Nampa building permits

Verified

Nampa, Idaho — as published 2026-06-29.

Verified 2026-06-29 · Source

Codes adopted

2018 International Residential Code (IRC)2018 International Building Code (IBC)2018 International Existing Building Code (IEBC)2018 International Fire Code (IFC)2018 International Energy Conservation Code (IECC) — Residential and Commercial2018 International Mechanical Code (IMC)2018 International Fuel Gas Code (IFGC)2017 Idaho State Plumbing Code2023 National Electrical Code (NEC)2009 ICC/ANSI/A117.1 (Accessibility)2015 NFPA A30 Code for Motor Fuel Dispensing Facilities and Repair Garages2015 NFPA 99 Health Care Facilities Code

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for all new one- and two-family dwellings in Nampa. Covers new single-family homes, duplexes, and associated systems. Apply online through the CSS portal or in person at 500 12th Ave S.

Verified 2026-06-29 · Source

Requirements

  • Verify proposed use with Planning & Zoning before applying
  • Submit application through CSS online portal or in person
  • Plans must comply with 2018 IRC and 2018 IECC
  • Planning & Zoning Initial Review of Compliance required before submittal
  • Approved plans must remain on site during all inspections
  • Permit communication sent via email from noreply@cityofnampa.us — do not mark as spam

Required documents

  • RequiredNew Residential Building Permit Application & Checklist (Feb 2026)Official Nampa building permit application and submittal checklist for new residential construction; available at cityofnampa.us/DocumentCenter/View/20380
  • RequiredConstruction DrawingsComplete plan set including site plan, floor plans, elevations, sections, and structural details
  • RequiredEnergy Code Compliance DocumentationRescheck or equivalent demonstrating compliance with 2018 IECC
  • OptionalIECC System Commissioning FormRequired for HVAC commissioning per 2018 IECC; available on city website

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$22.20 flatNampa Exhibit A Schedule of Permit Fees (Dec 21, 2021)
Building Permit — valuation $501 to $2,000$22.20 for first $500, plus $2.88 per each additional $100
Building Permit — valuation $2,001 to $25,000$65.40 for first $2,000, plus $13.23 per each additional $1,000
Building Permit — valuation $25,001 to $50,000$369.69 for first $25,000, plus $9.55 per each additional $1,000
Building Permit — valuation $50,001 to $100,000$608.44 for first $50,000, plus $6.61 per each additional $1,000
Building Permit — valuation $100,001 to $500,000$938.94 for first $100,000, plus $5.29 per each additional $1,000
Plan Review Fee65% of the building permit feeAssessed at intake; Nampa Exhibit A item 6
New Residential (R-3/R-4) Plumbing/Mechanical/Electrical sub-permit — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee
New Residential (R-3/R-4) Plumbing/Mechanical/Electrical sub-permit — 2,000+ sq ft habitable area$325.00 per dwelling unit
Reinspection (after first reinspection for same item)$55.00 flat fee

Residential Addition / Remodel Permit

Verified

Required for additions, remodels, and structural alterations to existing one- and two-family dwellings in Nampa. Covers room additions, garage conversions, basement finishes, deck construction, and structural modifications.

Verified 2026-06-29 · Source

Requirements

  • Finishing an attic, garage, or basement to create living space
  • Adding a room, garage, carport, or attached structure
  • Moving, removing, or adding walls
  • Decks more than 12 inches above grade
  • Retaining walls 4 feet or more in height (bottom of footing to top of wall), or 2-foot retaining walls with a slope/surcharge
  • Build or enclose a patio cover, porch, or carport
  • Replacement of windows or doors where the opening is structurally modified

Required documents

  • RequiredResidential Addition Building Permit Application & Checklist (Oct 2024)Official Nampa addition permit application; available at cityofnampa.us/DocumentCenter/View/18792
  • OptionalResidential Remodel Permit Application & Checklist (Oct 2024)For remodel scope; available at cityofnampa.us/DocumentCenter/View/18793
  • RequiredConstruction DrawingsPlans showing scope of work, dimensions, structural details, and connection to existing structure

