This is PermitBase’s published record for Eagle as of 2026-06-29. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Eagle building permits
VerifiedEagle, Idaho — as published 2026-06-29.
Verified 2026-06-29 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwellings, accessory dwelling units, detached garages and shops, sheds, and additions in Eagle. All residential and commercial structures — and appurtenances connected or attached — require a permit for new construction, additions, alterations, relocation, enlargement, replacement, repair, or demolition. Plan review turnaround for single-family homes, ADUs, detached garages/shops, and sheds is currently 6 weeks (high-volume notice published by the Building Division). Applications submitted via the Contractor Portal or in person at 660 E Civic Lane.
Verified 2026-06-29 · Source
Requirements
- Building permit required for all new single-family dwellings, additions, accessory dwelling units, detached garages, shops, and sheds
- Submit permit application with all required documentation and building plans for review
- Plans checked for compliance with 2018 IRC and applicable codes; plan reviewer red-marks issues or calls to discuss corrections
- New Residential and Addition Checklist Master 2023 Building Permit Requirements must accompany the application
- Contractor Registration Verification Form required for contractors new to Eagle
- Pole barns/post-frame buildings require a stamped engineered design from a Licensed Design Professional or Licensed Professional Engineer
- If heated/cooled, a separate mechanical permit required and work must be performed by an Idaho state-licensed contractor
Required documents
- RequiredNew Residential Building/Addition Submittal ChecklistEagle's required checklist documenting all required plan set elements for residential permits; available at cityofeagle.org/259/Residential-Building-Permit-Submittal-Re
- RequiredNew Residential and Addition Check List Master 2023 (PDF)Master building permit requirements checklist; linked from the Residential Building Permit Submittal Requirements page
- OptionalContractor Registration Verification FormRequired for contractors new to Eagle; available at cityofeagle.org/DocumentCenter/View/214
- RequiredConstruction Drawings (site plan, foundation, floor plan, framing, elevations, sections, details)Full plan set showing code compliance per 2018 IRC; structural drawings stamped by Idaho licensed engineer if required
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — new construction (valuation-based per ICC Building Valuation Data Aug 2022) | Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260 | Eagle Building Department Fee Schedule (Resolution 23-34, effective Jan 2023). Square-foot construction costs are adopted from ICC Building Valuation Data dated August 2022 (cityofeagle.org/DocumentCenter/View/7455). Use Residential Permit Fee Estimator (XLS) at cityofeagle.org/DocumentCenter/View/563. |
| Re-inspection Fee | $65.00 minimum per occurrence | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Plan Checking | $65.00 minimum plus $65.00 per hour or portion thereof | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Demolition Permit | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
Commercial Building Permit (New Construction / Tenant Improvement)
VerifiedRequired for all new commercial and industrial buildings, multi-family dwellings (three or more units), tenant improvements, remodels, and change-of-occupancy projects in Eagle. Governed by the 2018 IBC. Plan review turnaround is currently 6–8 weeks (high-volume notice published by Eagle Building Division). Design Review approval from Planning & Zoning is required before applying for commercial permits. Applications submitted via the Contractor Portal or in person.
Verified 2026-06-29 · Source
Requirements
- Design Review approval from Eagle Planning & Zoning Department required before building permit application
- Submit commercial building permit application with Commercial Certificate of Project Value Form (required)
- Contractor Registration Verification Form required for contractors new to Eagle
- Design Professional in Responsible Charge Form required if applicable
- Foundation-only permits available for commercial projects (not residential)
- Tenant improvements and remodels use the Tenant Improvements & Remodels Permit Application
- Change of occupancy uses the Change of Occupancy and/or Tenant ONLY Permit Application
Required documents
- RequiredNew Commercial Buildings, Additions & Multi-Family Permit ApplicationDownloadable PDF or online fillable form; available at cityofeagle.org/2153/Building-Permits-Applications-Forms
- RequiredCommercial Certificate of Project Value FormRequired to be submitted with every commercial permit application
- OptionalContractor Registration Verification FormRequired for contractors new to Eagle
- OptionalDesign Professional in Responsible Charge FormRequired when applicable (licensed design professional overseeing the work)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial / Industrial building permit (valuation-based, Other Installations table) | Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260 | Eagle Building Department Fee Schedule (Resolution 23-34, Jan 2023). Use the Commercial Permit Fee Estimator (XLS) at cityofeagle.org/DocumentCenter/View/212. |
| Re-inspection Fee | $65.00 minimum per occurrence | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Multi-Family (Duplex, contractors only) | $260.00 per mechanical permit for new residential multi-family duplex | Mechanical section of Eagle Building Department Fee Schedule (Resolution 23-34); building structural fees follow the valuation table |
Electrical Permit
VerifiedRequired for all electrical installations, alterations, and repairs in Eagle, including new wiring, panel changes, service upgrades, and branch circuit additions. Work governed by the 2023 National Electrical Code (NEC/NFPA 70). Apply through the Eagle Contractor Portal. Payment by check, cash, or credit card; permit issued when paid in full.
