Eagle building permits

Verified

Eagle, Idaho — as published 2026-07-17.

Verified 2026-07-17 · Source

Codes adopted

2018 International Building Code (IBC) — effective January 1, 20212018 International Residential Code (IRC) — effective January 1, 20212018 International Energy Conservation Code (IECC) — Residential with State Amendments; effective January 1, 20212018 International Energy Conservation Code (IECC) — Commercial; effective January 1, 20212018 International Existing Building Code (IEBC) — effective January 1, 20212018 International Mechanical Code (IMC) — effective January 1, 20212018 International Fuel and Gas Code (IFGC) — effective January 1, 20212018 International Fire Code (IFC) — effective January 1, 20212023 National Electrical Code (NEC/NFPA 70) — adopted via Idaho Electrical Board2017 Idaho State Plumbing Code (ISPC — IAPMO) — effective January 1, 20211997 Uniform Code for the Abatement of Dangerous Buildings2018 International Urban-Wildland Interface Code

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family dwellings, accessory dwelling units, detached garages and shops, sheds, and additions in Eagle. All residential and commercial structures — and appurtenances connected or attached — require a permit for new construction, additions, alterations, relocation, enlargement, replacement, repair, or demolition. Plan review turnaround for single-family homes, ADUs, detached garages/shops, and sheds is currently 6 weeks (high-volume notice published by the Building Division). Applications submitted via the Contractor Portal or in person at 660 E Civic Lane.

Verified 2026-07-17 · Source

Requirements

  • Building permit required for all new single-family dwellings, additions, accessory dwelling units, detached garages, shops, and sheds
  • Submit permit application with all required documentation and building plans for review
  • Plans checked for compliance with 2018 IRC and applicable codes; plan reviewer red-marks issues or calls to discuss corrections
  • New Residential and Addition Checklist Master 2023 Building Permit Requirements must accompany the application
  • Contractor Registration Verification Form required for contractors new to Eagle
  • Pole barns/post-frame buildings require a stamped engineered design from a Licensed Design Professional or Licensed Professional Engineer
  • If heated/cooled, a separate mechanical permit required and work must be performed by an Idaho state-licensed contractor

Required documents

  • RequiredNew Residential Building/Addition Submittal ChecklistEagle's required checklist documenting all required plan set elements for residential permits; available at cityofeagle.org/259/Residential-Building-Permit-Submittal-Re
  • RequiredNew Residential and Addition Check List Master 2023 (PDF)Master building permit requirements checklist; linked from the Residential Building Permit Submittal Requirements page
  • OptionalContractor Registration Verification FormRequired for contractors new to Eagle; available at cityofeagle.org/DocumentCenter/View/214
  • RequiredConstruction Drawings (site plan, foundation, floor plan, framing, elevations, sections, details)Full plan set showing code compliance per 2018 IRC; structural drawings stamped by Idaho licensed engineer if required

Fee schedule

Fee typeAmountNotes
Building Permit — new construction (valuation-based per ICC Building Valuation Data Aug 2022)Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260Eagle Building Department Fee Schedule (Resolution 23-34, amended Dec 19, 2023 — document header reads 'Amended with Resolution 23-34, December 19, 2023', re-confirmed live 2026-07-16/17, fee figures unchanged). Square-foot construction costs are adopted from ICC Building Valuation Data dated August 2022 (cityofeagle.org/DocumentCenter/View/7455, confirmed still the live edition cited on the fee schedule as of the Dec 2023 amendment). Use Residential Permit Fee Estimator (XLS) at cityofeagle.org/DocumentCenter/View/563.
Re-inspection Fee$65.00 minimum per occurrenceEagle Building Department Fee Schedule (Resolution 23-34)
Plan Checking$65.00 minimum plus $65.00 per hour or portion thereofEagle Building Department Fee Schedule (Resolution 23-34)
Demolition Permit$65.00Eagle Building Department Fee Schedule (Resolution 23-34)

Commercial Building Permit (New Construction / Tenant Improvement)

Verified

Required for all new commercial and industrial buildings, multi-family dwellings (three or more units), tenant improvements, remodels, and change-of-occupancy projects in Eagle. Governed by the 2018 IBC. Plan review turnaround is currently 6–8 weeks (high-volume notice published by Eagle Building Division). Design Review approval from Planning & Zoning is required before applying for commercial permits. Applications submitted via the Contractor Portal or in person.

