Pocatello building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Pocatello, Idaho.
Verified 2026-07-03 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 911 N 7th Avenue, Pocatello, ID 83201 (mailing: PO Box 4169, Pocatello, ID 83205-4169)
- Phone
- (208) 234-6158
- Office hours
- Building Official: Marc Howell. Inspection scheduling hotline: (208) 234-6275 / (208) 234-6580 (erosion & sediment control inspections). Permits and Licensing Division: (208) 234-6285. Planning & Development Services (land use, ADUs, zoning): (208) 234-6184.
- Website
- Official site
Published scheduling rules
- To schedule an inspection, use the eTRAKiT portal (poca.csqrcloud.com/community-etrakit/dashboard.aspx) or the inspection hotline. (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Footing/Foundation
Prior to concrete pour; verify footing dimensions/rebar per the Alternative Footing and Foundation Policy (R104.11) for foundation walls, and 3-foot minimum frost depth
- 2
Framing
Structural framing per approved plans, floor/wall/roof framing, truss and floor joist details
- 3
Erosion and Sediment Control (ESC) — Initial
Requested prior to beginning grading or excavation; call (208) 234-6580
- 4
Final / Certificate of Occupancy
Final building, electrical, plumbing, and mechanical verification; final ESC inspection also required for certificate of occupancy (call 208-234-6580)
Applies to: Residential Addition / Remodel / Repair Permit
- 1
Footing/Foundation
Required before concrete pour for additions or foundation repairs
- 2
Framing
Structural framing and connections to the existing structure per approved plans
- 3
Final
All work complete per approved plans
Applies to: Electrical Permit
- 1
Rough-In
Prior to covering wiring; verify wiring methods, box fill, and grounding per 2023 NEC
- 2
Final
Final electrical inspection prior to certificate of occupancy or service energization
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Prior to covering wiring; verify wiring methods, box fill, and grounding per 2023 NEC
- 2
Final
Charger installed, circuit labeled, final electrical inspection prior to energization
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork, gas piping, and equipment rough-in prior to cover, per 2018 IMC/IFGC
- 2
Final
Final mechanical inspection including appliance connections and combustion-air/venting verification
Applies to: Plumbing Permit
- 1
Rough-In
Prior to covering plumbing lines; verify pipe sizing, venting, and materials per the 2017 Idaho State Plumbing Code
- 2
Final
Final plumbing inspection including fixture connections and water heater installation
Final inspection only: Demolition Permit, Fence Permit, Re-Roof / Roof Overlay Permit, Solar Photovoltaic (PV) Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pocatello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Pocatello building permits
Get alerts for Pocatello
We'll email you when Pocatello's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.