La Salle building permits

La Salle, Colorado — as published 2026-07-07.

Reviewed 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC) — per the Town of La Salle Building Permits page: 'The Town of LaSalle has adopted and is currently enforcing the 2018 International Codes, 2012 Energy Conservation Code, and 2020 National Electrical Code.'2018 International Residential Code (IRC)2018 International Mechanical Code (IMC)2018 International Plumbing Code (IPC)2018 International Fuel Gas Code (IFGC) (bundled under the page's 'International Codes' reference; not itemized by individual code title on the live page)2012 International Energy Conservation Code (IECC) — the live page names this specifically as '2012 Energy Conservation Code,' an older cycle than the 2018 base I-Codes it is paired with2020 National Electrical Code (NEC)2025 Colorado Wildfire Resiliency Code (Colorado Division of Fire Prevention and Control model code, dfpc.colorado.gov/WRCB) — listed as adopted on the Town's Building Permits pageModel Colorado Electric and Solar Ready Code (Colorado Energy Office, energyoffice.colorado.gov/building-energy-codes-toolkit) — listed as adopted on the Town's Building Permits pageNote on document currency and code-cycle discrepancy: the Town's Municode-codified Chapter 18 (Building Regulations), as of this review, still recites the 2003 IBC/IRC/IPC/IMC/IFGC, 1999 NEC, and 1997 Uniform Code for Abatement of Dangerous Buildings, with a 1977/1978-vintage Colorado energy standard — none of which match the 2018 I-Codes / 2012 IECC / 2020 NEC the Town's actively-maintained Building Permits webpage states it is 'currently enforcing.' Consistent with this corpus's established pattern (e.g. Vail), the live, actively-maintained Building Permits page is treated as the current governing statement of adopted codes, since Municode codification frequently lags the underlying adopting ordinances and La Salle's own current-enforcement statement is unambiguous and specific (exact code years named). The codified Chapter 18 text is retained here only as a source of durable local AMENDMENT language (definitions, frost depth, sleeping-room rules, refund provisions, fee-authorization mechanism) that is very likely still in force, since local amendments of this kind are typically carried forward from cycle to cycle rather than dropped, but the umbrella code EDITIONS themselves follow the live page.Note on HB22-1362 (statewide energy floor, window July 2023-July 2026): the Town's stated 2012 IECC base energy code edition does NOT itself meet HB22-1362's requirement that jurisdictions updating their code during this window adopt at least the 2021 IECC. However, the Town's Building Permits page separately lists the 'Model Colorado Electric and Solar Ready Code' as adopted alongside the 2025 Colorado Wildfire Resiliency Code — meaning La Salle appears to have layered on the HB22-1362 electric/solar-ready provisions as a standalone addition without upgrading its underlying energy-code base edition to 2021 IECC. This is reported honestly as observed; this file does not assume full HB22-1362 compliance, only that the electric/solar-ready model code specifically has been adopted per the Town's own published list.MAJOR RE-CHASE UPDATE, 2026-07-23 — Municode reversal: this file's prior methodology (see the two notes above) treated the Town's Municode-hosted codification as a stale 2003-era snapshot and deferred to the live Building Permits webpage for current code editions. A direct re-chase of library.municode.com/co/lasalle on 2026-07-23 found this assumption is NO LONGER CORRECT: La Salle's Municode codification is now current through Ordinance No. 5-2026 (enacted 3-24-2026), online content updated 7-1-2026, and Chapter 18 was comprehensively overhauled by Ordinance No. 19-2025 (adopted 12-9-2025) — confirmed by reading each article's adoption section directly: Sec. 18-18 now adopts the 2024 IBC (not 2018), Sec. 18-43 the 2023 NEC (not 2020), Sec. 18-68 the 2024 IPC (not 2018), Sec. 18-93 the 2024 IMC (not 2018), Sec. 18-143 the 2024 IRC (not 2018), and Sec. 18-166 the 2024 IECC (not 2012 — which would also resolve the HB22-1362 gap flagged in the note above, since 2024 IECC exceeds the 2021 IECC statewide floor). Chapter 18 was also restructured into 16 articles, adding new Article IX (2024 International Fire Code), Article XI (International Property Maintenance Code), Article XII (International Existing Building Code), Article XIII (International Swimming Pool and Spa Code), and Article XVI (Graywater Systems) — none of which are reflected in the Town's own Building Permits webpage, which as of this same re-chase (2026-07-23) still states only '2018 International Codes, 2012 Energy Conservation Code, and 2020 National Electrical Code.' The two Town-controlled channels now directly conflict, and the codified ordinance (more recently dated, and the Town's actual governing law) appears to be the accurate one, while the informational webpage appears to be the stale one — the reverse of this file's original assumption. Local-amendment LANGUAGE spot-checked against the new codification (120 sq ft accessory-structure exemption, 180-day permit expiration/half-fee renewal, 80% refund provisions, sleeping-room definition) was found carried forward unchanged into the 2024-edition articles, so those specific amendment provisions remain reliable. However, a full re-verification of every permitType's code-edition citations, and of the five newly-added articles, was OUT OF SCOPE for this partial-chase pass (which targeted only fee/timeline gaps) and should be treated as a distinct, dedicated follow-up chase rather than assumed complete. Sources: https://library.municode.com/co/lasalle (Chapter 18, Article II Sec. 18-18; Article III Sec. 18-43; Article IV Sec. 18-68; Article V Sec. 18-93; Article VII Sec. 18-143; Article VIII Sec. 18-166 — all citing Ord. No. 19-2025, 12-9-2025).

