Skip to main content
PermitBase

This is PermitBase’s published record for Nampa as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Nampa building permits

Verified

Nampa, Idaho — as published 2026-07-20.

Verified 2026-06-29 · Source

Codes adopted

2018 International Residential Code (IRC)2018 International Building Code (IBC)2018 International Existing Building Code (IEBC)2018 International Fire Code (IFC)2018 International Energy Conservation Code (IECC) — Residential and Commercial2018 International Mechanical Code (IMC)2018 International Fuel Gas Code (IFGC)2017 Idaho State Plumbing Code2023 National Electrical Code (NEC)2009 ICC/ANSI/A117.1 (Accessibility)2015 NFPA A30 Code for Motor Fuel Dispensing Facilities and Repair Garages2015 NFPA 99 Health Care Facilities Code

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for all new one- and two-family dwellings in Nampa. Covers new single-family homes, duplexes, and associated systems. Apply online through the CSS portal or in person at 500 12th Ave S.

Verified 2026-06-29 · Source

Requirements

  • Verify proposed use with Planning & Zoning before applying
  • Submit application through CSS online portal or in person
  • Plans must comply with 2018 IRC and 2018 IECC
  • Planning & Zoning Initial Review of Compliance required before submittal
  • Approved plans must remain on site during all inspections
  • Permit communication sent via email from noreply@cityofnampa.us — do not mark as spam

Required documents

  • RequiredNew Residential Building Permit Application & Checklist (Feb 2026)Official Nampa building permit application and submittal checklist for new residential construction; available at cityofnampa.us/DocumentCenter/View/20380
  • RequiredConstruction DrawingsComplete plan set including site plan, floor plans, elevations, sections, and structural details
  • RequiredEnergy Code Compliance DocumentationRescheck or equivalent demonstrating compliance with 2018 IECC
  • OptionalIECC System Commissioning FormRequired for HVAC commissioning per 2018 IECC; available on city website

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$22.20 flatNampa Exhibit A Schedule of Permit Fees (Dec 21, 2021)
Building Permit — valuation $501 to $2,000$22.20 for first $500, plus $2.88 per each additional $100—
Building Permit — valuation $2,001 to $25,000$65.40 for first $2,000, plus $13.23 per each additional $1,000—
Building Permit — valuation $25,001 to $50,000$369.69 for first $25,000, plus $9.55 per each additional $1,000—
Building Permit — valuation $50,001 to $100,000$608.44 for first $50,000, plus $6.61 per each additional $1,000—
Building Permit — valuation $100,001 to $500,000$938.94 for first $100,000, plus $5.29 per each additional $1,000—
Plan Review Fee65% of the building permit feeAssessed at intake; Nampa Exhibit A item 6
New Residential (R-3/R-4) Plumbing/Mechanical/Electrical sub-permit — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee
New Residential (R-3/R-4) Plumbing/Mechanical/Electrical sub-permit — 2,000+ sq ft habitable area$325.00 per dwelling unit—
Reinspection (after first reinspection for same item)$55.00 flat fee—

Residential Addition / Remodel Permit

Verified

Required for additions, remodels, and structural alterations to existing one- and two-family dwellings in Nampa. Covers room additions, garage conversions, basement finishes, deck construction, and structural modifications.

Verified 2026-06-29 · Source

Requirements

  • Finishing an attic, garage, or basement to create living space
  • Adding a room, garage, carport, or attached structure
  • Moving, removing, or adding walls
  • Decks more than 12 inches above grade
  • Retaining walls 4 feet or more in height (bottom of footing to top of wall), or 2-foot retaining walls with a slope/surcharge
  • Build or enclose a patio cover, porch, or carport
  • Replacement of windows or doors where the opening is structurally modified

Required documents

  • RequiredResidential Addition Building Permit Application & Checklist (Oct 2024)Official Nampa addition permit application; available at cityofnampa.us/DocumentCenter/View/18792
  • OptionalResidential Remodel Permit Application & Checklist (Oct 2024)For remodel scope; available at cityofnampa.us/DocumentCenter/View/18793
  • RequiredConstruction DrawingsPlans showing scope of work, dimensions, structural details, and connection to existing structure

