Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-07.

American Falls building permits

Verified

American Falls, Idaho — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

International Code (2018) — City of American Falls adopts the 2018 edition of the International Code family (International Building Code and related I-Codes) for Building Permit (City) reviewUniform Fire Code (2018), as adopted by the City of American FallsIdaho State Plumbing Code and mechanical/HVAC code — administered and inspected by the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of American FallsNational Electrical Code (NEC) — administered and inspected by DOPL, not the City of American Falls

Permit types & fees

Consolidated Building-Development Permit (New Construction, Additions, Alterations, Repairs, Moving, Demolition, Signs, Grading)

Verified

The City of American Falls uses a single Consolidated Building-Development Permit Application for all classes of construction work within city limits, including new construction, additions, alterations, repairs, moving a structure, demolition, sign installation, and grading. The applicant checks the applicable 'Class of Work' box on one unified form; the City does not publish separate permit-type applications or separate fee schedules for these work classes. Plumbing, HVAC, and electrical permitting/inspection are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City.

Verified 2026-07-07 · Source

Requirements

  • Property located within the incorporated areas of the City of American Falls (properties in the City's impact area outside city limits are instead routed to the Power County Building Administrator's office, with fees payable to Power County)
  • Legal description or address of the property where work is proposed
  • A description of the work proposed (e.g., 'construction of a new dwelling')
  • Applicant's name and address
  • Builder's name and business address
  • One set of plans clearly showing all work on the building and where the building sits on the property
  • For new dwellings: one 8.5"x11" site plan, plus foundation, floor, and roof plans, elevations, and braced wall panel requirements per the I.B.C., with cross sections showing construction details
  • Estimated fair market value of the completed project (materials, labor, and cost of all work, even owner-performed labor) for permit fee calculation

Required documents

  • RequiredConsolidated Building-Development Permit ApplicationCity of American Falls form; applicant completes top portion including work class (Grading/New/Addition/Alteration/Repair/Move/Demolish/Sign), legal description, owner/contractor/architect/lender info, and describes the work; a site plan must be attached
  • RequiredSite Plan / Construction DrawingsFor new single-family dwellings: site plan, foundation plan, floor plan, roof plan, elevations, braced wall panel requirements per IBC, and cross sections showing construction details

Fee schedule

Fee typeAmountNotes
Building Permit — total valuation $1.00 to $500.00$23.50City of American Falls Building Fees schedule (cityofamericanfalls.com/building-fees/)
Building Permit — total valuation $501.00 to $2,000.00$23.50 for the first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00
Building Permit — total valuation $2,001.00 to $25,000.00$69.25 for the first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
Building Permit — total valuation $25,001.00 to $50,000.00$391.75 for the first $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
Building Permit — total valuation $50,001.00 to $100,000.00$643.75 for the first $50,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Building Permit — total valuation $100,001.00 to $500,000.00$993.75 plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Published verbatim on the City's own fee schedule as '$993.75 for the first $1,000,000.00 plus $5.60...' — this appears to be a typo carried over in the City's own published table (the base amount $993.75 is consistent with the standard first-$100,000 tier used in comparable Idaho valuation tables, and the tier is bounded 'to and including $500,000.00'); transcribed here exactly as published by the City pending any future correction by American Falls.
Building Permit — total valuation $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000.00, plus $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00
Building Permit — total valuation $1,000,000.00 and up$5,608.75 for the first $1,000,000.00, plus $3.65 for each additional $1,000.00 or fraction thereof
Inspections outside of normal business hours$47.00 per hourMinimum charge of 2 hours; City of American Falls Building Fees schedule
Reinspection fee$47.00 per hourAssessed under provisions of Section 305.8; City of American Falls Building Fees schedule
Inspections for which no fee is specifically indicated$47.00 per hourMinimum charge one half hour
Additional plan review required by changes, additions, or revisions to plans$47.00 per hourMinimum charge one half hour
Use of outside consultants for plan checking and/or inspectionsActual costsCity of American Falls Building Fees schedule

EV Charger / EVSE Permit

Verified

The City of American Falls does not issue electrical permits — per the City's own Building Department guidance, plumbing, HVAC, and electrical permitting/inspection are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City. A residential EV charger / EVSE installation is electrical work and follows this same state track (permits purchased online at dbs.idaho.gov). DOPL's Contractor Electrical Permit Worksheet has no EV-charger-specific line item, but it does have the applicable general category: adding a branch circuit to an Existing Residence, Modular/Manufactured/Mobile Home, or Detached Shop is billed at a flat $65 (one circuit included) plus $10 per additional branch circuit — this is the category an EV charger circuit addition would fall under.