Permit types & fees

Residential Building Permit (New Construction)

Required for new single-family/duplex construction in the Town of La Salle. Reviewed under the 2018 IRC/IBC as currently enforced by the Town, plus the 2012 IECC energy provisions and local Chapter 18 amendments (engineered foundation/soils report requirement, stud/joist spacing, egress and sleeping-room definitions). Plan review and inspections are performed by ProCode Inc. (SAFEbuilt) under contract to the Town.

Reviewed 2026-07-06 · Source

Requirements

  • Plans must comply with the 2018 IRC/IBC as currently enforced by the Town, the 2012 IECC, and the 2020 NEC
  • Foundation design and construction drawings must be stamped by a Colorado-registered professional engineer or licensed architect, based on an engineer's soils report (per codified Chapter 18 IRC local amendment)
  • A site certification prepared by a State-licensed professional engineer or land surveyor is required for new Group R Division 3 (single-family/duplex) occupancies prior to certificate of occupancy
  • Floor joists spaced a maximum of 19.2 inches on center, or engineered to an L/480 deflection limit; exterior and load-bearing wall studs spaced no more than 16 inches on center
  • Electrical and plumbing contractors must hold current Colorado DORA (State Electrical Board / State Plumbing Board) licenses, registered with the Town/ProCode and subject to contemporaneous license verification per the Colorado Chapter ICC 'Procedure for Contemporaneous Reviews of Electrical and Plumbing Licenses' (HB19-1086, SB19-156)
  • Application submitted through the Town's Community Core online permitting system; a hard copy of reviewed/stamped plans must be kept on the job site — this remains the applicant's responsibility even after electronic approval

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Town of La Salle's Community Core online permitting portal
  • RequiredStamped Structural/Foundation PlansFoundation plans stamped by a Colorado-registered engineer or licensed architect, based on an engineer's soils report
  • RequiredSite CertificationRequired for new single-family/duplex (Group R Division 3) occupancies prior to certificate of occupancy, prepared by a State-licensed engineer or land surveyor

