EV Charger / EVSE Permit in Pierce, Colorado
Pierce has no EV-charger-specific permit type or fee line. An EV charger (EVSE) circuit is electrical work and is permitted the same way as any other electrical modification in Pierce: on the Town's combined Building Permit Application (Electrical Contractor fields), governed by the 2023 NEC as adopted per the Town's Design Criteria page, and billed under the same 'UBC fee schedule + $30 or 30% (greater)' combined Building Permit fee structure — the Town's Fee Schedule does not publish a standalone electrical (or EV-specific) fee table. Separately, Pierce's Design Criteria page lists 'Electric Ready, Solar Ready, and EV Ready' as a State Code Requirement consistent with Colorado's HB22-1362 statewide energy-code floor, which requires new construction to be wired EV-ready (a distinct code-compliance requirement, not a separate charger-installation permit or fee).
Verified 2026-07-20 · Source
When you need this permit
- Governed by the 2023 NEC as adopted by the Town of Pierce
- Apply on the Town's combined Building Permit Application, completing the Electrical Contractor Name, Phone, and Colorado contractor license number fields Contractor
- New residential/commercial construction must meet the Town's 'Electric Ready, Solar Ready, and EV Ready' state code requirement (Colorado HB22-1362 floor) independent of any later EVSE-installation permit
- Homeowners may perform electrical work at their own residence per Colorado state rules; otherwise a licensed Electrical Contractor is required Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
EVSE circuit wiring and panel/breaker installed before concealment
- 2
Final Inspection
Charger installed, panel labeled, circuit energized and verified
See the full Pierce inspection guide — scheduling & re-inspection fees →
Tips
- There is no standalone EV-charger permit in Pierce — apply using the Town's combined Building Permit Application (Electrical Contractor fields), the same as any other electrical work.
- Don't confuse the Town's 'EV Ready' new-construction wiring requirement (Colorado HB22-1362 energy-code floor) with a charger-installation permit — the EV-ready provision applies to new buildings at construction time, while an actual charger install in an existing home still needs its own electrical permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pierce building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Pierce
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Pierce project checklist
Describe your project once and get every permit, document, and fee it triggers in Pierce — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →