor + materials + profit); no current published valuation-tier table — contact ProCode or Town Hall for a project-specific quote
Construction Use Tax2% of total material cost

Electrical Permit

Verified

Required for electrical installation, alteration, or repair in La Salle, issued locally by the Town (via ProCode) under the 2020 NEC as adopted. Electricians must hold a current Colorado State Electrical Board (DORA) license, which the Town/ProCode verifies contemporaneously per the standard Colorado Chapter ICC procedure (SB19-156).

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2020 NEC as currently enforced by the Town
  • Electricians must register with the Town/ProCode before applying for a permit and must provide current Colorado DORA State Electrical Board license credentials at registration
  • Town/ProCode staff verify DORA license status contemporaneously using DORA's licensing service; inspectors may also conduct field reviews of electricians and apprentices on job sites, with emphasis on large multifamily/commercial sites
  • Non-compliance discovered during a contemporaneous review may result in a complaint filed with the State Electrical Board per C.R.S. Title 12, Article 115

Required documents

  • RequiredElectrical Permit ApplicationSubmitted via Community Core; contractor registration with current DORA license required

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeValuation-based (installation labor + materials + profit); no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair in La Salle, issued locally by the Town (via ProCode) under the 2018 IPC as adopted, with local frost-depth and sewer-depth amendments carried forward from codified Chapter 18. Plumbers must hold a current Colorado State Plumbing Board (DORA) license, contemporaneously verified by the Town/ProCode per HB19-1086.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IPC as currently enforced by the Town
  • Exterior water supply piping required not less than 6 inches below the frost line and not less than 48 inches below finish grade (local Chapter 18 amendment)
  • Plumbers must register with the Town/ProCode before applying for a permit and provide current Colorado DORA State Plumbing Board license credentials, subject to contemporaneous verification
  • Two dedicated documents on the Town's Building Permits page address plumbing contemporaneous review specifically (2019 SOP and a general contemporaneous-reviews procedure)

Required documents

  • RequiredPlumbing Permit ApplicationSubmitted via Community Core; contractor registration with current DORA Plumbing license required

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Mechanical / HVAC Permit

Required for HVAC, gas line, and swamp cooler installations in La Salle, under the 2018 IMC/IFGC as currently enforced by the Town.

Reviewed 2026-07-06 · Source

Requirements

  • Governed by the 2018 IMC and 2018 IFGC as currently enforced by the Town
  • Plastic fuel gas piping must be installed a minimum of 18 inches below grade (local Chapter 18 amendment); fuel gas test pressure locally amended from 3 psig to 10 psig
  • Explicitly listed as requiring a permit on the Town's Building Permits page: HVAC systems, gas lines, water heaters, swamp coolers

Required documents

  • RequiredMechanical Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Roofing Permit (Re-Roof)

Required for roofing/re-roofing work in La Salle. Governed by the 2018 IRC/IBC as currently enforced.

Reviewed 2026-07-06 · Source

Requirements

  • Roof plan and material specifications submitted per Town/ProCode requirements
  • Explicitly listed as a permit-required project type on the Town's Building Permits page ('roofs')

Required documents

  • RequiredRoofing Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Roofing Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Demolition Permit

Required for demolition of structures in La Salle. Explicitly listed on the Town's Building Permits page.

Reviewed 2026-07-06 · Source

Requirements

  • Explicitly listed as a permit-required project type on the Town's Building Permits page ('demolition')
  • Subject to codified Chapter 18's Uniform Code for the Abatement of Dangerous Buildings where applicable to unsafe/dangerous structures

Required documents

  • RequiredDemolition Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeNo current published fee table — contact ProCode or Town Hall for a quote

Deck / Patio Permit

Required for deck and patio construction in La Salle. Explicitly listed on the Town's Building Permits page ('decks,' 'patios').

Reviewed 2026-07-06 · Source

Requirements

  • Explicitly listed as a permit-required project type on the Town's Building Permits page
  • Foundation/footing elements, where applicable, subject to the same local engineered-foundation amendments as new construction if structural

Required documents

  • RequiredDeck/Patio Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Deck/Patio Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Rooftop Solar / Photovoltaic Permit

Required for rooftop solar/photovoltaic installations in La Salle. The Town has adopted the Model Colorado Electric and Solar Ready Code, though this governs electric/solar-readiness in new construction rather than retrofit PV installation specifically; a standard electrical permit process applies to PV installation itself.

Reviewed 2026-07-06 · Source

Requirements

  • Electrical scope governed by the 2020 NEC as adopted by the Town
  • Installer must hold a current Colorado DORA State Electrical Board license, subject to the Town's contemporaneous review procedure
  • New construction is subject to the Model Colorado Electric and Solar Ready Code's electric/solar-readiness provisions (per HB22-1362), though this does not itself constitute a separate PV installation permit

Required documents

  • RequiredElectrical Permit Application — Solar/PV scopeSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (PV installation)Valuation-based; no current published fee table — contact ProCode or Town Hall for a quote

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Salle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/weld-county/la-salle/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 6070dd5

Reproducible from PermitBase’s version-controlled dataset, commit 6070dd5.