Skip to main content
PermitBase

EV Charger / EVSE Permit in Heyburn, Idaho

Heyburn has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Unlike solar/renewable-energy installations (which require both a City structural Building Permit and a State electrical permit), a standard EV charger is not a power-generation or energy-storage system and involves no structural/racking work, so it does not trigger the City's Residential Home Permit. The wiring/circuit work is billed as a standard electrical installation under the State of Idaho DOPL Contractor (or Homeowner) Electrical Permit, since Heyburn's own permit application states directly that 'Additional permits are required for electrical, plumbing and mechanical installations' and the City has no electrical-permit program of its own -- using the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox).

Verified 2026-07-20 · Source

When you need this permit

  • No City of Heyburn building permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved
  • Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City -- Heyburn has no electrical-permit program of its own
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State DOPL Electrical Permit -- Other Installations, up to $10,000 system costIdaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form. This is a state fee, not collected by the City of Heyburn.
(total cost of system x 0.02) + $60
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system costIdaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022
((total cost of system - $10,000) x 0.01) + $260

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Heyburn?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Performed by an Idaho DOPL inspector; charger circuit, disconnect, and GFCI/load-management compliance verified before energizing

See the full Heyburn inspection guide — scheduling & re-inspection fees →

Tips

  • Heyburn does not have an EV-specific permit or fee -- a home or business EV charger install is just a standard State of Idaho DOPL electrical permit, priced under the general 'Other Installations' valuation formula, since the City has no electrical program of its own.
  • No City of Heyburn Residential Home Permit is needed for a standard EV charger install since it is not a power-generation/energy-storage system and involves no structural/racking work (unlike rooftop solar, which does trigger the City's Building Permit for the structural scope).

Frequently asked questions

Heyburn requires an ev charger / evse permit for: No City of Heyburn building permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved; Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City -- Heyburn has no electrical-permit program of its own; On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all; Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way. If your project isn't listed, confirm with City of Heyburn Building Department (Community Development) at 208-679-8158 before starting work.

In Heyburn, the published State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost is: (total cost of system x 0.02) + $60. Additional published fees: State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost — ((total cost of system - $10,000) x 0.01) + $260. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Heyburn does not publish a plan-review timeline for this permit. Contact City of Heyburn Building Department (Community Development) at 208-679-8158 for current turnaround.

You'll need: Idaho DOPL Contractor (or Homeowner) Electrical Permit Application. See the required-documents checklist on this page for details on each.

Heyburn requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection. Schedule each through City of Heyburn Building Department (Community Development) (208-679-8158).

Apply through City of Heyburn Building Department (Community Development) at 941 18th Street, P.O. Box 147, Heyburn, ID 83336 (residential permit application header also prints ZIP 83303-1907; the city's own website and general contact pages consistently use 83336). Phone: 208-679-8158, email: cdd@heyburncity.org. Office hours: Monday–Friday, 9:00 AM to 5:00 PM, per heyburn.id.gov/planning-building. Fax 208-679-2438. Building Inspector: Jerome Fagaldefeg (jfagaldefeg@heyburncity.org); Building Official: Tony Morley (tmorley@heyburncity.org); Community Development Director serves as the appointed Building Official per Heyburn City Code 2-1-1(B)..

Heyburn, Idaho has adopted: 2018 International Residential Code (IRC), with Idaho amendments — per Heyburn's own Residential Home Permit Application Plan Submittal Requirements: 'Plans to be designed to the 2018 IRC Code & 2018 IECC. (with Idaho amendments)' (heyburn.id.gov, 2023 Residential New Home Permit application, page 2).; 2018 International Energy Conservation Code (IECC), with Idaho amendments — same source as above.; 2018 International Building Code (IBC), with amendments — Heyburn City Code Title 2, Chapter 1, Section 2-1-1(A) adopts by reference 'the following recognized codes as currently adopted by the State of Idaho,' and the State of Idaho's own currently-published adopted-codes list (Idaho DOPL, 'Idaho Adopted Codes,' dopl.idaho.gov/wp-content/uploads/2025/06/2025-Updated-Idaho-Adopted-Codes.pdf) lists the 2018 IBC with amendments as the current state building code.; 2018 International Existing Building Code (IEBC) — per the same Idaho DOPL 'Idaho Adopted Codes' publication, incorporated into Heyburn's code by the automatic state-code-reference mechanism in Heyburn City Code 2-1-1(A).; 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) — per the same Idaho DOPL 'Idaho Adopted Codes' publication.; 2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code) — per the same Idaho DOPL 'Idaho Adopted Codes' publication.; 2023 National Electrical Code (NEC), with amendments — per the same Idaho DOPL 'Idaho Adopted Codes' publication.; IMPORTANT — code-adoption mechanism: Heyburn City Code 2-1-1(A) (amd. Ord. 2026-721, 3-25-2026; Ord. 2026-722, 4-22-2026; codelibrary.amlegal.com/codes/heyburnid/latest/heyburn_id/0-0-0-15510) states verbatim: 'The following recognized codes as currently adopted by the State of Idaho are adopted as the official building codes of the City of Heyburn. Each code shall be deemed superseded by successive versions of such codes as they are adopted or approved by the State of Idaho effective on the 1st day of January the year following the date any such codes are made effective for the State of Idaho, unless a different date is required by state statute.' This means Heyburn's adopted editions track the State of Idaho's current adopted editions automatically, rather than being independently re-adopted by city ordinance edition-by-edition. The city's own 2023-dated Residential and Commercial permit application PDFs both independently confirm the 2018 IRC/2018 IECC editions currently in force, consistent with the state list.; NOTE: No Heyburn-specific local amendment TEXT to the IRC/IBC (e.g., a snow-load or seismic design value table, or textual deviations from the model code sections) was found published separately from the state-level amendments referenced above, as of 2026-07-04. Omitted rather than invented.. Local amendments apply — see the Heyburn overview page for the full list.

No. Heyburn has no dedicated EV/EVSE permit or fee line item. Installing a home or business EV charger only requires a standard State of Idaho DOPL electrical permit (Heyburn has no electrical-permit program of its own), priced under the general 'Other Installations' valuation-based formula. No City of Heyburn structural building permit is required.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heyburn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.