Version history — American Falls, Idaho
This is PermitBase’s own verified record for American Falls, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what American Falls’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-07-20Superseded
- American Falls, Idaho — EV Charger / EVSE Permit fee record added: Existing Residence / Detached Shop — additional branch circuit (covers a standalone EV charger circuit; no EV-specific line item published) ($65 flat (includes one circuit), plus $10 per additional branch circuit, up to the maximum of the corresponding square footage of the building)
- American Falls, Idaho — EV Charger / EVSE Permit fee record removed: DOPL electrical permit fee (no EV-specific line item found)
- American Falls, Idaho — Solar PV Permit record added
- American Falls, Idaho — EV Charger / EVSE Permit record added
- 2026-07-07Initial record — coverage of American Falls began