Unincorporated Bingham County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Bingham County, Idaho.

Verified 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
490 N Maple, Suite A, Blackfoot, ID 83221
Phone
208-782-3177
Office hours
Mon–Fri 8:00 AM – 5:00 PM (closed state & federal holidays)

Published scheduling rules

  • All building permits are applied for and managed entirely online through binghamcountyid.viewpointcloud.com — create a free account for 24/7 access to your permit, payments, status, and inspection requests. (Residential Building Permit (New Construction / Addition / Remodel))
  • Concrete inspections are not offered immediately before a pour; if you order concrete and the site is not 100% ready at your scheduled inspection time, the inspection fails and a reinspection fee applies. The County does not accept liability for concrete ordered before a passed inspection. (Residential Building Permit (New Construction / Addition / Remodel))
  • Apply online at binghamcountyid.viewpointcloud.com; create an account for 24/7 access to the permit, payment, status checks, and inspection requests (Residential Building Permit (New Construction / Addition / Remodel))
  • All permits in unincorporated Bingham County are applied for entirely online at binghamcountyid.viewpointcloud.com — create a free account for permit tracking, payment, inspection requests, and printing your Certificate of Occupancy/Completion. (General)

Inspection sequence

Applies to: Residential Building Permit (New Construction / Addition / Remodel)

  1. 1

    Footing / Setback

    Combined footing and setback inspection (policy effective 3/21/2024, per Building Official Chase Clark's contractor letter) unless an unusual lot condition requires a separate setback verification. Concrete must be 100% ready at the scheduled time — Bingham County does not perform pre-pour concrete inspections on demand, and an unready site results in a failed inspection and reinspection fee.

  2. 2

    Combined Sheathing / House Wrap / Frame / Rough-Mechanical

    These four inspections are combined into a single site visit (policy effective 3/21/2024). Portal frames must be left unwrapped for nail-pattern inspection. Work must be fully complete before the inspection is called in.

  3. 3

    Insulation

    Attic insulation depth verified against minimum R-value using installed attic markers (IECC 2018 R303.1.2); vapor barrier use restricted to unfinished basements per local climate zone.

  4. 4

    Final

    All work complete per approved plans; Certificate of Occupancy or Certificate of Completion issued and available for download through the ViewPointCloud portal.

Applies to: Mechanical / HVAC Permit (Residential and Commercial)

  1. 1

    Gas Piping Pressure Test

    Required before concealing gas piping, verifying no leaks under test pressure per 2018 IFGC

  2. 2

    Rough-In

    Mechanical equipment and ductwork verified before concealment; combined with other rough-in trades under current county inspection policy where applicable

  3. 3

    Final

    Equipment operational, combustion air and venting verified per 2018 IMC/IFGC

Applies to: Residential Accessory Structure Permit (Shop, Pole Barn, Garage, Shed)

  1. 1

    Footing / Setback

    Combined footing and setback inspection per current county policy

  2. 2

    Framing

    Verifies structural framing, including truss details for premanufactured trusses

  3. 3

    Final

    All work complete per approved plans

Applies to: Manufactured / Modular Home Setting & Moving Permit

  1. 1

    Foundation / Block Setting

    Verifies footing/foundation or block setting plan compliance, including FEMA-approved permanent foundation if in a floodplain

  2. 2

    Final

    Confirms HUD tag, data plate, and completed setting; Certificate of Occupancy/Completion issued

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Structural/Mounting Final (County)

    Racking attachment, roof penetration sealing, and structural load compliance verified by Bingham County

  2. 2

    Electrical Interconnection (DOPL, separate permit)

    Conduit, disconnects, inverter, and interconnection point verified by a DOPL-assigned inspector under the separate state electrical permit

Re-inspection fees

Residential Building Permit (New Construction / Addition / Remodel)Re-inspection fee · Fee Schedule Resolution 2026-17
$100 after the 2nd failed inspection; $150 after the 3rd failed inspection

Unincorporated Bingham County building permits

Get alerts for Unincorporated Bingham County

We'll email you when Unincorporated Bingham County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.