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based per Exhibit A Table$22.20 (≤$500); $22.20 + $2.88/$100 ($501–$2,000); $65.40 + $13.23/$1,000 ($2,001–$25,000); $369.69 + $9.55/$1,000 ($25,001–$50,000); etc.Nampa Exhibit A Schedule of Permit Fees (Dec 2021)
Plan Review Fee65% of the building permit feeAssessed at intake
Plumbing extras (additions/remodels) — fixtures$36.00 base + $15.00 per fixtureNampa Exhibit A — Miscellaneous Fees for Plumbing sub-trade permits
Electrical extras (additions/remodels) — each circuit extension$36.00 base + $15.00 per circuit extensionNampa Exhibit A — Miscellaneous Fees for Electrical sub-trade permits
Mechanical extras (additions/remodels) — equipment$36.00 base + $15.00 per piece of mechanical equipmentNampa Exhibit A — Miscellaneous Fees for Mechanical sub-trade permits
Reinspection (after first reinspection for same item)$55.00 flat fee

Residential Electrical Permit

Verified

Required for all electrical wiring installations, equipment changes, or wiring modifications in Nampa residences, including panel upgrades, new circuits, service changes, and EV charger installations. All work must comply with the 2023 National Electrical Code.

Verified 2026-06-29 · Source

Requirements

  • All electrical wiring installations, equipment changes, or any wiring installations require a permit before commencing work
  • Work must be performed by a state-licensed journeyman electrician employed by a state-licensed electrical contractor
  • Homeowner exception: owner of a single-family or two-family dwelling (R-3/U-1 occupancy) may perform own electrical work if residing in the dwelling within 12 months after completion
  • Hardship exception: immediate family member may perform work for a family member unable to perform it themselves

Required documents

  • RequiredElectrical Permit Application (2024)Nampa Building Department electrical permit application; available at cityofnampa.us/DocumentCenter/View/18813

Fee schedule

Fee typeAmountNotes
New residential dwelling (R-3/R-4) electrical — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee (includes plumbing, electrical, and mechanical under same flat rate)
New residential dwelling (R-3/R-4) electrical — 2,000+ sq ft habitable area$325.00 per dwelling unit
Residential electrical (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee applies to all residential sub-trade permits for additions/remodels
Main or sub-main electrical service (residential, additions/remodels)$55.00Nampa Exhibit A — Electrical Extras: 'Main and Sub-Main electrical services (residential only) $55.00'
Each circuit extension (residential, additions/remodels)$15.00 per circuitNampa Exhibit A — Electrical Extras
Miscellaneous electrical equipment (residential, additions/remodels)$15.00 per itemNampa Exhibit A — Electrical Extras
Temporary electrical service (residential only)$55.00Nampa Exhibit A — Electrical Extras
Reinspection (after first reinspection for same item)$55.00 flat fee

Residential Plumbing Permit

Verified

Required for all plumbing piping and drainage work in Nampa residences, including fixture additions, water and sewer line work, and water heater replacements. Governed by the 2017 Idaho State Plumbing Code.

Verified 2026-06-29 · Source

Requirements

  • All plumbing piping and drainage work except emergency repairs to leaks or replacing broken fixtures in kind
  • Must be performed by a state-licensed journeyman plumber employed by an Idaho-licensed plumbing contractor
  • Excavation contractors for sewer/water service lines outside the building envelope must hold Idaho health district septic certification or Idaho public works excavator license
  • Homeowner exception: owner of R-3/U-1 occupancy may perform own plumbing if residing in dwelling within 180 days after completion
  • Hardship exception: immediate family member may perform work for family member unable to do so

Required documents

  • RequiredPlumbing Permit Application (2024)Nampa Building Department plumbing permit application; available at cityofnampa.us/DocumentCenter/View/18815

Fee schedule

Fee typeAmountNotes
New residential dwelling (R-3/R-4) plumbing — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee (covers installations within the dwelling unit)
New residential dwelling (R-3/R-4) plumbing — 2,000+ sq ft habitable area$325.00 per dwelling unit
Residential plumbing (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee for all residential sub-trade addition/remodel permits
Sewer line (new or replacement)$55.00Nampa Exhibit A — Plumbing Extras
Water line (new or replacement)$55.00Nampa Exhibit A — Plumbing Extras
Fixtures (additions and remodels) — per fixture$15.00 per fixtureNampa Exhibit A — Plumbing Extras; applies per toilet, sink, shower, bathtub, water heater, etc.
Reinspection (after first reinspection for same item)$55.00 flat fee

Residential Mechanical / HVAC Permit

Verified

Required for all mechanical equipment installations in Nampa residences, including furnaces, air conditioners, heat pumps, gas piping, ductwork, gas fireplaces, and HVAC replacements. Governed by the 2018 International Mechanical Code and 2018 International Fuel Gas Code.

Verified 2026-06-29 · Source

Requirements

  • All mechanical equipment installations require a permit before work begins
  • Must be performed by a licensed mechanical contractor holding a valid Idaho Contractor's License
  • Gas piping installers must hold a state of Idaho gas piping license
  • Homeowner exception: owner of R-3/R-4/U occupancy may perform own mechanical work if residing in dwelling within 180 days after completion
  • Hardship exception: immediate family member may perform work for family member unable to do so
  • Unvented gas fireplaces require supplemental whole-house ventilation strategy (Nampa local amendment to IMC section 903)

Required documents

  • RequiredMechanical Permit Application (2024)Nampa Building Department mechanical permit application; available at cityofnampa.us/DocumentCenter/View/18814

Fee schedule

Fee typeAmountNotes
New residential dwelling (R-3/R-4) mechanical — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee (covers installations within the dwelling unit)
New residential dwelling (R-3/R-4) mechanical — 2,000+ sq ft habitable area$325.00 per dwelling unit
Residential mechanical (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee for all residential sub-trade addition/remodel permits
Mechanical equipment (residential, additions/remodels) — per appliance$15.00 per piece of equipmentNampa Exhibit A — Mechanical Extras: 'Mechanical equipment (residential only) $15.00'
Venting without new appliance (residential only)$15.00Nampa Exhibit A — Mechanical Extras
Gas piping pressure test$15.00Nampa Exhibit A — Mechanical Extras
Reinspection (after first reinspection for same item)$55.00 flat fee

Residential Roofing Permit (Re-roof)

Verified

Required for re-roofing existing residential structures in Nampa, including both overlay and complete tear-off/re-roof projects. Also required for replacement of siding or stucco on existing homes.

Verified 2026-06-29 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Re-roofing overlay
  • Replacement of siding or stucco on existing house

Required documents

  • RequiredResidential Reroof Permit ApplicationNampa Building Department reroof application; available at cityofnampa.us/DocumentCenter/View/18246

Fee schedule

Fee typeAmountNotes
Residential Reroof — building permit (valuation-based)Per Exhibit A valuation table; residential re-roofs typically fall in $22.20–$65.40 range for most projectsNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Plan Review Fee65% of the building permit feeAssessed at intake
Reinspection (after first reinspection for same item)$55.00 flat fee

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems on residential properties in Nampa. A dedicated Solar Permit Application packet is available from the city.

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Submit the Nampa Solar Permit Application packet
  • Electrical work must comply with 2023 NEC
  • Structural roof load calculations required

Required documents

  • RequiredResidential Solar Permit Application PacketNampa's dedicated solar permit application packet; available at cityofnampa.us/DocumentCenter/View/15796
  • RequiredSolar Site PlanRoof plan or ground layout showing panel placement and access pathways
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel
  • RequiredStructural Analysis / Roof Load CalculationConfirming existing roof structure can support panel weight; roof snow load in Nampa is 25 PSF minimum

Fee schedule

Fee typeAmountNotes
Solar permit — building permit (valuation-based)Per Exhibit A valuation table based on project valueNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Plan Review Fee65% of the building permit feeAssessed at intake
Electrical sub-permit for solar wiring (additions/remodels)$36.00 base + $15.00 per circuit extension + $15.00 miscellaneous equipmentNampa Exhibit A — Electrical Extras
Reinspection (after first reinspection for same item)$55.00 flat fee

Electric Vehicle (EV) Charger Permit

Verified

Nampa does not publish a separate EV-charger permit type, but its Residential Electrical Permit page explicitly names EV charger installations as covered work: the permit is 'required for all electrical wiring installations, equipment changes, or wiring modifications in Nampa residences, including panel upgrades, new circuits, service changes, and EV charger installations.' Work must comply with the 2023 NEC and is billed under the same Electrical Extras fee lines used for any new circuit, service, or equipment addition.

Verified 2026-07-20 · Source

Requirements

  • A permit is required before commencing any EV charger installation, whether it is a new dedicated circuit, an equipment/outlet addition, or a panel/service upgrade
  • Work must be performed by a state-licensed journeyman electrician employed by a state-licensed electrical contractor, per the 2023 National Electrical Code
  • Homeowner exception: the owner of a single-family or two-family (R-3/U-1) dwelling may perform the EV charger circuit work themselves if residing in the dwelling within 12 months after completion
  • Apply via the Electrical Permit Application (2024) form to the Nampa Building Department

Required documents

  • RequiredElectrical Permit Application (2024)Nampa Building Department electrical permit application; describe scope as EV charger installation (new circuit/equipment or service upgrade)

Fee schedule

Fee typeAmountNotes
Residential electrical (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee applies to all residential sub-trade permits for additions/remodels, including an EV charger circuit
Each circuit extension (residential, additions/remodels) — applies to a new dedicated EV charger circuit$15.00 per circuitNampa Exhibit A — Electrical Extras
Miscellaneous electrical equipment (residential, additions/remodels) — applies to the EV charger unit itself$15.00 per itemNampa Exhibit A — Electrical Extras
Main or sub-main electrical service (residential, additions/remodels) — applies if a panel/service upgrade is needed for a higher-amperage Level 2 charger$55.00Nampa Exhibit A — Electrical Extras

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of a new accessory dwelling unit on a residential property in Nampa. Nampa provides a dedicated ADU Building Permit Application & Checklist.

Verified 2026-06-29 · Source

Requirements

  • Verify ADU is permitted in the property's zoning district with Planning & Zoning
  • Submit Residential ADU Building Application & Checklist
  • Plans must comply with 2018 IRC
  • Trade sub-permits (electrical, plumbing, mechanical) required separately

Required documents

  • RequiredResidential ADU Building Application & Checklist (Oct 2024)Nampa's dedicated ADU permit application and checklist; available at cityofnampa.us/DocumentCenter/View/18798
  • RequiredConstruction DrawingsFull construction drawings including site plan, floor plans, elevations, and structural details
  • RequiredEnergy Code Compliance DocumentationRescheck or equivalent demonstrating 2018 IECC compliance for the ADU

Fee schedule

Fee typeAmountNotes
ADU Building Permit — valuation-based per Exhibit APer Nampa Exhibit A valuation table; plan review is 65% of permit feeNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Reinspection (after first reinspection for same item)$55.00 flat fee

Accessory Structure Permit

Verified

Required for detached sheds, garages, barns, pole barns, and similar accessory structures on residential properties in Nampa when the structure exceeds 200 square feet. Structures of any size require a permit if hardwired with a 120V electrical system.