Verified 2026-07-20 · Source

Requirements

  • A valid Idaho DOPL electrical permit is required prior to installing an EV charger circuit — purchased online at dbs.idaho.gov, not from the City of American Falls
  • Work must comply with the National Electrical Code as adopted by the State of Idaho
  • A homeowner may obtain a DOPL Homeowner Electrical Permit for work at their own primary residence, per DOPL's published homeowner permit application

Required documents

  • RequiredIdaho DOPL Electrical Permit ApplicationPurchased/submitted online at dbs.idaho.gov, not through the City of American Falls

Fee schedule

Fee typeAmountNotes
Existing Residence / Detached Shop — additional branch circuit (covers a standalone EV charger circuit; no EV-specific line item published)$65 flat (includes one circuit), plus $10 per additional branch circuit, up to the maximum of the corresponding square footage of the buildingIdaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), page 2 of the Contractor Electrical Permit Application (dopl.idaho.gov/wp-content/uploads/2023/11/ELE-Contractor-Electrical-Permit-Application.pdf) — this is the State's statewide electrical fee mechanism, applicable in American Falls because the City does not run its own electrical permitting program. If the installation instead requires a new/upgraded electrical service, DOPL's 'Other Installations' valuation-based formula would apply instead.

Solar PV Permit

Verified

American Falls issues no separate solar-PV permit type; rooftop or ground-mounted photovoltaic installation is permitted through the City's general valuation-based Building Permit (structural/racking) for the City-issued portion, per the City's published Permit Fees schedule. Electrical work (including PV interconnection wiring) is not issued by the City — the Building Department page states Electrical and Plumbing/HVAC permits are obtained through the State of Idaho, consistent with the Idaho Division of Building Safety's (DOPL) role covering jurisdictions without their own certified local electrical program.

Verified 2026-07-20 · Source

Requirements

  • City Building Permit required for the structural/racking portion of a solar PV installation, reviewed under the 2018 International Code as adopted by the City
  • Electrical permit for PV wiring and interconnection is obtained through the State of Idaho (Division of Occupational and Professional Licenses / Division of Building Safety), not the City of American Falls — the City's own Building Department page lists Electrical Permit and Plumbing/HVAC Permit as state-issued, distinct from the City-issued Building Permit
  • Fee for the City Building Permit portion is calculated from the published valuation-based fee table (no distinct solar/PV line item exists in that table)
  • Contact the Building Department (Jeff Nelson, 208-226-2569) to confirm current solar-specific submittal requirements, as none are separately published beyond the general Building Permit process

Required documents

  • RequiredBuilding Permit Application (City)For the structural/racking portion of the solar installation
  • RequiredState of Idaho Electrical PermitObtained through the State of Idaho for PV wiring/interconnection, not issued by the City

Fee schedule

Fee typeAmountNotes
City Building Permit Fee — valuation $1 to $500$23.50City of American Falls Building Permit Fee Schedule (cityofamericanfalls.com/building-fees/); no separate solar/PV line item — solar is billed under this general valuation-based table
City Building Permit Fee — valuation $501 to $2,000$23.50 for the first $500.00 plus $3.05 for each additional $100.00City of American Falls Building Permit Fee Schedule
City Building Permit Fee — valuation $2,001 to $25,000$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00City of American Falls Building Permit Fee Schedule (typical residential rooftop PV valuation falls in this tier)
Outside-hours/reinspection/plan-modification fee$47.00 per hourCity of American Falls Building Permit Fee Schedule

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the American Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/power-county/american-falls/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 8de51ed

Reproducible from PermitBase’s version-controlled dataset, commit 8de51ed.