How to schedule
Inspections are requested through the building department below.
- Address
- 941 18th Street, P.O. Box 147, Heyburn, ID 83336 (residential permit application header also prints ZIP 83303-1907; the city's own website and general contact pages consistently use 83336)
- Phone
- 208-679-8158
- cdd@heyburncity.org
- Office hours
- Monday–Friday, 9:00 AM to 5:00 PM, per heyburn.id.gov/planning-building. Fax 208-679-2438. Building Inspector: Jerome Fagaldefeg (jfagaldefeg@heyburncity.org); Building Official: Tony Morley (tmorley@heyburncity.org); Community Development Director serves as the appointed Building Official per Heyburn City Code 2-1-1(B).
- Website
- Official site
Inspection sequence
Applies to: Residential Home Permit (New Construction — Single Family, Duplex, Zero Lot Line, Townhouse)
- 1
Foundation
Foundation inspection per the cross-section, footing, j-bolt, stem wall, and rebar details required on the Residential New Home Checklist.
- 2
Framing
Framing inspection covering floor joists, wall bracing design, roof framing/truss layout, and header/beam sizing per the checklist.
- 3
Final / Certificate of Occupancy
Final inspection required before a Certificate of Occupancy is issued; no occupancy is allowed and utilities will not be enabled until the Certificate of Occupancy is issued, per the Residential Home Permit Application. A temporary C of O is available for incomplete work under extenuating circumstances (e.g., frozen ground) for a $1,000 refundable fee.
Applies to: Solar Photovoltaic (PV) Permit
- 1
State Electrical Inspection
Performed by an Idaho DOPL inspector; wiring, disconnect placement, and interconnection point verified before energizing; renewable energy installations require a plan check prior to this final inspection
- 2
City Final Inspection (Building)
Racking/roof-penetration attachment and structural compliance verified; a Certificate of Occupancy is required before utilities are enabled, per the City's application form
Final inspection only: EV Charger / EVSE Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heyburn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Heyburn building permits
Get alerts for Heyburn
We'll email you when Heyburn's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.