Verified 2026-07-17 · Source

Requirements

  • Design Review approval from Eagle Planning & Zoning Department required before building permit application
  • Submit commercial building permit application with Commercial Certificate of Project Value Form (required)
  • Contractor Registration Verification Form required for contractors new to Eagle
  • Design Professional in Responsible Charge Form required if applicable
  • Foundation-only permits available for commercial projects (not residential)
  • Tenant improvements and remodels use the Tenant Improvements & Remodels Permit Application
  • Change of occupancy uses the Change of Occupancy and/or Tenant ONLY Permit Application

Required documents

  • RequiredNew Commercial Buildings, Additions & Multi-Family Permit ApplicationDownloadable PDF or online fillable form; available at cityofeagle.org/2153/Building-Permits-Applications-Forms
  • RequiredCommercial Certificate of Project Value FormRequired to be submitted with every commercial permit application
  • OptionalContractor Registration Verification FormRequired for contractors new to Eagle
  • OptionalDesign Professional in Responsible Charge FormRequired when applicable (licensed design professional overseeing the work)

Fee schedule

Fee typeAmountNotes
Commercial / Industrial building permit (valuation-based, Other Installations table)Cost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260Eagle Building Department Fee Schedule (Resolution 23-34, amended Dec 19, 2023 per document header; fee figures re-confirmed live 2026-07-17, unchanged). Use the Commercial Permit Fee Estimator (XLS) at cityofeagle.org/DocumentCenter/View/212.
Re-inspection Fee$65.00 minimum per occurrenceEagle Building Department Fee Schedule (Resolution 23-34)
Multi-Family (Duplex, contractors only)$260.00 per mechanical permit for new residential multi-family duplexMechanical section of Eagle Building Department Fee Schedule (Resolution 23-34); building structural fees follow the valuation table

Electrical Permit

Verified

Required for all electrical installations, alterations, and repairs in Eagle, including new wiring, panel changes, service upgrades, and branch circuit additions. Work governed by the 2023 National Electrical Code (NEC/NFPA 70). Apply through the Eagle Contractor Portal. Payment by check, cash, or credit card; permit issued when paid in full.

Verified 2026-07-17 · Source

Requirements

  • All electrical installation, change, or repair of any hard-wired system requires a permit
  • Apply through the Eagle Contractor Portal (eagle_permit.portal.iworq.net)
  • Applications may also be faxed, emailed, mailed, or brought in to the Building Department
  • Permit issued when paid in full — payment by check, cash, or credit card

Required documents

  • RequiredElectrical Permit ApplicationSubmitted through the Eagle Contractor Portal or in person at 660 E Civic Lane

Fee schedule

Fee typeAmountNotes
New Residential Single Family — up to 1,500 sq ft$130.00Eagle Building Department Fee Schedule (Resolution 23-34, amended Dec 19, 2023 per document header) — Electrical Fees section; figure re-confirmed live 2026-07-17, unchanged
New Residential Single Family — 1,501 to 2,500 sq ft$195.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — 2,501 to 3,500 sq ft$260.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — 3,501 to 4,500 sq ft$325.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — over 4,500 sq ft$325.00 plus $65.00 per additional 1,000 sq ftEagle Building Department Fee Schedule (Resolution 23-34)
Existing Residential Base Fee$65.00 base feeEagle Building Department Fee Schedule (Resolution 23-34)
Small Works — cost not exceeding $200$45.00 basic feeEagle Building Department Fee Schedule (Resolution 23-34)
Commercial / Industrial / Solar / Renewable Energy — cost up to $10,000Multiply by 2% plus $60.00Eagle Building Department Fee Schedule (Resolution 23-34)
Commercial / Industrial / Solar / Renewable Energy — cost $10,001 to $100,000Subtract $10,000, multiply by 1%, plus $260.00Eagle Building Department Fee Schedule (Resolution 23-34)
Commercial / Industrial / Solar / Renewable Energy — cost over $100,001Subtract $100,000, multiply by 0.5%, plus $1,160.00Eagle Building Department Fee Schedule (Resolution 23-34)
Re-inspection / Requested Inspections$65.00 minimum per occurrenceEagle Building Department Fee Schedule (Resolution 23-34)