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based per Exhibit A Table$22.20 (≤$500); $22.20 + $2.88/$100 ($501–$2,000); $65.40 + $13.23/$1,000 ($2,001–$25,000); $369.69 + $9.55/$1,000 ($25,001–$50,000); etc.Nampa Exhibit A Schedule of Permit Fees (Dec 2021)
Plan Review Fee65% of the building permit feeAssessed at intake
Plumbing extras (additions/remodels) — fixtures$36.00 base + $15.00 per fixtureNampa Exhibit A — Miscellaneous Fees for Plumbing sub-trade permits
Electrical extras (additions/remodels) — each circuit extension$36.00 base + $15.00 per circuit extensionNampa Exhibit A — Miscellaneous Fees for Electrical sub-trade permits
Mechanical extras (additions/remodels) — equipment$36.00 base + $15.00 per piece of mechanical equipmentNampa Exhibit A — Miscellaneous Fees for Mechanical sub-trade permits
Reinspection (after first reinspection for same item)$55.00 flat fee—

Residential Electrical Permit

Verified

Required for all electrical wiring installations, equipment changes, or wiring modifications in Nampa residences, including panel upgrades, new circuits, service changes, and EV charger installations. All work must comply with the 2023 National Electrical Code.

Verified 2026-06-29 · Source

Requirements

  • All electrical wiring installations, equipment changes, or any wiring installations require a permit before commencing work
  • Work must be performed by a state-licensed journeyman electrician employed by a state-licensed electrical contractor
  • Homeowner exception: owner of a single-family or two-family dwelling (R-3/U-1 occupancy) may perform own electrical work if residing in the dwelling within 12 months after completion
  • Hardship exception: immediate family member may perform work for a family member unable to perform it themselves

Required documents

  • RequiredElectrical Permit Application (2024)Nampa Building Department electrical permit application; available at cityofnampa.us/DocumentCenter/View/18813

Fee schedule

Fee typeAmountNotes
New residential dwelling (R-3/R-4) electrical — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee (includes plumbing, electrical, and mechanical under same flat rate)
New residential dwelling (R-3/R-4) electrical — 2,000+ sq ft habitable area$325.00 per dwelling unit—
Residential electrical (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee applies to all residential sub-trade permits for additions/remodels
Main or sub-main electrical service (residential, additions/remodels)$55.00Nampa Exhibit A — Electrical Extras: 'Main and Sub-Main electrical services (residential only) $55.00'
Each circuit extension (residential, additions/remodels)$15.00 per circuitNampa Exhibit A — Electrical Extras
Miscellaneous electrical equipment (residential, additions/remodels)$15.00 per itemNampa Exhibit A — Electrical Extras
Temporary electrical service (residential only)$55.00Nampa Exhibit A — Electrical Extras
Reinspection (after first reinspection for same item)$55.00 flat fee—

Residential Plumbing Permit

Verified

Required for all plumbing piping and drainage work in Nampa residences, including fixture additions, water and sewer line work, and water heater replacements. Governed by the 2017 Idaho State Plumbing Code.

Verified 2026-06-29 · Source

Requirements

  • All plumbing piping and drainage work except emergency repairs to leaks or replacing broken fixtures in kind
  • Must be performed by a state-licensed journeyman plumber employed by an Idaho-licensed plumbing contractor
  • Excavation contractors for sewer/water service lines outside the building envelope must hold Idaho health district septic certification or Idaho public works excavator license
  • Homeowner exception: owner of R-3/U-1 occupancy may perform own plumbing if residing in dwelling within 180 days after completion
  • Hardship exception: immediate family member may perform work for family member unable to do so

Required documents

  • RequiredPlumbing Permit Application (2024)Nampa Building Department plumbing permit application; available at cityofnampa.us/DocumentCenter/View/18815

Fee schedule

Fee typeAmountNotes
New residential dwelling (R-3/R-4) plumbing — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee (covers installations within the dwelling unit)
New residential dwelling (R-3/R-4) plumbing — 2,000+ sq ft habitable area$325.00 per dwelling unit—
Residential plumbing (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee for all residential sub-trade addition/remodel permits
Sewer line (new or replacement)$55.00Nampa Exhibit A — Plumbing Extras
Water line (new or replacement)$55.00Nampa Exhibit A — Plumbing Extras
Fixtures (additions and remodels) — per fixture$15.00 per fixtureNampa Exhibit A — Plumbing Extras; applies per toilet, sink, shower, bathtub, water heater, etc.
Reinspection (after first reinspection for same item)$55.00 flat fee—

Residential Mechanical / HVAC Permit

Verified

Required for all mechanical equipment installations in Nampa residences, including furnaces, air conditioners, heat pumps, gas piping, ductwork, gas fireplaces, and HVAC replacements. Governed by the 2018 International Mechanical Code and 2018 International Fuel Gas Code.

Verified 2026-06-29 · Source

Requirements

  • All mechanical equipment installations require a permit before work begins
  • Must be performed by a licensed mechanical contractor holding a valid Idaho Contractor's License
  • Gas piping installers must hold a state of Idaho gas piping license
  • Homeowner exception: owner of R-3/R-4/U occupancy may perform own mechanical work if residing in dwelling within 180 days after completion
  • Hardship exception: immediate family member may perform work for family member unable to do so
  • Unvented gas fireplaces require supplemental whole-house ventilation strategy (Nampa local amendment to IMC section 903)

Required documents

  • RequiredMechanical Permit Application (2024)Nampa Building Department mechanical permit application; available at cityofnampa.us/DocumentCenter/View/18814

Fee schedule

Fee typeAmountNotes
New residential dwelling (R-3/R-4) mechanical — under 2,000 sq ft habitable area$180.00 per dwelling unitNampa Exhibit A — New Group R sub-contractor permit fee (covers installations within the dwelling unit)
New residential dwelling (R-3/R-4) mechanical — 2,000+ sq ft habitable area$325.00 per dwelling unit—
Residential mechanical (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee for all residential sub-trade addition/remodel permits
Mechanical equipment (residential, additions/remodels) — per appliance$15.00 per piece of equipmentNampa Exhibit A — Mechanical Extras: 'Mechanical equipment (residential only) $15.00'
Venting without new appliance (residential only)$15.00Nampa Exhibit A — Mechanical Extras
Gas piping pressure test$15.00Nampa Exhibit A — Mechanical Extras
Reinspection (after first reinspection for same item)$55.00 flat fee—

Residential Roofing Permit (Re-roof)

Verified

Required for re-roofing existing residential structures in Nampa, including both overlay and complete tear-off/re-roof projects. Also required for replacement of siding or stucco on existing homes.

Verified 2026-06-29 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Re-roofing overlay
  • Replacement of siding or stucco on existing house

Required documents

  • RequiredResidential Reroof Permit ApplicationNampa Building Department reroof application; available at cityofnampa.us/DocumentCenter/View/18246

Fee schedule

Fee typeAmountNotes
Residential Reroof — building permit (valuation-based)Per Exhibit A valuation table; residential re-roofs typically fall in $22.20–$65.40 range for most projectsNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Plan Review Fee65% of the building permit feeAssessed at intake
Reinspection (after first reinspection for same item)$55.00 flat fee—

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems on residential properties in Nampa. A dedicated Solar Permit Application packet is available from the city.

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Submit the Nampa Solar Permit Application packet
  • Electrical work must comply with 2023 NEC
  • Structural roof load calculations required

Required documents

  • RequiredResidential Solar Permit Application PacketNampa's dedicated solar permit application packet; available at cityofnampa.us/DocumentCenter/View/15796
  • RequiredSolar Site PlanRoof plan or ground layout showing panel placement and access pathways
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel
  • RequiredStructural Analysis / Roof Load CalculationConfirming existing roof structure can support panel weight; roof snow load in Nampa is 25 PSF minimum

Fee schedule

Fee typeAmountNotes
Solar permit — building permit (valuation-based)Per Exhibit A valuation table based on project valueNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Plan Review Fee65% of the building permit feeAssessed at intake
Electrical sub-permit for solar wiring (additions/remodels)$36.00 base + $15.00 per circuit extension + $15.00 miscellaneous equipmentNampa Exhibit A — Electrical Extras
Reinspection (after first reinspection for same item)$55.00 flat fee—

Electric Vehicle (EV) Charger Permit

Verified

Nampa does not publish a separate EV-charger permit type, but its Residential Electrical Permit page explicitly names EV charger installations as covered work: the permit is 'required for all electrical wiring installations, equipment changes, or wiring modifications in Nampa residences, including panel upgrades, new circuits, service changes, and EV charger installations.' Work must comply with the 2023 NEC and is billed under the same Electrical Extras fee lines used for any new circuit, service, or equipment addition.

Verified 2026-07-20 · Source

Requirements

  • A permit is required before commencing any EV charger installation, whether it is a new dedicated circuit, an equipment/outlet addition, or a panel/service upgrade
  • Work must be performed by a state-licensed journeyman electrician employed by a state-licensed electrical contractor, per the 2023 National Electrical Code
  • Homeowner exception: the owner of a single-family or two-family (R-3/U-1) dwelling may perform the EV charger circuit work themselves if residing in the dwelling within 12 months after completion
  • Apply via the Electrical Permit Application (2024) form to the Nampa Building Department

Required documents

  • RequiredElectrical Permit Application (2024)Nampa Building Department electrical permit application; describe scope as EV charger installation (new circuit/equipment or service upgrade)

