This is PermitBase’s published record for American Falls as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

American Falls building permits

Verified

American Falls, Idaho — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

International Code (2018) — City of American Falls adopts the 2018 edition of the International Code family (International Building Code and related I-Codes) for Building Permit (City) reviewUniform Fire Code (2018), as adopted by the City of American FallsIdaho State Plumbing Code and mechanical/HVAC code — administered and inspected by the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of American FallsNational Electrical Code (NEC) — administered and inspected by DOPL, not the City of American Falls

Permit types & fees

Consolidated Building-Development Permit (New Construction, Additions, Alterations, Repairs, Moving, Demolition, Signs, Grading)

Verified

The City of American Falls uses a single Consolidated Building-Development Permit Application for all classes of construction work within city limits, including new construction, additions, alterations, repairs, moving a structure, demolition, sign installation, and grading. The applicant checks the applicable 'Class of Work' box on one unified form; the City does not publish separate permit-type applications or separate fee schedules for these work classes. Plumbing, HVAC, and electrical permitting/inspection are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City.

Verified 2026-07-07 · Source

Requirements

  • Property located within the incorporated areas of the City of American Falls (properties in the City's impact area outside city limits are instead routed to the Power County Building Administrator's office, with fees payable to Power County)
  • Legal description or address of the property where work is proposed
  • A description of the work proposed (e.g., 'construction of a new dwelling')
  • Applicant's name and address
  • Builder's name and business address
  • One set of plans clearly showing all work on the building and where the building sits on the property
  • For new dwellings: one 8.5"x11" site plan, plus foundation, floor, and roof plans, elevations, and braced wall panel requirements per the I.B.C., with cross sections showing construction details
  • Estimated fair market value of the completed project (materials, labor, and cost of all work, even owner-performed labor) for permit fee calculation

Required documents

  • RequiredConsolidated Building-Development Permit ApplicationCity of American Falls form; applicant completes top portion including work class (Grading/New/Addition/Alteration/Repair/Move/Demolish/Sign), legal description, owner/contractor/architect/lender info, and describes the work; a site plan must be attached
  • RequiredSite Plan / Construction DrawingsFor new single-family dwellings: site plan, foundation plan, floor plan, roof plan, elevations, braced wall panel requirements per IBC, and cross sections showing construction details

Fee schedule

Fee typeAmountNotes
Building Permit — total valuation $1.00 to $500.00$23.50City of American Falls Building Fees schedule (cityofamericanfalls.com/building-fees/)
Building Permit — total valuation $501.00 to $2,000.00$23.50 for the first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00
Building Permit — total valuation $2,001.00 to $25,000.00$69.25 for the first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
Building Permit — total valuation $25,001.00 to $50,000.00$391.75 for the first $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
Building Permit — total valuation $50,001.00 to $100,000.00$643.75 for the first $50,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Building Permit — total valuation $100,001.00 to $500,000.00$993.75 plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00
Published verbatim on the City's own fee schedule as '$993.75 for the first $1,000,000.00 plus $5.60...' — this appears to be a typo carried over in the City's own published table (the base amount… Show full citation

Published verbatim on the City's own fee schedule as '$993.75 for the first $1,000,000.00 plus $5.60...' — this appears to be a typo carried over in the City's own published table (the base amount $993.75 is consistent with the standard first-$100,000 tier used in comparable Idaho valuation tables, and the tier is bounded 'to and including $500,000.00'); transcribed here exactly as published by the City pending any future correction by American Falls.

Building Permit — total valuation $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000.00, plus $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00
Building Permit — total valuation $1,000,000.00 and up$5,608.75 for the first $1,000,000.00, plus $3.65 for each additional $1,000.00 or fraction thereof
Inspections outside of normal business hours$47.00 per hourMinimum charge of 2 hours; City of American Falls Building Fees schedule
Reinspection fee$47.00 per hourAssessed under provisions of Section 305.8; City of American Falls Building Fees schedule
Inspections for which no fee is specifically indicated$47.00 per hourMinimum charge one half hour
Additional plan review required by changes, additions, or revisions to plans$47.00 per hourMinimum charge one half hour
Use of outside consultants for plan checking and/or inspectionsActual costsCity of American Falls Building Fees schedule

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the American Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-20) →View current record →All versions →

Permalink: /idaho/power-county/american-falls/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 8de51ed

Reproducible from PermitBase’s version-controlled dataset, commit 8de51ed.