EV Charger / EVSE Permit (Electrical Permit)

Verified

Installation of an electric vehicle charging station in Eagle is electrical work, processed through the same Electrical Permit Application and Eagle Contractor Portal documented on this file's electrical-permit entry. The City of Eagle Building Department Fee Schedule (Resolution 23-34, amended 12/19/2023) — the full 2-page document was directly fetched and reviewed page-by-page this session — has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item under its Electrical Fees section. A dedicated Level 2 charger circuit added to an existing residence falls under the 'Existing Residential Base Fee' ($65.00), or the 'Small Works' basic fee ($45.00) if the work does not exceed $200 in cost and does not involve a change in service connections — the same electrical fee lines already documented on this file's electrical-permit entry.

Verified 2026-07-20 · Source

Requirements

  • All electrical installation, change, or repair of any hard-wired system requires a permit — same requirement already documented on this file's electrical-permit entry, governed by the 2023 NEC
  • Apply through the Eagle Contractor Portal (eagle_permit.portal.iworq.net); applications may also be faxed, emailed, mailed, or brought in to the Building Department
  • Confirmed directly against the full City of Eagle Building Department Fee Schedule PDF (Resolution 23-34): no distinct EV-charger/EVSE fee line exists anywhere in the Electrical Fees section
  • Permit issued when paid in full — payment by check, cash, or credit card

Required documents

  • RequiredElectrical Permit ApplicationSame application used for the file's general electrical-permit entry, submitted through the Eagle Contractor Portal or in person at 660 E Civic Lane

Fee schedule

Fee typeAmountNotes
Existing Residential Base Fee (typical dedicated EV charger circuit added to an existing home)$65.00 base feeEagle Building Department Fee Schedule (Resolution 23-34, amended Dec 19, 2023) — Electrical Fees section; directly confirmed via full-document review this session that no distinct EV-charger/EVSE line item exists
Small Works — cost not exceeding $200 and not involving a change in service connections$45.00 basic feeEagle Building Department Fee Schedule (Resolution 23-34)
Commercial / Industrial / Solar / Renewable Energy — cost up to $10,000 (if the charger install is billed on a project-value basis)Multiply by 2% plus $60.00Eagle Building Department Fee Schedule (Resolution 23-34) — same tiered schedule already documented on this file's electrical-permit entry

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, fuel gas piping, and related mechanical installations in Eagle residential and commercial properties. Covers furnaces, A/C, heat pumps, gas fireplaces, gas lines, ductwork, hydronic flooring, and similar work. Governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel and Gas Code (IFGC). Apply through the Contractor Portal.

Verified 2026-07-17 · Source

Requirements

  • Install, change, or repair any part of a heating or cooling system
  • Gas piping installation or modification
  • Fireplace installation (gas or electric)
  • Apply through the Eagle Contractor Portal or in person; permit issued when paid in full

Required documents

  • RequiredMechanical Permit ApplicationSubmitted through the Eagle Contractor Portal (eagle_permit.portal.iworq.net) or in person at 660 E Civic Lane

Fee schedule

Fee typeAmountNotes
New Residential Single Family — Base Administrative Fee plus HVAC itemsBase fee $65.00, plus $10.00 per HVAC item up to maximum square footage of the residential buildingEagle Building Department Fee Schedule (Resolution 23-34, amended Dec 19, 2023 per document header) — Mechanical Fees section; figure re-confirmed live 2026-07-17, unchanged
New Residential Single Family — up to 1,500 sq ft$130.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — 1,501 to 2,500 sq ft$195.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — 2,501 to 3,500 sq ft$260.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — 3,501 to 4,500 sq ft$325.00Eagle Building Department Fee Schedule (Resolution 23-34)
New Residential Single Family — over 4,500 sq ft$325.00 plus $65.00 per additional 1,000 sq ftEagle Building Department Fee Schedule (Resolution 23-34) — Mechanical Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
Existing Residential (retrofits, additions) — Base Administrative Fee$65.00 base plus $10.00 for each duct, fireplace, HVAC equipment, or ventEagle Building Department Fee Schedule (Resolution 23-34)
Fireplace (Gas or Electric)$75.00Eagle Building Department Fee Schedule (Resolution 23-34)
Fireplace Installation (two inspections)$130.00Eagle Building Department Fee Schedule (Resolution 23-34)
Hydronic Flooring$65.00 plus $10.00 for each additional manifoldEagle Building Department Fee Schedule (Resolution 23-34)
Gas Line Base Administrative Fee$65.00Eagle Building Department Fee Schedule (Resolution 23-34)
Re-inspection Fee$65.00 minimumEagle Building Department Fee Schedule (Resolution 23-34)

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Eagle residential and commercial properties, including water heaters, fixture additions, sewer/water service lines, backflow prevention devices, and lawn sprinklers. Governed by the 2017 Idaho State Plumbing Code (ISPC — IAPMO). Apply through the Eagle Contractor Portal.

Verified 2026-07-17 · Source

Requirements

  • Repair, replace, relocate, or add to any plumbing system
  • Water heater or water softener installation or replacement
  • New plumbing fixtures or replacement fixtures
  • Sewer line installation, water line installation, or combination
  • Backflow prevention device installation
  • Lawn sprinkler system installation
  • Apply through the Eagle Contractor Portal or in person; permit issued when paid in full

Required documents

  • RequiredPlumbing Permit ApplicationSubmitted through the Eagle Contractor Portal (eagle_permit.portal.iworq.net) or in person at 660 E Civic Lane

Fee schedule

Fee typeAmountNotes
Commercial plumbing permits and special cases (sewer/water lines installed by someone other than the building's plumbing contractor, commercial coaches, lawn sprinklers, mobile home/RV park sewer-water lines, volunteer-labor installations) — fees calculated from Verified Contract Price TableCost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660; cost over $100,001: subtract $100,000, multiply by 1%, plus $2,260Eagle Building Department Fee Schedule (Resolution 23-34, amended Dec 19, 2023 per document header) — Plumbing Fees section; figure re-confirmed live 2026-07-17, unchanged. Fees based on fair market project value (total labor, materials, equipment including overhead and profit). Not reducible for owner-supplied materials. Type label corrected 2026-07-17: the live fee schedule PDF applies this Verified Contract Price Table to Commercial plumbing and the listed special cases specifically, not to standard new-residential plumbing (which uses its own square-footage table, added below) — prior 'All plumbing permits' label was imprecise.
New Residential Single Family Dwelling — up to 1,500 sq ft$130.00Eagle Building Department Fee Schedule (Resolution 23-34) — Plumbing Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
New Residential Single Family Dwelling — 1,501 to 2,500 sq ft$195.00Eagle Building Department Fee Schedule (Resolution 23-34) — Plumbing Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
New Residential Single Family Dwelling — 2,501 to 3,500 sq ft$260.00Eagle Building Department Fee Schedule (Resolution 23-34) — Plumbing Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
New Residential Single Family Dwelling — 3,501 to 4,500 sq ft$325.00Eagle Building Department Fee Schedule (Resolution 23-34) — Plumbing Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
New Residential Single Family Dwelling — over 4,500 sq ft$325.00 plus $65.00 per additional 1,000 sq ftEagle Building Department Fee Schedule (Resolution 23-34) — Plumbing Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
Existing Residential Base Fee$65.00 base feeEagle Building Department Fee Schedule (Resolution 23-34) — Plumbing Fees section; row confirmed present on live fee schedule PDF 2026-07-17, previously missing from this record, added
Water Heater / Water Softener$65.00Eagle Building Department Fee Schedule (Resolution 23-34)
Backflow Prevention Device$65.00Eagle Building Department Fee Schedule (Resolution 23-34)
Sewer Line Installation (base fee not applicable)$65.00Eagle Building Department Fee Schedule (Resolution 23-34)
Water Line Installation (base fee not applicable)$65.00Eagle Building Department Fee Schedule (Resolution 23-34)
Sewer and Water Combination (base fee not applicable)$65.00Eagle Building Department Fee Schedule (Resolution 23-34)
Additional Fixtures Each (excluding garbage disposals and dishwashers)$10.00 eachEagle Building Department Fee Schedule (Resolution 23-34)
Replacement Fixtures Each$10.00 eachEagle Building Department Fee Schedule (Resolution 23-34)
Swimming Pools — Basic Fee (covers 3 required inspections)$195.00Eagle Building Department Fee Schedule (Resolution 23-34)
Multipurpose Fire Sprinklers and Domestic Water Supply System (1–2 family)$65.00 or $4 per fire sprinkler head, whichever is greaterEagle Building Department Fee Schedule (Resolution 23-34)
Re-inspection Fee$65.00 minimumEagle Building Department Fee Schedule (Resolution 23-34)

