Unincorporated Bingham County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Bingham County, Idaho.
Verified 2026-07-08 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 490 N Maple, Suite A, Blackfoot, ID 83221
- Phone
- 208-782-3177
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM (closed state & federal holidays)
- Website
- Official site
Published scheduling rules
- All building permits are applied for and managed entirely online through binghamcountyid.viewpointcloud.com — create a free account for 24/7 access to your permit, payments, status, and inspection requests. (Residential Building Permit (New Construction / Addition / Remodel))
- Concrete inspections are not offered immediately before a pour; if you order concrete and the site is not 100% ready at your scheduled inspection time, the inspection fails and a reinspection fee applies. The County does not accept liability for concrete ordered before a passed inspection. (Residential Building Permit (New Construction / Addition / Remodel))
- Apply online at binghamcountyid.viewpointcloud.com; create an account for 24/7 access to the permit, payment, status checks, and inspection requests (Residential Building Permit (New Construction / Addition / Remodel))
- All permits in unincorporated Bingham County are applied for entirely online at binghamcountyid.viewpointcloud.com — create a free account for permit tracking, payment, inspection requests, and printing your Certificate of Occupancy/Completion. (General)
Inspection sequence
Applies to: Residential Building Permit (New Construction / Addition / Remodel)
- 1
Footing / Setback
Combined footing and setback inspection (policy effective 3/21/2024, per Building Official Chase Clark's contractor letter) unless an unusual lot condition requires a separate setback verification. Concrete must be 100% ready at the scheduled time — Bingham County does not perform pre-pour concrete inspections on demand, and an unready site results in a failed inspection and reinspection fee.
- 2
Combined Sheathing / House Wrap / Frame / Rough-Mechanical
These four inspections are combined into a single site visit (policy effective 3/21/2024). Portal frames must be left unwrapped for nail-pattern inspection. Work must be fully complete before the inspection is called in.
- 3
Insulation
Attic insulation depth verified against minimum R-value using installed attic markers (IECC 2018 R303.1.2); vapor barrier use restricted to unfinished basements per local climate zone.
- 4
Final
All work complete per approved plans; Certificate of Occupancy or Certificate of Completion issued and available for download through the ViewPointCloud portal.
Applies to: Mechanical / HVAC Permit (Residential and Commercial)
- 1
Gas Piping Pressure Test
Required before concealing gas piping, verifying no leaks under test pressure per 2018 IFGC
- 2
Rough-In
Mechanical equipment and ductwork verified before concealment; combined with other rough-in trades under current county inspection policy where applicable
- 3
Final
Equipment operational, combustion air and venting verified per 2018 IMC/IFGC
Applies to: Residential Accessory Structure Permit (Shop, Pole Barn, Garage, Shed)
- 1
Footing / Setback
Combined footing and setback inspection per current county policy
- 2
Framing
Verifies structural framing, including truss details for premanufactured trusses
- 3
Final
All work complete per approved plans
Applies to: Manufactured / Modular Home Setting & Moving Permit
- 1
Foundation / Block Setting
Verifies footing/foundation or block setting plan compliance, including FEMA-approved permanent foundation if in a floodplain
- 2
Final
Confirms HUD tag, data plate, and completed setting; Certificate of Occupancy/Completion issued
Applies to: Solar Photovoltaic (PV) Permit
- 1
Structural/Mounting Final (County)
Racking attachment, roof penetration sealing, and structural load compliance verified by Bingham County
- 2
Electrical Interconnection (DOPL, separate permit)
Conduit, disconnects, inverter, and interconnection point verified by a DOPL-assigned inspector under the separate state electrical permit
Final inspection only: EV Charger / EVSE Electrical Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Bingham County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Bingham County building permits
Get alerts for Unincorporated Bingham County
We'll email you when Unincorporated Bingham County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.