Verified 2026-06-29 · Source

Requirements

  • Detached accessory structure exceeding 200 square feet requires a building permit
  • Any structure hardwired with a 120V electrical system requires a permit regardless of size
  • Structures under 200 sq ft with no electrical do not require a permit (confirm with Planning & Zoning re: setbacks and easements)
  • Pole barn type structures require structural engineering by an Idaho-licensed engineer
  • Standalone gazebo/pergola structures exceeding 200 sq ft require a permit

Required documents

  • RequiredAccessory Structure Permit Application & Checklist (Oct 2024)Nampa's dedicated accessory structure application; available at cityofnampa.us/DocumentCenter/View/18803
  • OptionalPole Barn HandoutNampa guidance for pole barn construction; available at cityofnampa.us/DocumentCenter/View/15867

Fee schedule

Fee typeAmountNotes
Accessory Structure — building permit (valuation-based)Per Exhibit A valuation table; plan review is 65% of permit feeNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Reinspection (after first reinspection for same item)$55.00 flat fee

Residential Pool Permit

Verified

Required for in-ground and above-ground swimming pools on residential properties in Nampa when the pool exceeds 48 inches in depth or 5,000 gallons. Prefabricated above-ground pools less than 48 inches deep and under 5,000 gallons accessory to an R-3 occupancy are exempt from permit requirements.

Verified 2026-06-29 · Source

Requirements

  • In-ground swimming pools require a building permit
  • Above-ground pools exceeding 48 inches in depth or 5,000 gallons require a permit
  • Prefabricated above-ground pools less than 48 inches deep, under 5,000 gallons, installed entirely above ground, accessory to R-3 — exempt
  • Electrical work for pool bonding and pump requires a separate electrical permit
  • Fencing around pool required per IRC

Required documents

  • RequiredResidential Pool Permit Application & Checklist (Oct 2024)Nampa's dedicated pool permit application; available at cityofnampa.us/DocumentCenter/View/18794

Fee schedule

Fee typeAmountNotes
Pool permit — building permit (valuation-based)Per Exhibit A valuation table; plan review is 65% of permit feeNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Reinspection (after first reinspection for same item)$55.00 flat fee

Commercial Building Permit (New Construction & Additions)

Verified

Required for new commercial building structures (complete buildings or shell buildings) and for additions to existing commercial buildings in Nampa. Apply via the New Commercial Permit Application (or New Commercial Shell Application for shell-only projects) through the CSS online portal; a Planning & Zoning Initial Review of Compliance is required before submittal.

Verified 2026-08-02 · Source

Requirements

  • Verify the proposed use and obtain Planning & Zoning's Initial Review of Compliance approval before submitting the building permit application
  • Submit the New Commercial Permit Application (or New Commercial Shell Application for a shell-only building, or Commercial Addition Application for an addition) through the CSS online portal
  • Plans must comply with the city's current adopted codes: 2018 IBC, 2018 IECC (commercial), 2018 IMC, 2018 IFGC, 2023 NEC, 2017 Idaho State Plumbing Code, 2009 ICC/ANSI/A117.1, and City Ordinances
  • All plan sets must be Arch D size (24 by 36 inches) and drawn to scale; architectural sheets must be stamped by an Idaho-licensed architect; structural, mechanical, electrical, and plumbing sheets must be stamped by an Idaho-licensed engineer
  • A registered building contractor or the building owner may purchase the building permit; licensed Mechanical, Electrical, and Plumbing contractors must separately purchase their own trade permits — homeowner (residential) permits are not valid for commercial work
  • Applicant must certify an Idaho Contractor Registration Number (per Idaho Code 54-5209) or certify an exemption under Idaho Code 54-5205 on the application
  • Submit a Statement of Special Inspections (as a standalone document or noted on the plan set) whenever structural special inspections are required
  • Project value declared on the application must include the total construction cost plus all improvements within the building — finish work, painting, roofing, electrical, plumbing, HVAC, elevators, fire extinguishing systems — and on-site improvements such as paving, sidewalks, ramps, stairs, utilities, grading, and site prep

