Residential New Home Building Permit (New Single Family Dwelling/Duplex) — Lewiston, Idaho · Requirements sheet
Verified 2026-07-04 · Source: https://www.cityoflewiston.org/227/Building-Services
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential New Home Building Permit (New Single Family Dwelling/Duplex) in Lewiston, Idaho
Required for construction of new one- and two-family dwellings in the City of Lewiston, reviewed against the 2018 IRC and 2018 IECC as locally adopted and administered by the City of Lewiston Building Services division of Community Development. Applications are submitted via the online permit portal (GovWell) or through Building Services staff.
Verified 2026-07-04 · Source
When you need this permit
- Building permit required whenever a building or structure regulated by the code is altered, constructed, converted, demolished, enlarged, erected, improved, moved, removed, or repaired — City of Lewiston Permits Needed page
- Plans reviewed against the 2018 IRC and 2018 IECC as adopted by the City of Lewiston
- Building valuation calculated per IBC Section 109.3 as adopted and amended by the City of Lewiston, per the FY2026 Fee Schedule
- Separate electrical, plumbing, and mechanical permits required for all trade work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Required prior to concrete pour, consistent with the adopted 2018 IRC.
- 2
Rough-In (Electrical, Mechanical, Plumbing)
Trade rough-in inspections for the separately permitted electrical, mechanical, and plumbing scopes.
- 3
Framing
Structural framing inspection after rough-ins are signed off.
- 4
Final
Final building and trade inspections prior to occupancy.
See the full Lewiston inspection guide — scheduling & re-inspection fees →
Tips
- New Single Family/Duplex plan review has a maximum turnaround of 14 calendar days (8 days for minor revisions) per the City of Lewiston Permit Review Schedule page — a shorter published maximum than Commercial's 21-day maximum.
- Electrical, mechanical, and plumbing permits for a new single-family dwelling are each a separate flat fee ($216.56 covering up to 1,500 sq ft) in addition to the valuation-based Building Permit Fee — confirm all four permits (building + 3 trades) are filed.
- For larger projects, applicants may request a preliminary Development Review Committee (DRC) meeting, where representatives from multiple City departments review the project together on a weekly basis.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewiston building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lewiston
Residential New Home Building Permit (New Single Family Dwelling/Duplex) in other cities
Compare residential new home building permit (new single family dwelling/duplex) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Lewiston project checklist
Describe your project once and get every permit, document, and fee it triggers in Lewiston — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →