Kellogg building permits
Kellogg, Idaho — as published 2026-08-26.
Reviewed 2026-08-02 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Alteration)
Required for new residential construction, additions, alterations, and demolition in the City of Kellogg. A single Building Department Permit Application form covers new construction, additions, alterations, demolition, fence installation, re-roof, siding, sign installation, mobile/manufactured home setting, and floodplain development — the applicant checks the box(es) that apply to their project.
Reviewed 2026-08-02 · Source
Requirements
- Building permit required for any and all work done on the property per the City of Kellogg Building Department
- No construction may begin until the permit is issued
- Commercial construction or new construction requires TWO SETS OF PLANS from the contractor (minimum 24"x18")
- Site plans must show boundaries and dimensions, proposed and existing structures, setbacks, roads, parking, sewer/septic facilities, and other pertinent information
- Electrical, plumbing, and mechanical work is NOT issued or inspected by the City of Kellogg — those permits are issued and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety, 1-800-955-3044, dbs.idaho.gov)
Required documents
- RequiredBuilding Department Permit ApplicationOfficial City of Kellogg building permit application covering new construction, additions, alterations, demolition, and related permit types; available as a downloadable PDF from the Building Department page
- RequiredConstruction Drawings / Site PlanTwo sets of plans (minimum 24"x18") for commercial construction or new construction; site plan showing boundaries, dimensions, structures, setbacks, roads, parking, and sewer/septic facilities
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| City of Kellogg building permit fee (structural/valuation-based) | Per Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. Show full citationHidePer Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. 642 (11-12-2025): 'Fees for building permits and related building department services shall be set by resolution of the Kellogg city council' (enabling ordinance: Ord. 481, 12-11-2002; the plan-check fee is likewise reserved to council resolution under City Code § 4-1-1.A.1, Ord. 593/616). No separate fee-schedule resolution document is published on the city's website, in the council agendas/minutes indexed at kellogg.id.gov/meetings/, or elsewhere online. Note that a similarly-named 'Building Permits' page at cityofkellogg.org (which quotes a flat $100 fee) belongs to a distinct jurisdiction, Kellogg, Minnesota, and does not apply here. Call the Building Department at (208) 786-9131 for the current council-set fee. |
Commercial Building Permit (New Construction, Additions, Alterations & Tenant Improvement)
Covers commercial new construction, additions, and alterations, including tenant-improvement and remodel work, in the City of Kellogg. Kellogg has no separate commercial or tenant-improvement permit product: a commercial project is submitted on the same Building Department Permit Application used for residential work, checking New Construction, Addition, or Alteration as applicable. Plans are reviewed against the 2018 International Building Code as adopted by the State of Idaho or the Idaho Building Code Board, per Kellogg City Code § 4-1-1.A, rather than the International Residential Code that governs Kellogg's residential building permit. The application form itself states that commercial construction or new construction requires two sets of plans from the contractor, minimum 24 by 18 inches. Building permit fees, including the plan check fee for this IBC-based review, are set by resolution of the Kellogg city council under City Code §§ 4-1-1.A.1 and 4-1-12, but no fee-schedule resolution is published on the City's website, in its code library, or in its posted council agendas and minutes; the Building Department quotes fees on application, paid by cash or check only.
Reviewed 2026-08-25 · Source
Requirements
- Building permit required for commercial new construction, additions, and alterations (including tenant-improvement and remodel work), submitted on the same City of Kellogg Building Department Permit Application used for residential work — check New Construction, Addition, or Alteration as applicable. No construction may begin until the permit is issued.
- Commercial construction or new construction requires two sets of plans from the contractor, minimum 24 inches by 18 inches, per the application form's own instructions.
- Plans are reviewed against the 2018 International Building Code as adopted by the State of Idaho or the Idaho Building Code Board, effective January 1, 2021, per Kellogg City Code § 4-1-1.A; the plan check fee for this review is reserved to a Kellogg city council resolution under the same section.
- Site plans must show boundaries and dimensions, proposed and existing structures, setbacks, roads, parking, and sewer/septic facilities.
- Electrical, plumbing, and mechanical work is not issued or inspected by the City of Kellogg — those permits are issued and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety, 1-800-955-3044, dbs.idaho.gov).