Required documents

  • RequiredNew Commercial Permit Application (Feb 2026)Nampa's commercial building permit application for new complete buildings and additions; collects project value, IBC construction type, occupancy group, building height/stories, elevator count, fire sprinkler/alarm status, and the full project team (applicant, owner, contractor, tenant, foreman, design professional, structural/civil engineer, landscape architect). Available at cityofnampa.us/DocumentCenter/View/20273
  • OptionalNew Commercial Shell ApplicationAlternate application for a shell-only (core-and-shell) commercial building with no tenant designated yet; available at cityofnampa.us/DocumentCenter/View/19175
  • RequiredCommercial Building Permit Checklist (revised Nov 5, 2024)Nampa's full submittal checklist covering architectural, structural, electrical, mechanical, and plumbing plans, plus waste water data disclosure, floodplain, soils report, civil site plan, grading plan, traffic study, storm drainage calculations, storm water O&M plan, and landscape plan requirements as applicable; available at cityofnampa.us/DocumentCenter/View/19171
  • RequiredPlanning & Zoning Initial Review of ComplianceConfirms the proposed project complies with zoning entitlements, development agreement, and design review conditions; must be completed before the building permit submittal
  • OptionalStatement of Special InspectionsRequired for structural special inspections on commercial projects; may be a standalone submittal or noted on the plan set. Available at cityofnampa.us/DocumentCenter/View/18730
  • RequiredEnergy Code Compliance (Commercial ComCheck)ComCheck reports for the building envelope, mechanical system, and interior/exterior lighting systems, required per 2018 IECC

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$22.20 flatNampa Exhibit A Schedule of Permit Fees (Dec 21, 2021); same valuation table applies to building permits for all occupancies unless otherwise stated
Building Permit — valuation $501 to $2,000$22.20 for first $500, plus $2.88 per each additional $100
Building Permit — valuation $2,001 to $25,000$65.40 for first $2,000, plus $13.23 per each additional $1,000
Building Permit — valuation $25,001 to $50,000$369.69 for first $25,000, plus $9.55 per each additional $1,000
Building Permit — valuation $50,001 to $100,000$608.44 for first $50,000, plus $6.61 per each additional $1,000
Building Permit — valuation $100,001 to $500,000$938.94 for first $100,000, plus $5.29 per each additional $1,000
Building Permit — valuation $500,001 to $1,000,000$3,054.94 for first $500,000, plus $4.49 per each additional $1,000Commercial projects are far more likely than residential ones to reach this tier
Building Permit — valuation $1,000,000 and up$5,299.94 for first $1,000,000, plus $3.45 per each additional $1,000
Plan Review Fee65% of the building permit feeNampa Exhibit A item 5: 'Plan review fees for all Building Occupancies shall be assessed at 65% of the building permit fee'; invoiced at intake
Commercial MEP sub-contractor permit — valuation-based2.68% of project value up to $20,000; $536.00 plus 1.61% of the portion exceeding $20,000 (up to $50,000); $1,019.00 plus 0.80% of the portion exceeding $50,000 (up to $100,000); $1,419.00 plus 0.54% of the portion exceeding $100,000 above thatNampa Exhibit A — Commercial Project Subcontractor Scope of Work Valuation Table, quoted as printed. The source PDF's own top bracket is labeled 'Project value over $1,000,000' even though the formula continues from the $100,000 breakpoint — an apparent labeling inconsistency in the city's own Dec 21, 2021 document, reproduced here rather than silently corrected. Add the $36.00 base fee below.
Commercial sub-trade Base Permit Fee$36.00Applies to all MEP permits in this section per Nampa Exhibit A
Reinspection (after first reinspection for same item)$55.00 flat fee
Inspections outside normal business hours$72.00 per hour (one hour minimum)Nampa Exhibit A Miscellaneous Fees
Plan review for revisions after the second plan review, or for revisions after permit issuance$72.00 per hour (one hour minimum)Nampa Exhibit A Miscellaneous Fees

Commercial Tenant Improvement (TI) Permit

Verified

Required for finishing or remodeling an existing commercial building or tenant lease space in Nampa, and for any change of occupancy classification. Nampa issues four related products depending on the scenario: a Tenant Improvement permit ending in a Certificate of Completion (no new tenant), a Tenant Improvement (Occupancy Only) permit for a new shell/complete building with a tenant already designated, a Tenant Improvement permit ending in a Certificate of Occupancy (new tenant or occupancy-classification change), and a construction-free Certificate of Occupancy Only application for a like-for-like change of tenant or owner with no occupancy-classification change.