Verified 2026-06-29 · Source
Requirements
- All electrical installation, change, or repair of any hard-wired system requires a permit
- Apply through the Eagle Contractor Portal (eagle_permit.portal.iworq.net)
- Applications may also be faxed, emailed, mailed, or brought in to the Building Department
- Permit issued when paid in full — payment by check, cash, or credit card
Required documents
- RequiredElectrical Permit ApplicationSubmitted through the Eagle Contractor Portal or in person at 660 E Civic Lane
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential Single Family — up to 1,500 sq ft | $130.00 | Eagle Building Department Fee Schedule (Resolution 23-34, Jan 2023) — Electrical Fees section |
| New Residential Single Family — 1,501 to 2,500 sq ft | $195.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| New Residential Single Family — 2,501 to 3,500 sq ft | $260.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| New Residential Single Family — 3,501 to 4,500 sq ft | $325.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| New Residential Single Family — over 4,500 sq ft | $325.00 plus $65.00 per additional 1,000 sq ft | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Existing Residential Base Fee | $65.00 base fee | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Small Works — cost not exceeding $200 | $45.00 basic fee | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Commercial / Industrial / Solar / Renewable Energy — cost up to $10,000 | Multiply by 2% plus $60.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Commercial / Industrial / Solar / Renewable Energy — cost $10,001 to $100,000 | Subtract $10,000, multiply by 1%, plus $260.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Commercial / Industrial / Solar / Renewable Energy — cost over $100,001 | Subtract $100,000, multiply by 0.5%, plus $1,160.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Re-inspection / Requested Inspections | $65.00 minimum per occurrence | Eagle Building Department Fee Schedule (Resolution 23-34) |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, air conditioning, fuel gas piping, and related mechanical installations in Eagle residential and commercial properties. Covers furnaces, A/C, heat pumps, gas fireplaces, gas lines, ductwork, hydronic flooring, and similar work. Governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel and Gas Code (IFGC). Apply through the Contractor Portal.
Verified 2026-06-29 · Source
Requirements
- Install, change, or repair any part of a heating or cooling system
- Gas piping installation or modification
- Fireplace installation (gas or electric)
- Apply through the Eagle Contractor Portal or in person; permit issued when paid in full
Required documents
- RequiredMechanical Permit ApplicationSubmitted through the Eagle Contractor Portal (eagle_permit.portal.iworq.net) or in person at 660 E Civic Lane
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential Single Family — Base Administrative Fee plus HVAC items | Base fee $65.00, plus $10.00 per HVAC item up to maximum square footage of the residential building | Eagle Building Department Fee Schedule (Resolution 23-34, Jan 2023) — Mechanical Fees section |
| New Residential Single Family — up to 1,500 sq ft | $130.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| New Residential Single Family — 1,501 to 2,500 sq ft | $195.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| New Residential Single Family — 2,501 to 3,500 sq ft | $260.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| New Residential Single Family — 3,501 to 4,500 sq ft | $325.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Existing Residential (retrofits, additions) — Base Administrative Fee | $65.00 base plus $10.00 for each duct, fireplace, HVAC equipment, or vent | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Fireplace (Gas or Electric) | $75.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Fireplace Installation (two inspections) | $130.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Hydronic Flooring | $65.00 plus $10.00 for each additional manifold | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Gas Line Base Administrative Fee | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Re-inspection Fee | $65.00 minimum | Eagle Building Department Fee Schedule (Resolution 23-34) |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Eagle residential and commercial properties, including water heaters, fixture additions, sewer/water service lines, backflow prevention devices, and lawn sprinklers. Governed by the 2017 Idaho State Plumbing Code (ISPC — IAPMO). Apply through the Eagle Contractor Portal.
