Version history — Kellogg, Idaho
This is PermitBase’s own verified record for Kellogg, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Kellogg’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-21Superseded
- Kellogg, Idaho — adopted-codes record updated
- 2026-08-17Superseded
- 2026-07-23Superseded
- Kellogg, Idaho — adopted-codes record updated
- Kellogg, Idaho — Residential Building Permit (New Construction / Addition / Alteration) fee record added: City of Kellogg building permit fee (structural/valuation-based) (null)
- Kellogg, Idaho — Re-Roof Permit fee record added: City of Kellogg re-roof permit fee (null)
- Kellogg, Idaho — Fence Permit fee record added: City of Kellogg fence permit fee (null)
- 2026-07-20Superseded
- Kellogg, Idaho — Solar Photovoltaic (PV) Permit record added
- Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: City of Kellogg building/structural permit fee (mounting/racking portion) (null)
- Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Electrical Permit — Other Installation (Including Industrial and Commercial) fee schedule (applies to solar/renewable energy interconnection since Kellogg has no local electrical-permitting program) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000–$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000; small work under $500 not involving a service change: $10)
- Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Plan Check Fee ($65 minimum for one hour or less, plus $65 per additional hour)
- Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Requested Inspection Permit ($65 per inspection)
- Kellogg, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Existing Residential Dwelling Unit Permit (DOPL) — applies to an EV charger circuit added to an existing home ($65 per inspection)
- Kellogg, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Other Installation (Including Industrial and Commercial) Permit (DOPL) — applies to commercial/multi-family EV charging installations (Wiring cost not exceeding $10,000: $60 plus 2% of wiring cost. $10,001-$100,000: $260 plus 1% of the amount over $10,000. Over $100,000: $1,160 plus 0.5% of the amount over $100,000.)
- Kellogg, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added
- 2026-07-07Initial record — coverage of Kellogg began