- The permit application's own approval-entity table calls for sign-off from the local fire district, Planning and Zoning, and the applicable water/sewer district and utilities prior to issuance; the fire district serving Kellogg is Silver Valley Fire Rescue, formed by a September 2025 merger of Shoshone County Fire Protection Districts 1 and 2 (the application form lists the pre-merger name, Shoshone County Fire District #2).
- Fees for building permits and associated services, including the plan check fee, are set by resolution of the Kellogg city council per City Code § 4-1-12; no fee-schedule resolution is published on the City's website, code library, or posted council agendas and minutes, so confirm the current fee with the Building Department before applying.
Required documents
- RequiredBuilding Department Permit ApplicationSame City of Kellogg building permit application used for residential work; select New Construction, Addition, or Alteration for a commercial project. Available as a downloadable PDF from the Building Department page.
- RequiredConstruction Drawings / Site PlanTwo sets of plans, minimum 24 by 18 inches, for commercial or new construction, plus a site plan showing boundaries, dimensions, structures, setbacks, roads, parking, and sewer/septic facilities.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| City of Kellogg building permit fee (structural/valuation-based) | Per Kellogg City Code § 4-1-12, fees for building permits and related building department services shall be set by resolution of the Kellogg city council (Ord. Show full citationHidePer Kellogg City Code § 4-1-12, fees for building permits and related building department services shall be set by resolution of the Kellogg city council (Ord. 481, 12-11-2002). No fee-schedule resolution document is published on the City's website, in its code library, or in its posted council agendas and minutes. Call the Building Department at (208) 786-9131 for the current council-set fee. | |
| Commercial Plan Check Fee | Kellogg City Code § 4-1-1.A.1 reserves the plan check fee for the adopted 2018 IBC (the code governing commercial construction) to a Kellogg city council resolution. Show full citationHideKellogg City Code § 4-1-1.A.1 reserves the plan check fee for the adopted 2018 IBC (the code governing commercial construction) to a Kellogg city council resolution. No plan-check fee schedule or resolution document is published on the City's website, in its code library, or in its posted council agendas and minutes. Call the Building Department at (208) 786-9131 for the current fee. |
Re-Roof Permit
Required for roof replacement or re-roofing in the City of Kellogg, including tear-off, overlay, siding-related roofing work, and metal/composition/wood shingle installations. A dedicated Re-Roof Permit Application is provided separately from the general building permit application.
Reviewed 2026-07-23 · Source
Requirements
- A pre-reroof inspection is required prior to application of new material — call (208) 661-0494 at least 24 hours in advance to schedule
- Ice shield underlayment is required
- Proper ventilation must be provided
- Dry-rot conditions, structural problems, and/or IRC requirements must be addressed
- Maximum of two roofing layers allowed on existing roof systems
- Mobile/manufactured homes with a 30 lb snow-load roof system are allowed only one roof layer unless the second application is metal
Required documents
- RequiredRe-Roof Permit ApplicationOfficial City of Kellogg re-roof permit application; available as a downloadable PDF from the Building Department page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| City of Kellogg re-roof permit fee | Per Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. Show full citationHidePer Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. 642 (11-12-2025): 'Fees for building permits and related building department services shall be set by resolution of the Kellogg city council' (enabling ordinance: Ord. 481, 12-11-2002) — the re-roof permit is issued under this same combined building-permit chapter, so the same resolution-based fee-setting applies. No separate fee-schedule resolution document is published on the city's website, in the council agendas/minutes indexed at kellogg.id.gov/meetings/, or elsewhere online. Note: a similarly-named 'Building Permits' page at cityofkellogg.org (which quotes a flat $100 re-shingle/re-side fee) belongs to a distinct jurisdiction, Kellogg, Minnesota, and does not apply here. Call the Building Department at (208) 786-9131 for the current council-set fee. |
Fence Permit
Required for fence installation or modification in the City of Kellogg. A dedicated Fence Permit Application is provided separately from the general building permit application, requiring a drawing of the fence plan including height.
