Lewiston building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Lewiston, Idaho.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 215 D Street, Lewiston, ID 83501 (P.O. Box 617, Lewiston, ID 83501)
- Phone
- (208) 746-1318, option 1 for Permit Representatives
- Office hours
- Monday-Friday, 8:00 AM to 5:00 PM. Building Official: Jeff Wolfe, (509) 254-3275, jwolfe@cityoflewiston.org. Permit Representatives: Lorrie Tanguay, (208) 746-1318 ext. 7203; Adrian Miller, (208) 746-1318 ext. 7263.
- Website
- Official site
Inspection sequence
Applies to: Residential New Home Building Permit (New Single Family Dwelling/Duplex)
- 1
Foundation/Footing
Required prior to concrete pour, consistent with the adopted 2018 IRC.
- 2
Rough-In (Electrical, Mechanical, Plumbing)
Trade rough-in inspections for the separately permitted electrical, mechanical, and plumbing scopes.
- 3
Framing
Structural framing inspection after rough-ins are signed off.
- 4
Final
Final building and trade inspections prior to occupancy.
Applies to: Solar PV Permit (Alternative Energy)
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover, consistent with the adopted 2023 NEC.
- 2
Framing/Structural (if a building permit applies)
Racking and roof-penetration/structural attachment inspection prior to cover.
- 3
Final
Final electrical inspection; system energized and verified.
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring, panel, and grounding inspection consistent with the adopted 2023 NEC.
- 2
Final
Final electrical inspection.
Applies to: Mechanical Permit (HVAC, Gas Work)
- 1
Rough Mechanical
Ductwork, gas line, and equipment inspection consistent with the adopted 2018 IMC.
- 2
Final
Final mechanical inspection.
Applies to: Plumbing Permit
- 1
Underground/Rough-In
Pipe slope, materials, and cleanouts verified before walls/slab closed.
- 2
Final
Final plumbing inspection.
Applies to: Swimming Pool Permit
- 1
Electrical/Bonding
Pool bonding grid and electrical protection, billed per inspection under the Electrical Permit Fees schedule.
- 2
Final
Final building inspection.
Final inspection only: Demolition Permit, EV Charger / Electric Vehicle Charging Station Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewiston building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Lewiston building permits
Get alerts for Lewiston
We'll email you when Lewiston's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.