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based (labor + materials + profit, including electrical/plumbing scope); no current numeric valuation-tier fee table is published by the Town or ProCode as of this review — contact ProCode (970-305-3161) or Town Hall (970-284-6931) for a project-specific quote. Codified Chapter 18 (current codification renumbers this Sec. 18-24, 'Fees') references 'the current fee schedule contained in the 2003 International Building Code' as amendable by Town Board resolution, but no such current resolution is published online. Re-chased 2026-07-23: confirmed live via Municode's CURRENT codification (library.municode.com/co/lasalle, codified through Ordinance No. 19-2025, adopted 12/9/2025 — verified this is not a stale snapshot) that Sec. 18-24 is unchanged and still delegates to the 2003 IBC schedule/board-resolution mechanism; also checked ProCode's LaSalle community resource page (safebuilt.com/about/our-companies/procode/la-salle, dateModified 2026-03-09) directly for a fee handout among its ~18 published documents — none exists. Gap is durable, not a stale-codification artifact.
Construction Use Tax2% of total material costPer the Town's Building Permits page: 'The Town also has a 2% use tax on the total cost of the material.'
Credit Card Processing Fee$3.00 per phone transactionCredit card transactions are not accepted above $350.00 total

Residential Addition / Remodel Permit

Required for additions, basement refinishes, and interior remodels to existing residential structures in La Salle. Reviewed under the 2018 IRC as currently enforced, with a lighter document set than new construction for remodels not involving structural changes.

Reviewed 2026-07-06 · Source

Requirements

  • Additions and basement refinishes require full compliance with the 2018 IRC as enforced by the Town
  • Structural changes (wall removal, new foundation elements) require engineer/architect-stamped plans
  • Electrical/plumbing/mechanical scope within an addition or remodel requires a licensed, Town-registered contractor holding a current Colorado DORA license
  • Application submitted via Community Core online permitting system

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via Community Core
  • OptionalStructural Plans (if applicable)Required if the scope includes new foundation work or removal of load-bearing elements
  • OptionalResidential One-Story Addition — Building Guide (Colorado Chapter ICC, via ProCode)Generic Colorado Chapter ICC plan-submittal guide for single-family one-story additions, hosted live on ProCode's LaSalle community resource page as of this review; recommended reading, not itself a required submittal form
  • OptionalResidential Basement Finish — Building Guide (Colorado Chapter ICC, via ProCode)Generic Colorado Chapter ICC plan-submittal guide for basement finishes covering egress, dropped-ceiling height, and smoke/CO alarm placement, hosted live on ProCode's LaSalle community resource page as of this review

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based (labor + materials + profit); no current published valuation-tier table — contact ProCode or Town Hall for a project-specific quote. Re-chased 2026-07-23 via Municode's current codification (Sec. 18-24, current through Ordinance No. 19-2025, 12/9/2025) and ProCode's LaSalle community resource page — no numeric schedule found on either live channel.
Construction Use Tax2% of total material cost

Electrical Permit

Verified

Required for electrical installation, alteration, or repair in La Salle, issued locally by the Town (via ProCode) under the 2020 NEC as adopted. Electricians must hold a current Colorado State Electrical Board (DORA) license, which the Town/ProCode verifies contemporaneously per the standard Colorado Chapter ICC procedure (SB19-156).

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2020 NEC as currently enforced by the Town
  • Electricians must register with the Town/ProCode before applying for a permit and must provide current Colorado DORA State Electrical Board license credentials at registration
  • Town/ProCode staff verify DORA license status contemporaneously using DORA's licensing service; inspectors may also conduct field reviews of electricians and apprentices on job sites, with emphasis on large multifamily/commercial sites
  • Non-compliance discovered during a contemporaneous review may result in a complaint filed with the State Electrical Board per C.R.S. Title 12, Article 115

Required documents

  • RequiredElectrical Permit ApplicationSubmitted via Community Core; contractor registration with current DORA license required

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeValuation-based (installation labor + materials + profit); no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair in La Salle, issued locally by the Town (via ProCode) under the 2018 IPC as adopted, with local frost-depth and sewer-depth amendments carried forward from codified Chapter 18. Plumbers must hold a current Colorado State Plumbing Board (DORA) license, contemporaneously verified by the Town/ProCode per HB19-1086.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IPC as currently enforced by the Town
  • Exterior water supply piping required not less than 6 inches below the frost line and not less than 48 inches below finish grade (local Chapter 18 amendment)
  • Plumbers must register with the Town/ProCode before applying for a permit and provide current Colorado DORA State Plumbing Board license credentials, subject to contemporaneous verification
  • Two dedicated documents on the Town's Building Permits page address plumbing contemporaneous review specifically (2019 SOP and a general contemporaneous-reviews procedure)

Required documents

  • RequiredPlumbing Permit ApplicationSubmitted via Community Core; contractor registration with current DORA Plumbing license required

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote
Construction Use Tax2% of total material cost

Mechanical / HVAC Permit

Verified

Required for HVAC, gas line, and swamp cooler installations in La Salle, under the 2018 IMC/IFGC as currently enforced by the Town.