Reviewed 2026-07-23 · Source
Requirements
- Attach a drawing of the fence plans including the height of the fence
- Property owner, contractor/applicant, and worksite address information required
- Tax parcel number and legal description (lot, lot size, block) required
Required documents
- RequiredFence Permit ApplicationOfficial City of Kellogg fence permit application; available as a downloadable PDF from the Building Department page
- RequiredFence DrawingDrawing of the proposed fence plans, including height
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| City of Kellogg fence permit fee | Per Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. Show full citationHidePer Kellogg City Code § 4-1-12 (Fees For Building Permits And Associated Services), current through Ord. 642 (11-12-2025): 'Fees for building permits and related building department services shall be set by resolution of the Kellogg city council' (enabling ordinance: Ord. 481, 12-11-2002) — the fence permit is issued under this same combined building-permit chapter, so the same resolution-based fee-setting applies. No separate fee-schedule resolution document is published on the city's website, in the council agendas/minutes indexed at kellogg.id.gov/meetings/, or elsewhere online; note that a similarly-named 'City of Kellogg' site at cityofkellogg.org is a distinct jurisdiction, Kellogg, Minnesota, and does not apply here. Call the Building Department at (208) 786-9131 for the current council-set fee. |
Solar Photovoltaic (PV) Permit
VerifiedRequired for rooftop or ground-mounted solar photovoltaic installations within the City of Kellogg. Solar is not one of the checkbox categories on the City's single combined Building Department Permit Application (new construction, additions, alterations, demolition, fence, re-roof, siding, signs, mobile/manufactured home setting, floodplain development) — a solar project would be submitted under the general new-construction/alteration scope of that same form for the structural/mounting portion. Electrical interconnection is issued and inspected by the State of Idaho (DOPL), not the City, consistent with Kellogg's standing arrangement for all electrical/plumbing/mechanical trade permits. Kellogg shares its contracted Building Official (Keith Teeters) with several other Shoshone County cities, but sets its own fees independently; no fee schedule for any permit type, including solar, was found published by the City; Kellogg building fees are set by council resolution rather than a published document. The electrical interconnection scope, handled by the State of Idaho DOPL rather than the City, DOES have a published, currently-adopted statewide fee schedule (IDAPA 24.39.10, Rule 500) that governs the electrical portion of a Kellogg solar PV project.
Verified 2026-07-20 · Source
Requirements
- Building permit required for the structural/mounting portion of a solar PV installation, submitted on the City's single combined Building Department Permit Application (no dedicated solar checkbox exists — use the general new construction/alteration scope)
- Two sets of plans (minimum 24"x18") required for the structural/mounting design, per the same requirement that applies to new construction generally
- Electrical interconnection is NOT issued or inspected by the City of Kellogg — permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety, 1-800-955-3044, dbs.idaho.gov), the same arrangement documented for all other electrical work in this record
- All building permit fees, including any solar structural fee, must be paid with cash or check only — no card payments accepted
Required documents
- RequiredBuilding Department Permit ApplicationOfficial City of Kellogg building permit application; no dedicated solar checkbox exists, so a solar project's structural/mounting scope is submitted under the general new-construction/alteration category on this same form
- RequiredConstruction Drawings / Site PlanTwo sets of plans (minimum 24"x18") showing panel/array layout, mounting/racking details, and structural connection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| City of Kellogg building/structural permit fee (mounting/racking portion) | Fees for all Kellogg building permits, including solar structural work, are set by resolution of the City Council rather than published in a fee-schedule document or the municipal code text itself; Show full citationHideFees for all Kellogg building permits, including solar structural work, are set by resolution of the City Council rather than published in a fee-schedule document or the municipal code text itself; no dollar figure could be independently verified after checking the City building department page, the Building Permit Application PDF, and the City Code index (kellogg.id.gov/City%20Code/). Confirm directly with Building Official Keith Teeters, (208) 786-9131. | |