Verified 2026-08-02 · Source

Requirements

  • A TI permit is required for tenant improvements, including finishing or remodeling of an existing building or tenant space, per Nampa's Commercial FAQ
  • A TI permit is also required for any Change of Occupancy for an existing commercial building or tenant space, even without significant remodeling
  • Per Nampa's Commercial FAQ, changes to or within certain use categories always require a TI permit due to differing code requirements: hospitals, medical or dental offices, custodial care and halfway houses, daycares, schools, hair salons, barbershops, restaurants, assembly uses, and storage or factory uses
  • A simple change of tenant or building owner with no change in occupancy classification and no remodeling may instead use a Certificate of Occupancy Only application in place of a full TI permit (the FAQ's own example: a law office converting to an accounting office)
  • Obtain any necessary entitlements for the specific tenant use from Planning & Zoning — they determine whether the use is allowed or requires a Conditional Use Permit — before or at submittal
  • Tenant identity, specific use, and occupancy classification must be provided at the time of TI application
  • A registered building contractor or the building owner may apply; licensed Mechanical, Electrical, and Plumbing contractors must separately purchase their own trade permits for MEP work
  • A separate sign permit, installed by an Idaho-registered contractor and obtained through Planning & Zoning, is required after the TI if new signage is planned

Required documents

  • RequiredCommercial Tenant Improvement ApplicationStandard TI application for remodeling an existing building or tenant space, ending in a Certificate of Completion or Certificate of Occupancy depending on scenario; available at cityofnampa.us/DocumentCenter/View/19176
  • OptionalCommercial Tenant Improvement Occupancy Only Application (Dec 2025)For a TI to a new shell or new complete building where a tenant is already designated at the time of application; available at cityofnampa.us/DocumentCenter/View/20131
  • OptionalCertificate of Occupancy Only Application (Feb 2023)For a like-for-like change of tenant or building owner with no occupancy-classification change and no construction — used instead of a full TI permit; available at cityofnampa.us/DocumentCenter/View/16279
  • RequiredCommercial Building Permit Checklist (revised Nov 5, 2024)Applies to TI plan submittals for the applicable scope of work — architectural, structural, electrical, mechanical, and/or plumbing plans depending on what the tenant improvement touches; available at cityofnampa.us/DocumentCenter/View/19171
  • OptionalEnergy Code Compliance (ComCheck)Required if the tenant improvement alters the building envelope, mechanical systems, or lighting, per 2018 IECC

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based per Nampa Exhibit A Schedule of Permit Fees$22.20 flat (≤$500) up to $5,299.94 for the first $1,000,000 plus $3.45 per additional $1,000 above that — same valuation table used for all Nampa building permitsNampa Exhibit A Schedule of Permit Fees (Dec 21, 2021); applies unless otherwise stated
Plan Review Fee65% of the building permit feeNampa Exhibit A item 5: assessed for all Building Occupancies, invoiced at intake
Commercial MEP sub-contractor permit — valuation-based2.68% of project value up to $20,000; $536.00 plus 1.61% of the portion exceeding $20,000 (up to $50,000); $1,019.00 plus 0.80% of the portion exceeding $50,000 (up to $100,000); $1,419.00 plus 0.54% of the portion exceeding $100,000 above thatNampa Exhibit A — Commercial Project Subcontractor Scope of Work Valuation Table, quoted as printed (the source's own top-bracket label reads 'over $1,000,000' though the formula continues from the $100,000 breakpoint — reproduced as-is rather than silently corrected). Add the $36.00 base fee below.
Commercial sub-trade Base Permit Fee$36.00Applies to all MEP permits in this section per Nampa Exhibit A
Reinspection (after first reinspection for same item)$55.00 flat fee

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nampa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/canyon-county/nampa/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 9e5cbba

Reproducible from PermitBase’s version-controlled dataset, commit 9e5cbba.