EV Charger / EVSE Permit in Pocatello, Idaho

The City of Pocatello has no EV-charger-specific permit type or fee line. The City's Building Permit Fees schedule lists itemized electrical fee categories (New Residential Electrical by square footage, Existing Residence service/circuit work, Service Upgrade or Service Change, Temporary Service, Solar Photovoltaic Electrical Service, Industrial/Commercial Services, Electric Signs, Carnivals/Circuses) but no EV-charger, electric-vehicle, or EVSE line item — confirmed by direct review of the published fee schedule page. An EV charger circuit is filed as ordinary residential electrical work: a new dedicated circuit at an existing residence (the 'Existing residence — service/circuit work' fee), or a 'Service upgrade or service change' fee if a panel upgrade is needed to support the charger. Work is governed by the 2023 NEC as adopted by the City and applied for through the eTRAKiT portal.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the EV charger circuit installation, filed as ordinary residential electrical work
  • Governed by the 2023 NEC as adopted by the City of Pocatello
  • Electrical contractors must present a copy of their State of Idaho (DOPL) electrical contractor license; the City does not issue a separate city electrical contractor license Contractor
  • Apply through the eTRAKiT portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Existing residence — service/circuit work (applies to a new dedicated EV charger circuit; no EV-specific line item found)City of Pocatello Building Permit Fees schedule. Confirmed by direct review of the published fee schedule: no EV charger, electric vehicle, or EVSE line item exists — an EV charger circuit is billed under this general existing-residence electrical service/circuit category.
$65 plus $10 per additional branch circuit
Service upgrade or service change (if a panel upgrade is required to support the charger)City of Pocatello Building Permit Fees schedule
$65

Review timeline

Plan reviewPocatello’s published plan-review target
10–20 business days

How long did your EV Charger / EVSE Permit permit actually take in Pocatello?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Prior to covering wiring; verify wiring methods, box fill, and grounding per 2023 NEC

  2. 2

    Final

    Charger installed, circuit labeled, final electrical inspection prior to energization

See the full Pocatello inspection guide — scheduling & re-inspection fees →

Tips

  • There is no dedicated EV-charger permit fee line in Pocatello — a new EVSE circuit at an existing home is billed as ordinary 'Existing residence — service/circuit work' ($65 plus $10 per additional branch circuit); a panel/service upgrade to support the charger is billed separately at $65.
  • As a local government requiring building permits, Pocatello is bound by Idaho Code § 39-4117, which requires written notice of a completeness determination within 10 business days for residential applications and 20 business days for commercial applications — this is a completeness-review deadline, not a full-approval deadline.

Frequently asked questions

Pocatello requires an ev charger / evse permit for: Electrical permit required for the EV charger circuit installation, filed as ordinary residential electrical work; Governed by the 2023 NEC as adopted by the City of Pocatello; Electrical contractors must present a copy of their State of Idaho (DOPL) electrical contractor license; the City does not issue a separate city electrical contractor license; Apply through the eTRAKiT portal. If your project isn't listed, confirm with City of Pocatello Building Department (Development Services Center) at (208) 234-6158 before starting work.

No. The City of Pocatello's Building Permit Fees schedule has no EV-charger, electric-vehicle, or EVSE line item. An EV charger circuit is permitted as ordinary residential electrical work — $65 plus $10 per additional branch circuit for a new circuit at an existing home, or $65 for a service upgrade if the charger requires one.

Pocatello's published plan-review target for an ev charger / evse permit is 10–20 business days.

You'll need: Electrical Permit Application; Copy of State of Idaho DOPL Electrical Contractor License. See the required-documents checklist on this page for details on each.

Pocatello requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through City of Pocatello Building Department (Development Services Center) ((208) 234-6158).

Apply through City of Pocatello Building Department (Development Services Center) at 911 N 7th Avenue, Pocatello, ID 83201 (mailing: PO Box 4169, Pocatello, ID 83205-4169). Phone: (208) 234-6158. Office hours: Building Official: Marc Howell. Inspection scheduling hotline: (208) 234-6275 / (208) 234-6580 (erosion & sediment control inspections). Permits and Licensing Division: (208) 234-6285. Planning & Development Services (land use, ADUs, zoning): (208) 234-6184.. Official information: https://pocatello.gov/163/Building.

Pocatello, Idaho has adopted: Idaho has a mandatory statewide building code framework under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41), administered by the Division of Occupational and Professional Licenses' Building Safety Program, which sets the statewide-adopted editions of the IBC, IRC, IECC, and related codes; local jurisdictions administer and enforce permitting and inspections within their boundaries and may adopt local amendments. Source: City of Pocatello General Building Information page (pocatello.gov/164/General-Building-Information).; The City of Pocatello operates its own Building Department and Development Services Center — it is not a DOPL-administered jurisdiction for permit issuance. The Building Department 'ensures the safety of all buildings and structures in the city of Pocatello through the administration and enforcement of codes and ordinances regarding new construction, remodeling, and the abatement of dangerous buildings,' and 'coordinates plan checks and issues building permits for all construction including electrical, plumbing, mechanical and gas installation; building demolitions; excavations; signs and sidewalks.' Source: City of Pocatello Building Department page (pocatello.gov/163/Building).; 2018 International Building Code (IBC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 International Existing Building Code (IEBC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 International Residential Code (IRC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2017 Idaho State Plumbing Code (Idaho's state-amended plumbing code, administered locally) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 International Mechanical Code (IMC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 Idaho Fire Code — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2023 National Electrical Code (NEC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 International Energy Conservation Code (IECC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 International Fuel Gas Code (IFGC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.; 2018 International Wildland-Urban Interface Code (IWUIC) — referenced on the City's Residential Plan Checklist for fire access/turnaround review. Source: City of Pocatello Residential Development Application & Plan Checklist (PDF), pocatello.gov/DocumentCenter/View/81.; All codes amended per the 2018 Idaho Administrative Code (IDAPA rules). Source: City of Pocatello General Building Information page.; Idaho Division of Occupational and Professional Licenses (DOPL) administers statewide contractor/tradesperson licensing (electrical, plumbing, mechanical contractors and journeymen) — DOPL issues the underlying trade licenses, but the City of Pocatello Building Department issues the construction permits and performs inspections within city limits. Source: City of Pocatello Contractor Licenses page (pocatello.gov/166/Contractor-Licenses), which requires electrical/mechanical/plumbing contractors to hold and present 'a copy of State of Idaho license' (DOPL) rather than issuing a separate city trade license for those disciplines.. Local amendments apply — see the Pocatello overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pocatello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.