Fence and Retaining Wall Permit

Verified

Eagle has a tiered fence and retaining wall permit process depending on location (front yard/street, common lot, or other residential). Residential fences in any front yard or along any street require a Fence Permit from Planning & Zoning first; fences over 6 feet or retaining walls over 4 feet also require a building permit from the Building Division. Commercial fences and retaining walls of any height require Design Review. Fences under 6 feet height in other-than-front-yard locations generally do not require a building permit but must comply with Eagle City Code 8-3-3.

Verified 2026-07-17 · Source

Requirements

  • Front yard / street residential fences: Fence Permit from Planning & Zoning required regardless of height (Design Review not required)
  • Residential fences over 6 ft OR retaining walls over 4 ft in any residential location: building permit required from Building Division in addition to Planning & Zoning fence permit
  • Common lot residential fences/retaining walls of any height: Design Review approval from Planning & Zoning required first; building permit required if fence over 6 ft or wall over 4 ft
  • All other residential fences under 6 ft height and retaining walls under 4 ft height in non-front-yard/non-common-lot locations: no building permit required; must comply with Eagle City Code 8-3-3
  • Commercial fences and retaining walls of any height: Design Review approval required first; building permit required for fences over 7 ft or retaining walls over 4 ft

Required documents

  • RequiredFence Permit ChecklistFillable or PDF format; available at cityofeagle.org/DocumentCenter/View/4346 (fillable) or /View/1414 (PDF). Submitted to Planning & Zoning for the fence permit step.
  • OptionalBuilding Permit Application for Commercial (when building permit required)Fillable or PDF; available at cityofeagle.org/DocumentCenter/View/4779 (fillable) or /View/4778 (PDF). Required when fence/wall height triggers a building permit.
  • OptionalDesign Review Application (commercial or common lot)Required for all commercial fences/walls and common lot residential fences/walls; submitted to Planning & Zoning. Available at cityofeagle.org/DocumentCenter/View/235.

Fee schedule

Fee typeAmountNotes
Building permit for fence/retaining wall (when required) — valuation-basedCost up to $20,000: multiply by 3% plus $60; cost $20,001–$100,000: subtract $20,000, multiply by 2%, plus $660Eagle Building Department Fee Schedule (Resolution 23-34). Planning & Zoning fence permit fees are set by the P&Z Department separately.

Sign Permit

Verified

The City of Eagle requires Design Review approval from Planning & Zoning for ALL signs located within Eagle city limits. After Design Review approval and the appeal period, Planning & Zoning issues the sign permit for signs without electrical. Signs with electrical components require a separate electrical permit from the Building Division, which must be obtained before the final sign permit is issued by Planning & Zoning.

Verified 2026-07-17 · Source

Requirements

  • Design Review application required for ALL signs — submitted to the Planning & Zoning Department
  • After Design Review approval, an appeal period must pass before proceeding
  • Signs without electrical: Planning & Zoning issues sign permit after the appeal period — construction may then commence
  • Signs with electrical: a separate electrical permit from the Building Division must be obtained after conditional Design Review approval, and proof provided to Planning & Zoning before the sign permit is issued

Required documents

  • RequiredDesign Review Sign Board Level ChecklistAvailable at cityofeagle.org/DocumentCenter/View/239 (corrected 2026-07-17 — /235 is a different, non-sign-specific 'Design Review - Board Level' form; the sign-specific board-level checklist is confirmed live at /239) for larger or complex sign projects
  • RequiredDesign Review Staff Level Sign ChecklistFillable or PDF format; available from the Sign Permits page at cityofeagle.org/1837/Sign-Permits. For most standard sign applications.
  • OptionalDesign Review Special Portable Sign ChecklistFillable format; for portable/temporary sign applications
  • OptionalElectrical Permit Application (for signs with electrical)Submitted to the Building Division through the Contractor Portal; required before final sign permit is issued by Planning & Zoning

Fee schedule

Fee typeAmountNotes
Electrical permit for illuminated signs (commercial value-based)Cost up to $10,000: multiply by 2% plus $60.00; cost $10,001–$100,000: subtract $10,000, multiply by 1%, plus $260.00Eagle Building Department Fee Schedule (Resolution 23-34) — Electrical Fees, Commercial/Industrial/Solar/Renewable Energy section. Planning & Zoning Design Review and sign permit fees are separate.

Solar / Renewable Energy Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Eagle. Unlike many smaller Idaho jurisdictions, the City of Eagle self-administers its own Building, Electrical, and Mechanical permitting rather than routing electrical work to the state Division of Building Safety. The City's own Building Department Fee Schedule lists a distinct Electrical Fees line item, 'Other Installations: Commercial / Industrial / Solar / Renewable Energy,' with its own tiered valuation-based formula, grouping solar/renewable-energy electrical work together with commercial/industrial installations. The structural/racking portion of the installation is billed on the City's standard valuation-based Building Permit fee schedule, calculated from the ICC Building Valuation Data chart the City has adopted.

Verified 2026-07-20 · Source

Requirements

  • Obtain a City of Eagle Building Permit for the structural/racking portion of the installation
  • Obtain a City of Eagle Electrical Permit for the interconnection/electrical work, billed under the 'Other Installations: Commercial / Industrial / Solar / Renewable Energy' fee tier
  • Submit required documentation and plans through the City's Contractor Portal; request inspections through the same portal after permit issuance
  • Installation must comply with the currently adopted building and electrical codes referenced in the City's Building Permit Fee Schedule

Required documents

  • RequiredBuilding Permit ApplicationFor the structural/racking portion; available via the City's Links & Forms page
  • RequiredElectrical Permit ApplicationFor the interconnection/electrical work, billed under the Solar/Renewable Energy 'Other Installations' fee tier

Fee schedule

Fee typeAmountNotes
Electrical Permit — Other Installations: Commercial / Industrial / Solar / Renewable Energy — cost up to $10,000Cost x 2% (0.02) plus $60.00City of Eagle Fee Schedule — Building (amended by Resolution 23-34, December 19, 2023), Electrical Fees section, directly fetched and text-extracted from the City's own PDF; solar/renewable energy is explicitly named in this fee tier alongside commercial/industrial electrical installations
Electrical Permit — Other Installations: Commercial / Industrial / Solar / Renewable Energy — cost $10,001 to $100,000(Cost minus $10,000) x 1% (0.01) plus $260.00City of Eagle Fee Schedule — Building (amended by Resolution 23-34, December 19, 2023)
Electrical Permit — Other Installations: Commercial / Industrial / Solar / Renewable Energy — cost over $100,001(Cost minus $100,000) x 0.5% (0.005) plus $1,160.00City of Eagle Fee Schedule — Building (amended by Resolution 23-34, December 19, 2023)
Building Permit Fee (structural/racking portion) — valuation-basedThe City's Building Permit Fee Schedule calculates square-foot construction costs from the ICC Building Valuation Data chart (adopted August 2022), but the specific building-permit valuation percentage table was not located within the same Electrical/Mechanical fee-schedule PDF reviewed for this entry; contact the Building Department, (208) 489-8760, for the current structural permit fee calculation.

Sources & verification

Verified against official sources. Last reviewed 2026-07-17.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-29)View current record →All versions →

Permalink: /idaho/ada-county/eagle/as-of/2026-07-17/

Snapshot date: 2026-07-17

Commit: c87d33d

Reproducible from PermitBase’s version-controlled dataset, commit c87d33d.