Skip to main content
PermitBase

Version history — American Falls, Idaho

This is PermitBase’s own verified record for American Falls, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what American Falls’s actual law was at that time.

Permanent link to today’s record

/idaho/power-county/american-falls/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-07-20Superseded
    • American Falls, Idaho — EV Charger / EVSE Permit fee record added: Existing Residence / Detached Shop — additional branch circuit (covers a standalone EV charger circuit; no EV-specific line item published) ($65 flat (includes one circuit), plus $10 per additional branch circuit, up to the maximum of the corresponding square footage of the building)
    • American Falls, Idaho — EV Charger / EVSE Permit fee record removed: DOPL electrical permit fee (no EV-specific line item found)
    • American Falls, Idaho — Solar PV Permit record added
    • American Falls, Idaho — EV Charger / EVSE Permit record added
  • 2026-07-07Initial record — coverage of American Falls began