Fee schedule

Fee typeAmountNotes
Residential electrical (additions/remodels) — base fee$36.00 baseNampa Exhibit A — base fee applies to all residential sub-trade permits for additions/remodels, including an EV charger circuit
Each circuit extension (residential, additions/remodels) — applies to a new dedicated EV charger circuit$15.00 per circuitNampa Exhibit A — Electrical Extras
Miscellaneous electrical equipment (residential, additions/remodels) — applies to the EV charger unit itself$15.00 per itemNampa Exhibit A — Electrical Extras
Main or sub-main electrical service (residential, additions/remodels) — applies if a panel/service upgrade is needed for a higher-amperage Level 2 charger$55.00Nampa Exhibit A — Electrical Extras

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of a new accessory dwelling unit on a residential property in Nampa. Nampa provides a dedicated ADU Building Permit Application & Checklist.

Verified 2026-06-29 · Source

Requirements

  • Verify ADU is permitted in the property's zoning district with Planning & Zoning
  • Submit Residential ADU Building Application & Checklist
  • Plans must comply with 2018 IRC
  • Trade sub-permits (electrical, plumbing, mechanical) required separately

Required documents

  • RequiredResidential ADU Building Application & Checklist (Oct 2024)Nampa's dedicated ADU permit application and checklist; available at cityofnampa.us/DocumentCenter/View/18798
  • RequiredConstruction DrawingsFull construction drawings including site plan, floor plans, elevations, and structural details
  • RequiredEnergy Code Compliance DocumentationRescheck or equivalent demonstrating 2018 IECC compliance for the ADU

Fee schedule

Fee typeAmountNotes
ADU Building Permit — valuation-based per Exhibit APer Nampa Exhibit A valuation table; plan review is 65% of permit feeNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Reinspection (after first reinspection for same item)$55.00 flat fee—

Accessory Structure Permit

Verified

Required for detached sheds, garages, barns, pole barns, and similar accessory structures on residential properties in Nampa when the structure exceeds 200 square feet. Structures of any size require a permit if hardwired with a 120V electrical system.

Verified 2026-06-29 · Source

Requirements

  • Detached accessory structure exceeding 200 square feet requires a building permit
  • Any structure hardwired with a 120V electrical system requires a permit regardless of size
  • Structures under 200 sq ft with no electrical do not require a permit (confirm with Planning & Zoning re: setbacks and easements)
  • Pole barn type structures require structural engineering by an Idaho-licensed engineer
  • Standalone gazebo/pergola structures exceeding 200 sq ft require a permit

Required documents

  • RequiredAccessory Structure Permit Application & Checklist (Oct 2024)Nampa's dedicated accessory structure application; available at cityofnampa.us/DocumentCenter/View/18803
  • OptionalPole Barn HandoutNampa guidance for pole barn construction; available at cityofnampa.us/DocumentCenter/View/15867

Fee schedule

Fee typeAmountNotes
Accessory Structure — building permit (valuation-based)Per Exhibit A valuation table; plan review is 65% of permit feeNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Reinspection (after first reinspection for same item)$55.00 flat fee—

Residential Pool Permit

Verified

Required for in-ground and above-ground swimming pools on residential properties in Nampa when the pool exceeds 48 inches in depth or 5,000 gallons. Prefabricated above-ground pools less than 48 inches deep and under 5,000 gallons accessory to an R-3 occupancy are exempt from permit requirements.

Verified 2026-06-29 · Source

Requirements

  • In-ground swimming pools require a building permit
  • Above-ground pools exceeding 48 inches in depth or 5,000 gallons require a permit
  • Prefabricated above-ground pools less than 48 inches deep, under 5,000 gallons, installed entirely above ground, accessory to R-3 — exempt
  • Electrical work for pool bonding and pump requires a separate electrical permit
  • Fencing around pool required per IRC

Required documents

  • RequiredResidential Pool Permit Application & Checklist (Oct 2024)Nampa's dedicated pool permit application; available at cityofnampa.us/DocumentCenter/View/18794

Fee schedule

Fee typeAmountNotes
Pool permit — building permit (valuation-based)Per Exhibit A valuation table; plan review is 65% of permit feeNampa Exhibit A Schedule of Permit Fees (Dec 2021)
Reinspection (after first reinspection for same item)$55.00 flat fee—

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nampa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-29)Later version (2026-08-02) →View current record →All versions →

Permalink: /idaho/canyon-county/nampa/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 69ab9bb

Reproducible from PermitBase’s version-controlled dataset, commit 69ab9bb.