Verified 2026-07-23 · Source

Requirements

  • Governed by the 2018 IMC and 2018 IFGC as currently enforced by the Town
  • Plastic fuel gas piping must be installed a minimum of 18 inches below grade (local Chapter 18 amendment); fuel gas test pressure locally amended from 3 psig to 10 psig
  • Explicitly listed as requiring a permit on the Town's Building Permits page: HVAC systems, gas lines, water heaters, swamp coolers

Required documents

  • RequiredMechanical Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote. Re-chased 2026-07-23 via Municode's current codification (Sec. 18-93/18-99, current through Ordinance No. 19-2025, 12/9/2025) and ProCode's LaSalle community resource page — no numeric schedule published on either live channel.
Construction Use Tax2% of total material cost

Roofing Permit (Re-Roof)

Verified

Required for roofing/re-roofing work in La Salle. Governed by the 2018 IRC/IBC as currently enforced by the Town's informational webpage (the Town's underlying Municode codification was found 2026-07-23 to have been updated to the 2024 IRC/IBC by Ordinance No. 19-2025, adopted 12/9/2025 — see this file's top-level codesAdopted note). Processed as an OVER-THE-COUNTER permit (no formal plan-review queue) per ProCode/SAFEbuilt's published Counter Permits list.

Verified 2026-07-23 · Source

Requirements

  • Roof plan and material specifications submitted per Town/ProCode requirements
  • Explicitly listed as a permit-required project type on the Town's Building Permits page ('roofs')
  • Re-roofing is processed as an OVER-THE-COUNTER permit type per ProCode/SAFEbuilt's live 'Counter Permits' handout — no formal plan review is queued for straightforward re-roofs
  • Per the Colorado Chapter ICC 'Single Family Residential Re-roofing' guide (hosted live on ProCode's LaSalle community resource page): the permit holder must call for required inspection(s); homeowners may self-perform re-roofing; roof sheathing must be repaired/replaced where warped, cracked, or delaminated; new underlayment (minimum 15# asphalt-saturated felt over a dry deck) is required on complete tear-offs, with one layer for slopes ≥4:12, 19-inch lapped starter courses for slopes between 2:12 and 4:12, and modified bitumen permitted below 2:12; fasteners must penetrate a minimum of 3/4 inch into the decking; a cricket or saddle is required on the ridge side of any chimney wider than 30 inches; roof jacks/vents must be raised to the new roof level and replaced if deteriorated

Required documents

  • RequiredRoofing Permit ApplicationSubmitted via Community Core
  • OptionalSingle Family Residential Re-roofing — Building Guide (Colorado Chapter ICC, via ProCode)Live document found 2026-07-23 at safebuilt.com/wp-content/uploads/2024/04/Single-Family-Residential-Re-roof.pdf, hosted on ProCode's LaSalle community resource page; covers underlayment, fastener, sheathing-prep, and chimney-cricket requirements for common re-roof scopes. Functionally replaces the Town's own 404'd 'Roofing Requirements' document (lasalletown.com/DocumentCenter/View/337, confirmed still dead via Wayback CDX — every capture since 2019 is a 301/redirect, never a live 200 render, so it is not recoverable even from archive)
  • OptionalResidential Roofing Bill of Rights (via ProCode)Scanned 4-page PDF (safebuilt.com/wp-content/uploads/2024/04/Residential-Roofing-Bill-of-Rights.pdf, 2014-vintage scan, no extractable text layer) hosted live on ProCode's LaSalle community resource page. Existence and hosting confirmed 2026-07-23; specific content not transcribed here since it is image-only and OCR was out of this review's scope — request directly from ProCode if consumer-protection roofing-contract terms are needed

Fee schedule

Fee typeAmountNotes
Roofing Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote. Re-chased 2026-07-23 via Municode's current codification and ProCode's LaSalle community resource page — no numeric schedule published on either live channel, consistent with every other permit type in this file.
Construction Use Tax2% of total material cost

Demolition Permit

Required for demolition of structures in La Salle. Explicitly listed on the Town's Building Permits page.

