EV Charger / Electric Vehicle Charging Station Permit in Lewiston, Idaho
The City of Lewiston has no dedicated EV-charger or EVSE permit type or fee line in its FY2026 Fee Schedule (Resolution 2025-39). Installing a Level 2 (240V) home EV charger requires a City of Lewiston Electrical Permit, billed under the existing 'Residential Electrical Fees -- Existing Residence' line (one circuit included, per-additional-circuit fee applies), issued by City of Lewiston Building Services per the adopted 2023 NEC.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit application submitted to City of Lewiston Building Services for the new dedicated EV charger circuit
- Billed under the 'Existing Residence (one circuit included)' residential electrical fee line, with an additional per-branch-circuit charge if more than one new circuit is added, capped at the corresponding new-single-family-dwelling square-footage fee
- If the installation is at a commercial, multi-family (3+ units), or industrial property, or involves a dedicated commercial EVSE installation, it is billed instead under the valuation-based 'Commercial, Multi-family, Industrial, and Alternative Energy Electrical Fees' schedule
- If a panel upgrade or new/upsized electrical service is required to support the charger's amperage draw, that work is billed under the applicable service-upgrade or new-dwelling electrical fee lines rather than the additional-circuit line
- Work performed within Lewiston city limits; unincorporated Nez Perce County work is instead permitted through the County
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Final Inspection
New circuit, breaker sizing, and disconnect (if required by the charger manufacturer) verified by City of Lewiston Building Services before energizing
See the full Lewiston inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated 'EV charger' or 'EVSE' line item on the City of Lewiston's fee schedule -- a home Level 2 charger circuit is billed under the same 'Existing Residence' electrical line used for any other new branch circuit.
- If your panel has spare capacity, expect the flat $72.20 additional-circuit fee; if a service/panel upgrade is also needed, that work is billed under the higher new-dwelling or service-upgrade fee lines instead.
- Commercial or multi-family EV charging installations (e.g., at an apartment complex or business) are billed under the valuation-based Commercial/Alternative Energy schedule, not the flat residential circuit fee.
- Confirm whether your installation is inside Lewiston city limits or unincorporated Nez Perce County before applying -- the County issues its own separate trade permits for outside-city work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewiston building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lewiston
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Idaho →
Look up this fee in a different city →