| Idaho DOPL Electrical Permit — Other Installation (Including Industrial and Commercial) fee schedule (applies to solar/renewable energy interconnection since Kellogg has no local electrical-permitting program) | Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000–$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000; small work under $500 not involving a service change: $10 | IDAPA 24.39.10 (Rules of the Idaho Electrical Board), Rule 500.02.b, current administrative rule text as amended through 4-4-25 (adminrules.idaho.gov/rules/current/24/243910.pdf). Show full citationHideIDAPA 24.39.10 (Rules of the Idaho Electrical Board), Rule 500.02.b, current administrative rule text as amended through 4-4-25 (adminrules.idaho.gov/rules/current/24/243910.pdf). Statewide fee schedule administered by DOPL, since Kellogg defers all electrical trade permitting to the State. |
| Idaho DOPL Plan Check Fee | $65 minimum for one hour or less, plus $65 per additional hour | IDAPA 24.39.10, Rule 500.02.f |
| Idaho DOPL Requested Inspection Permit | $65 per inspection | IDAPA 24.39.10, Rule 500.02.c |
Electric Vehicle (EV) Charger / EVSE Permit
VerifiedThe City of Kellogg does not issue electrical permits at all — like all electrical, plumbing, and mechanical work, EV charger/EVSE circuit installation is permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety), not the City. No dedicated EV charger/EVSE fee category exists in IDAPA 24.39.10 (Rules of the Idaho Electrical Board): an EV charger circuit added to an existing residence is billed under the flat $65 Existing Residential Dwelling Unit Permit fee, while a commercial or multi-family installation is billed under the Other Installation (Including Industrial and Commercial) Permit's wiring-cost-tiered schedule — the same statewide schedule that applies in Idaho City and Jerome. The City of Kellogg publishes no fee schedule of its own (fees are confirmed by phone) and has no bearing on the electrical fee. A City building permit is separately required only if the installation includes a structural or mounting element such as a charger pedestal or canopy, submitted under the general new-construction/alteration category on the City's single combined Building Department Permit Application, since no dedicated EV checkbox exists — the same treatment solar gets.
Verified 2026-07-20 · Source
Requirements
- Electrical permit for the EV charger circuit is obtained through Idaho DOPL, not the City of Kellogg
- Governed by the National Electrical Code edition currently adopted by the State of Idaho as administered by DOPL, including NEC Article 625 (Electric Vehicle Charging System) provisions
- If a structural element (pedestal, canopy, or similar) is installed, a City of Kellogg building permit is required for that portion, submitted on the City's combined Building Department Permit Application (no dedicated EV checkbox exists; use the general new-construction/alteration category)
- All City of Kellogg building permit fees must be paid with cash or check only — no card payments accepted
- Contact Idaho DOPL directly at 1-800-955-3044 or dbs.idaho.gov for the electrical permit and current fee
Required documents
- RequiredIdaho DOPL Electrical Permit ApplicationState of Idaho DOPL electrical permit application; used for EV charger/EVSE circuit installation as no dedicated EV form is published
- OptionalBuilding Department Permit ApplicationCity of Kellogg combined building permit application; only required if the installation includes a structural/mounting element reviewed by the City
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Existing Residential Dwelling Unit Permit (DOPL) — applies to an EV charger circuit added to an existing home | $65 per inspection | IDAPA 24.39.10, Rules of the Idaho Electrical Board, Section 050.02 (Residential Permits, Existing Residential Dwelling Unit). Show full citationHideIDAPA 24.39.10, Rules of the Idaho Electrical Board, Section 050.02 (Residential Permits, Existing Residential Dwelling Unit). No distinct EV charger/EVSE fee line is published by DOPL; a Level 2/EVSE circuit added to an existing residence falls under this flat existing-dwelling-unit fee rather than the new-construction, square-footage-tiered schedule. Confirmed 2026-07-20 directly against DOPL's own published Idaho Electrical Board rules text. |
| Other Installation (Including Industrial and Commercial) Permit (DOPL) — applies to commercial/multi-family EV charging installations | Wiring cost not exceeding $10,000: $60 plus 2% of wiring cost. $10,001-$100,000: $260 plus 1% of the amount over $10,000. Over $100,000: $1,160 plus 0.5% of the amount over $100,000. | IDAPA 24.39.10, Rules of the Idaho Electrical Board, Section 050.06 (Other Installation, Including Industrial and Commercial, Permit). Show full citationHideIDAPA 24.39.10, Rules of the Idaho Electrical Board, Section 050.06 (Other Installation, Including Industrial and Commercial, Permit). Applies to a commercial or multi-family EV charging station installation rather than the residential dwelling-unit fee. Confirmed 2026-07-20 directly against DOPL's own published Idaho Electrical Board rules text. |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kellogg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.