Reviewed 2026-07-06 · Source

Requirements

  • Explicitly listed as a permit-required project type on the Town's Building Permits page ('demolition')
  • Subject to codified Chapter 18's Uniform Code for the Abatement of Dangerous Buildings where applicable to unsafe/dangerous structures

Required documents

  • RequiredDemolition Permit ApplicationSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeNo current published fee table — contact ProCode or Town Hall for a quote. Re-chased 2026-07-23: checked Municode's current codification (Chapter 18, Article VI — Uniform Code for the Abatement of Dangerous Buildings, still the unamended 1997 edition even under the Town's Dec-2025 code update, Ord. No. 19-2025 — that article governs unsafe/dangerous-building abatement procedure, not a routine voluntary-demolition permit fee) and ProCode's LaSalle community resource page's full ~18-document list — no demolition-specific document or fee figure exists on either live channel.

Deck / Patio Permit

Verified

Required for deck and patio construction in La Salle. Explicitly listed on the Town's Building Permits page ('decks,' 'patios').

Verified 2026-07-23 · Source

Requirements

  • Explicitly listed as a permit-required project type on the Town's Building Permits page
  • Foundation/footing elements, where applicable, subject to the same local engineered-foundation amendments as new construction if structural

Required documents

  • RequiredDeck/Patio Permit ApplicationSubmitted via Community Core
  • OptionalResidential Uncovered Decks and Porches — Building Guide (Colorado Chapter ICC, via ProCode)Live document found 2026-07-23 at safebuilt.com/wp-content/uploads/2024/04/Residential-Uncovered-Decks-and-Porches.pdf, hosted on ProCode's LaSalle community resource page; covers plot-plan and construction-detail submittal for uncovered decks/porches
  • OptionalUncovered Decks Joist Table (via ProCode)Live joist-size/spacing/span and beam-span reference table (safebuilt.com/wp-content/uploads/2024/04/Uncovered-Decks-Joist-Table.pdf) hosted on ProCode's LaSalle community resource page, derived from 2012 IRC Table 502.3.1 (Hem-Fir #2 / Redwood, 40/10 psf live/dead loading)
  • OptionalResidential Patio Covers & Carports — Building Guide (Colorado Chapter ICC, via ProCode)Live document (safebuilt.com/wp-content/uploads/2024/04/Residential-Patio-Covers-Carports.pdf) hosted on ProCode's LaSalle community resource page
  • OptionalResidential Enclosing Existing Patio Covers / Enclosed Patio (via ProCode)Two related live documents (safebuilt.com/wp-content/uploads/2024/04/Residential-Enclosing-Existing-Patio-Covers.pdf and .../Enclosed-Patio.pdf) hosted on ProCode's LaSalle community resource page, for converting an existing covered patio into an enclosed space

Fee schedule

Fee typeAmountNotes
Deck/Patio Permit FeeValuation-based; no current published fee table — contact ProCode or Town Hall for a quote. Re-chased 2026-07-23 via Municode's current codification and ProCode's LaSalle community resource page — no numeric schedule published on either live channel.
Construction Use Tax2% of total material cost

Rooftop Solar / Photovoltaic Permit

Verified

Required for rooftop solar/photovoltaic installations in La Salle. The Town has adopted the Model Colorado Electric and Solar Ready Code, though this governs electric/solar-readiness in new construction rather than retrofit PV installation specifically; a standard electrical permit process applies to PV installation itself.

