Version history — Wallace, Idaho
This is PermitBase’s own verified record for Wallace, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Wallace’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-07-23Superseded
- Wallace, Idaho — Residential Building Permit (New Construction / Addition / Alteration) fee record added: Building Permit / Plan Review Fee (Not published)
- Wallace, Idaho — plan-review timeline record updated: 10–10 business days
- 2026-07-20Superseded
- Wallace, Idaho — Solar PV Installation (Building Permit + Certificate of Appropriateness) record added
- Wallace, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit) record added
- Wallace, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit) fee record added: State Electrical Permit — Existing Dwelling Unit Permit (residential EVSE circuit added to an existing home) ($65.00 per inspection (flat; no per-branch-circuit surcharge))
- Wallace, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit) fee record added: DOPL Electrical Permit — Other Installations (Including Industrial and Commercial) Permit (new construction, commercial, or multi-family EVSE) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,001-$100,000: $260 plus 1% of excess over $10,000; over $100,000: $1,160 plus 0.5% of excess over $100,000)
- Wallace, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit) fee record removed: State Electrical Permit Fee (EV charger/EVSE circuit)
- 2026-07-07Initial record — coverage of Wallace began