Pierce building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Pierce, Colorado.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
144 Main Street, Pierce, CO 80650 (PO Box 57)
Phone
970-834-2851
Office hours
Town Hall main line (970) 834-2851, fax (970) 834-2755, per the Town's Building Permit Application form. The Town's general Contact Us page lists the same address/phone but no posted office hours; the Planning and Zoning department directs all building-permit, addition, new-construction, annexation, and remodel questions to the Town Hall main line. Inspections (not permit intake) are scheduled directly with SAFEbuilt Inc. at 970-674-1036 or 1-866-671-1036, calls before 7:30 a.m. receive same-day inspection, after 7:30 a.m. scheduled for the next working day. Note: the Contact Us page renders the street address as '144 Main Avenue' while the Town Hall page and the Building Permit Application PDF both render it as '144 Main St./144 Main Street' — treated as the same address, minor inconsistency in the Town's own CMS.

Published scheduling rules

  • Pierce is a small statutory town in Weld County that contracts plan review and inspections to SAFEbuilt Inc.; permit intake, application questions, and fee payment go through Town Hall (970-834-2851), while inspection SCHEDULING is a separate call to SAFEbuilt directly (970-674-1036 or 1-866-671-1036, before 7:30 a.m. for same-day service). (General)
  • Permits become null and void if work is not ready for first inspection within 180 days of issuance, or if more than 180 days elapse between inspections, or if work substantially ceases — track this deadline carefully since Pierce's inspection scheduling runs through a separate contracted provider (SAFEbuilt) rather than Town Hall. (General)

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour, per 30-inch minimum frost line; lot corners must be clearly staked for setback inspections

  2. 2

    Framing

    Structural framing complete before cover; all concrete reinforcing steel must be in place before inspection

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes; required before Certificate of Occupancy issuance

Applies to: Residential Addition / Remodel Permit

  1. 1

    Rough Frame / Foundation (additions with new footings only)

    Before concealment; foundation inspection only if new footings are part of scope

  2. 2

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment, if applicable to project scope

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Commercial Tenant Finish / Improvement Permit

  1. 1

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  2. 2

    Final Inspection

    All work complete per approved plans and applicable commercial codes

Applies to: Deck / Patio Cover / Carport Permit

  1. 1

    Footing/Foundation (if new footings required)

    Before concrete pour, per 30-inch minimum frost line; lot corners must be clearly staked for setback inspections

  2. 2

    Final Inspection

    Structure complete, guardrails/stair compliance verified where applicable

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    EVSE circuit wiring and panel/breaker installed before concealment

  2. 2

    Final Inspection

    Charger installed, panel labeled, circuit energized and verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, gas piping, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Rooftop Solar / Photovoltaic Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified

Final inspection only: Demolition Permit, Re-Roof Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pierce building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Pierce building permits

Get alerts for Pierce

We'll email you when Pierce's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.