Caldwell building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Caldwell, Idaho.
Verified 2026-07-16 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 205 South 6th Ave, Caldwell, ID 83605
- Phone
- (208) 455-3024
- Office hours
- Mon–Fri (inspection requests must be called in by 7:00 AM for same-day scheduling)
- Website
- Official site
Published scheduling rules
- For concrete pours, call the inspection line early to ensure the project is ready at the requested time — rescheduling requires a next-business-day inspection. (Residential Building Permit (New Construction))
- Call inspection line (208) 455-4605 by 7:00 AM for same-day inspection scheduling. (Residential Electrical Permit)
- Fire and Planning & Zoning inspections must be scheduled through the Citizenserve online portal only. (Residential Electrical Permit)
- Call inspection line (208) 455-4605 by 7:00 AM for same-day inspection scheduling. (Residential Plumbing Permit)
- Call inspection line (208) 455-4605 by 7:00 AM for same-day inspection scheduling. (Residential Mechanical / HVAC Permit)
- Call the inspection line (208) 455-4605 by 7:00 AM for same-day inspection scheduling. (EV Charger / EVSE Permit)
- Inspection requests must be called in to the Inspection Line (208) 455-4605 by 7:00 AM for same-day inspection scheduling. Requests after 7:00 AM are scheduled for the next business day. (General)
- Fire Department and Planning & Zoning inspections must be scheduled through the Citizenserve online portal only — not by phone. (General)
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Footing / Foundation
Before concrete pour — verify depth (24-inch frost line), forms, reinforcement
- 2
Framing
After structural framing, sheathing, and rough-in trades complete — before insulation or wall cover
- 3
Insulation / Energy
Insulation installed per 2018 IECC with State Amendments before drywall
- 4
Final
All work complete per approved plans; Certificate of Occupancy issued for residential structures upon passing
Applies to: Residential Addition / Remodel Permit
- 1
Framing / Structural
After framing complete, before walls covered — verify structure, blocking, egress
- 2
MEP Rough-In
Electrical, plumbing, and mechanical rough-ins before wall cover (under separate trade permits)
- 3
Final
All work complete per approved plans; Certificate of Completion issued
Applies to: Residential Mechanical / HVAC Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping — verify no leaks under test pressure
- 2
Rough-In / Equipment
HVAC equipment, ductwork, and gas lines rough-in before walls closed
- 3
Final
Equipment operational, combustion air verified, venting correct, controls functional
Applies to: Residential Plumbing Permit
- 1
Underground / Slab Plumbing
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed — pressure test required
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Electrical Rough-In
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final — Building / Structural
Panel mounting, racking attachment, roof penetration sealing verified
- 3
Final — Electrical
Connections, inverter installation, and interconnection verified per 2023 NEC
Applies to: Accessory Structure / Pole Building Permit
- 1
Foundation / Footings
Verify depth (24-inch frost line minimum), forms, post embedment for pole buildings
- 2
Final
Structure complete per approved plans
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Circuit wiring installed, before walls closed — verify conductor sizing and box placement
- 2
Final
EVSE connected, GFCI/AFCI protection verified per 2023 NEC
Applies to: Residential Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed — verify conductor sizing, box placement, and service connections
- 2
Final
All devices installed, panel labeled, GFCI/AFCI protection verified per 2023 NEC
Final inspection only: Demolition Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Caldwell building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Caldwell building permits
Get alerts for Caldwell
We'll email you when Caldwell's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.