Verified 2026-06-29 · Source
Requirements
- Repair, replace, relocate, or add to any plumbing system
- Water heater or water softener installation or replacement
- New plumbing fixtures or replacement fixtures
- Sewer line installation, water line installation, or combination
- Backflow prevention device installation
- Lawn sprinkler system installation
- Apply through the Eagle Contractor Portal or in person; permit issued when paid in full
Required documents
- RequiredPlumbing Permit ApplicationSubmitted through the Eagle Contractor Portal (eagle_permit.portal.iworq.net) or in person at 660 E Civic Lane
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| All plumbing permits — fees calculated from Verified Contract Price Table | Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260 | Eagle Building Department Fee Schedule (Resolution 23-34, Jan 2023) — Plumbing Fees section. Fees based on fair market project value (total labor, materials, equipment including overhead and profit). Not reducible for owner-supplied materials. |
| Water Heater / Water Softener | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Backflow Prevention Device | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Sewer Line Installation (base fee not applicable) | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Water Line Installation (base fee not applicable) | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Sewer and Water Combination (base fee not applicable) | $65.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Additional Fixtures Each (excluding garbage disposals and dishwashers) | $10.00 each | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Replacement Fixtures Each | $10.00 each | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Swimming Pools — Basic Fee (covers 3 required inspections) | $195.00 | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Multipurpose Fire Sprinklers and Domestic Water Supply System (1–2 family) | $65.00 or $4 per fire sprinkler head, whichever is greater | Eagle Building Department Fee Schedule (Resolution 23-34) |
| Re-inspection Fee | $65.00 minimum | Eagle Building Department Fee Schedule (Resolution 23-34) |
Fence and Retaining Wall Permit
VerifiedEagle has a tiered fence and retaining wall permit process depending on location (front yard/street, common lot, or other residential). Residential fences in any front yard or along any street require a Fence Permit from Planning & Zoning first; fences over 6 feet or retaining walls over 4 feet also require a building permit from the Building Division. Commercial fences and retaining walls of any height require Design Review. Fences under 6 feet height in other-than-front-yard locations generally do not require a building permit but must comply with Eagle City Code 8-3-3.
Verified 2026-06-29 · Source
Requirements
- Front yard / street residential fences: Fence Permit from Planning & Zoning required regardless of height (Design Review not required)
- Residential fences over 6 ft OR retaining walls over 4 ft in any residential location: building permit required from Building Division in addition to Planning & Zoning fence permit
- Common lot residential fences/retaining walls of any height: Design Review approval from Planning & Zoning required first; building permit required if fence over 6 ft or wall over 4 ft
- All other residential fences under 6 ft height and retaining walls under 4 ft height in non-front-yard/non-common-lot locations: no building permit required; must comply with Eagle City Code 8-3-3
- Commercial fences and retaining walls of any height: Design Review approval required first; building permit required for fences over 7 ft or retaining walls over 4 ft
Required documents
- RequiredFence Permit ChecklistFillable or PDF format; available at cityofeagle.org/DocumentCenter/View/4346 (fillable) or /View/1414 (PDF). Submitted to Planning & Zoning for the fence permit step.
- OptionalBuilding Permit Application for Commercial (when building permit required)Fillable or PDF; available at cityofeagle.org/DocumentCenter/View/4779 (fillable) or /View/4778 (PDF). Required when fence/wall height triggers a building permit.
- OptionalDesign Review Application (commercial or common lot)Required for all commercial fences/walls and common lot residential fences/walls; submitted to Planning & Zoning. Available at cityofeagle.org/DocumentCenter/View/235.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit for fence/retaining wall (when required) — valuation-based | Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660 | Eagle Building Department Fee Schedule (Resolution 23-34). Planning & Zoning fence permit fees are set by the P&Z Department separately. |
Sign Permit
VerifiedThe City of Eagle requires Design Review approval from Planning & Zoning for ALL signs located within Eagle city limits. After Design Review approval and the appeal period, Planning & Zoning issues the sign permit for signs without electrical. Signs with electrical components require a separate electrical permit from the Building Division, which must be obtained before the final sign permit is issued by Planning & Zoning.
Verified 2026-06-29 · Source
Requirements
- Design Review application required for ALL signs — submitted to the Planning & Zoning Department
- After Design Review approval, an appeal period must pass before proceeding
- Signs without electrical: Planning & Zoning issues sign permit after the appeal period — construction may then commence
- Signs with electrical: a separate electrical permit from the Building Division must be obtained after conditional Design Review approval, and proof provided to Planning & Zoning before the sign permit is issued
Required documents
- RequiredDesign Review Sign Board Level ChecklistAvailable at cityofeagle.org/DocumentCenter/View/235 (board-level) for larger or complex sign projects
- RequiredDesign Review Staff Level Sign ChecklistFillable or PDF format; available from the Sign Permits page at cityofeagle.org/1837/Sign-Permits. For most standard sign applications.
- OptionalDesign Review Special Portable Sign ChecklistFillable format; for portable/temporary sign applications
- OptionalElectrical Permit Application (for signs with electrical)Submitted to the Building Division through the Contractor Portal; required before final sign permit is issued by Planning & Zoning
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical permit for illuminated signs (commercial value-based) | Cost up to $10,000: multiply by 2% plus $60.00; cost $10,001–$100,000: subtract $10,000, multiply by 1%, plus $260.00 | Eagle Building Department Fee Schedule (Resolution 23-34) — Electrical Fees, Commercial/Industrial/Solar/Renewable Energy section. Planning & Zoning Design Review and sign permit fees are separate. |
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.