Verified 2026-07-20 · Source

Requirements

  • Electrical scope governed by the 2020 NEC as adopted by the Town
  • Installer must hold a current Colorado DORA State Electrical Board license, subject to the Town's contemporaneous review procedure
  • New construction is subject to the Model Colorado Electric and Solar Ready Code's electric/solar-readiness provisions (per HB22-1362), though this does not itself constitute a separate PV installation permit

Required documents

  • RequiredElectrical Permit Application — Solar/PV scopeSubmitted via Community Core

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (PV installation)Statewide valuation-based schedule under C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, which any Colorado local government (including La Salle) may scale up to 1.15x — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113La Salle has no published PV-specific fee table of its own (confirmed 2026-07-20 by re-checking the live Building Permits page and full-text search for solar/photovoltaic, as previously documented), but Colorado electrical inspections are a matter of statewide concern under C.R.S. § 12-23-117 — no local government may charge more than 1.15x the DORA State Electrical Board's own fee schedule, or impose any other electrical fee or charge. That statewide base schedule (townoflarkspur.org/media/2901, hosted live by the Town of Larkspur, CO, printed with DORA's own Denver address/phone) sets Section B "Commercial and other fees" (which Larimer County's current Table 1-E, larimer.org/sites/default/files/2020_electrical_fee_table.pdf, explicitly confirms includes solar) at $100 base for valuation up to $2,000, plus $10/thousand above. This governs the ceiling and formula for whatever La Salle/ProCode ultimately charges, even though La Salle's own specific multiplier was not independently published.

EV Charger / EVSE Permit

Electric vehicle charging equipment (EVSE) installation in La Salle is processed as ordinary electrical work, issued locally by the Town (via its contracted plan-review/inspection agency, ProCode Inc., a SAFEbuilt company) under the 2020 NEC as adopted — the same mechanism documented on this file's general Electrical Permit entry. The Town's Building Permits page does not itemize EV chargers, EVSE, or charging stations as their own named project type, and no current numeric building-permit fee schedule (valuation-tier table) of any kind is published anywhere on the Town's website; the page states only the calculation method (valuation-based, including labor/materials/profit) plus a flat 2% construction use tax on material cost.

Reviewed 2026-07-20 · Source

Requirements

  • Electrical permit required for EVSE/EV charger circuit installation, alteration, or repair, governed by the 2020 NEC as currently enforced by the Town
  • Electricians must register with the Town/ProCode before applying for a permit and must provide current Colorado DORA State Electrical Board license credentials at registration
  • Town/ProCode staff verify DORA license status contemporaneously using DORA's licensing service
  • As a town of roughly 3,500 residents, La Salle falls below the population threshold (10,000) that makes a Colorado municipality a 'covered municipality' under HB24-1173 (Electric Vehicle Charging System Permits Act), so it was not required to take a Dec. 31, 2025 compliance action under that law

Required documents

  • RequiredElectrical Permit ApplicationSubmitted via Community Core; contractor registration with current DORA license required

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (EVSE circuit)Valuation-based (installation labor + materials + profit); no current published fee table exists for any permit type on the Town's site — contact ProCode or Town Hall for a project-specific quote. Re-chased 2026-07-20: the Town's live Building Permits page does not name 'EV charger,' 'EVSE,' or 'charging station' as its own itemized project type, so this is modeled as ordinary electrical work rather than a distinct fee category. Also checked whether a Colorado State Electrical Board fee schedule could be cited as a fallback (Colorado law caps local electrical fees at 1.15x the state's own annually-set schedule) -- the Board's current Rules and Regulations (3 CCR 710-1, Colorado Secretary of State) govern licensing and NEC adoption but do not themselves publish the dollar fee table, and DORA's own fee-schedule web pages return HTTP 403 to automated fetches, so no current, citable state figure could be located either. Re-chased 2026-07-23: Municode's current codification (Sec. 18-48, current through Ordinance No. 19-2025, 12/9/2025) reconfirms electrical permit fees are set 'from time to time by resolution of the board of trustees and set forth in the town fee schedule' rather than being codified — matching every other trade in this file. No numeric figure exists on any live channel checked.
Construction Use Tax2% of total material cost

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Salle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/weld-county/la-salle/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.